• Title/Summary/Keyword: Railway capacity

Search Result 480, Processing Time 0.036 seconds

Considering combined operation method with the wide area rapid-transit and high speed-transit for wide area traffic service offer at high speed track section (고속선구에 광역교통서비스 제공을 위한 고속철도와 급행전철 혼용운용 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Cha, Ki-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1900-1906
    • /
    • 2008
  • According as zone of life of big city is expanded by new city development etc.., need special skill master plan compensation which can be systematic for wide area traffic problem solution and confusion expense minimization in the metropolitan area because wide area of capital region traffic is gone continuously and continues. Accordingly, Kyonggi Province suggested rapid-transit railway achievement that can connect Seoul Gangnam in 20 minutes with Dongtan new city recently. MLTM(Ministry of Land Transport and Maritime Affaris) announced "Capital region railway network improvement plan research services (2007.12)" result that Gangnam High-speed railway route (Suse $\sim$ Dongtan $\sim$ Pyeongtaek) construction for offer High-speed railway service to capital region and Kyonggi southern part area inhabitantses and need to line capacity tribe solution by Seoul-Busan high-speed railway second-stage and Honam high speed railroad completion. Is judged that need examination about wide area rapid-transit railway combined application operation that take advantage of rail track reserve capacity of High-speed railway for utilization efficiency elevation of country and efficient investment of national finance according as High-speed railway and Gangnam rapid-transit railway route that is suggested in Kyonggi Province are overlaped. Therefore, in this research, I wish to quote investment efficiency plan of railroad business by that different kind's train is run in uniformity track by presenting combined application operation plan and working expenses curtailment effect etc. that is optimized through analysis of roadbed and E & M technology condition, intermediate station plan, train operation planning etc. in case of wide area rapid-transit railway and high-speed railway run combined application.

  • PDF

Study on Analysis for Power Consumption and Charge/Discharge Effect with BESS in AC High-Speed Electric Railway System (교류 고속철도계통에서 BESS의 도입을 위한 전력소비 및 충·방전효과 분석에 관한 연구)

  • Jeon, Yong-Joo;Kang, Byoung-Wook;Chai, Hui-Seok;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.9
    • /
    • pp.20-27
    • /
    • 2014
  • The power consumption pattern of high-speed railway has rarely during night time. But, during service time, the power is consumed irregularly related to train operation. Especially certain unusual about 1-2 days of service time interval to indicate the power consumption is rapidly growing phenomenon, which causes the capacity of the power contract is the annual electricity bill to rise rapidly as the cause. Normally, amount of peak power consumption bill rate at railway substation is over 20% of total electrical bill. Therefore, high-speed railway substation is expected to be considerably larger savings by reducing the peak power of the default charge(demand power).

Running Characteristics for On-Line Test of Railway Vehicle

  • Han, Young-Jae;Kim, Seog-Won;Seo, Sung-Il;Mok, Jin-Yong;Lee, Su-Gil;Kim, Young-Mo
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1347-1350
    • /
    • 2005
  • Recently, as the road capacity reaches a limit and environmental problems become serious, there exists a gradual increasing need for railway vehicles that are environment-friendly, punctual, reliable and safe. Accordingly, in addition to conventional railroad vehicles, lots of vehicles are being newly developed. Using the developed installed measurement system, the performance characteristics of railway vehicle could be monitored precisely. After recording the input real time data of each signal from railway vehicle to the network line, we could acquire the needed information through post processing program. We could verify the running performances of railway vehicle using this system. As a result, many latent defects have been found and corrected in the prototype train. The measurement systems have contributed to dramatic reduction of the developing period.

  • PDF

A Study on Reinforcement Effectiveness and Development of Design Method for Railway Roadbed by Geogrid (지오그리드를 활용한 철도노반의 보강효과 및 설계기법 개발에 관한 연구)

  • 심재범;신민호;신은철;채영수
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.526-533
    • /
    • 2001
  • Since 1970's in Germany and U.S.A., the studies on increasing the bearing capacity of railway roadbed using geogeid have been conducted for the repair, reinforcement, and extention of railways constructed on soft soils. In this study, the railway roadbed system reinforced with geogrids has been analyzed and investigated using finite element method and results of the previous studies were conducted in Korea and other nations. And the method for estimating the railway roadbed thickness was developed based on the equivalent method using the multi-layer theory and the deformation modulus Ev.

  • PDF

Suggestion to Improve the Railway Infra for Speed Increase of High-speed Train in Gyeongbu Line (경부선 고속열차 증속을 고려한 철도인프라 보강 방안)

  • Kim, Jung-Hun;Park, Dae-Geun;Won, Yong-Hoan;Kim, Man-Cheol;Kang, Young-Jong
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1249-1253
    • /
    • 2009
  • Enhancements of transport capacity in Gyeongbu line are continuous with the operating cost reduction and Korean economic development. Besides, requirements of a people about speed-up and customer service after the opening of high-speed railway(KTX) are being increased nowadays. Therefore, development and effort for speed increase of high-speed railway(KTX) have to be encouraged and supported by the government. In this study, market and technology trends for speed increase of high-speed train in Korea and abroad were investigated. As a result, we suggested to improve the railway infra for speed increase of high-speed train in Gyeongbu line.

  • PDF

A Study for Development of Integrated DC Railway System Analysis Algorithm (도시철도 급완행 통합해석 알고리즘 개발에 관한 연구)

  • Jang, Dong Uk;Kim, Moo Sun;Hong, Jae Sung;Lee, Hansang
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.4
    • /
    • pp.646-652
    • /
    • 2015
  • Increasing needs for rapid driving vehicles during rush hour, there are various researches how to operate or allocate rapid driving vehicles with the existing normal driving vehicles. In the aspect of power system, it should be preceded by an analysis for power equipment capacity. Also, it should be studied whether the added rapid driving vehicles gives a bad effects for stable operation of railway systems or not. In order to derive the results for these analysis processes, this paper suggest a novel analysis algorithm which can implement integrated analysis including rapid and normal driving railway vehicles simultaneously. This algorithm has been verified using Seoul Metro 7 Line data.

Capacity Determination of ESS for Peak Load Shaving Based on the Actual Measurement of Loads in the Substation of Urban Railway (도시철도 실측 부하에 기반한 첨두부하 절감용 ESS 용량 산정)

  • Park, Jong-Young;Jung, Hosung;Kim, Hyungchul;Shin, Seungkwon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.6
    • /
    • pp.860-865
    • /
    • 2014
  • This paper proposes the method for determination of the capacities of ESS (Energy Storage System) and PCS (Power Conditioning System) for the peak load shaving based on the load data in the substation of urban railway. In addition, this paper analyze the actual measurement of loads in the substation of urban railway. The load of a weekday in the substation of urban railway is high around rush hours in the morning and evening, which is different from that of a normal substation. The required capacities of ESS and PCS become larger as the amount of peak load shaving is higher, and are affected from the patterns of daily load in the substation.

Test operation and development of Automatic/Driverless operation system for the standardized type EMU (표준전동차 자동/무인운전기술 개발 및 시운전에 관한 연구)

  • 한성호;안태기;이수길;이관섭;김원경;최규형
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.172-179
    • /
    • 2000
  • The automatic/driverless operation which are great important techniques in metro railway are required to increase higher safety, greater reliability, and transport capacity. To satisfy such demands, we must have the system design iかd testing technique for the railway system operation. These techniques are related to the onboard train control and communication systems which include TCMS(Train Control md Monitoring System), ATO(Automatic train Operation), ATC(Automatic train Control), and TWC(Train to wayside communication). These sub-systems must be interfacing with not only each others but also the signal system on the ground. We tested the train control system on Test line that has been developed on the basis of the standardized type EMU for korea railway systems. This test line which is located in Sangju, have been constructed for testing 7 & 8 line of Seoul Metro railway.

  • PDF

Review Study on the Selection of Oversea Railway Alignment (해외철도 노선선정 사례의 검토)

  • Choi, Byoung-Pyo;Kim, Goon-Soo;Kwaun, Young-Chul;Kim, Dong-Ki;Cho, Hee-Su
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.402-406
    • /
    • 2006
  • There are two types of railway alignment design. First type is a modification of existing railway and second type is a planning of whole new alignment. Modification of existing railway would be more simpler, usually, main scope is improving a capacity with adopting standard track gauge, straighten intensively curved part. But planning new alignment should be considered various factors, not only topographic feature, but cultural, socio-economical, environmental factors. This paper is based on the performed project in the United Arab Emirates, the Arabian Peninsular, with Korea railroad corporation, Korea Rail Network Authority, and other skilled Korean design firms participated on May, 2006.

  • PDF