• Title/Summary/Keyword: Railway ballast

Search Result 283, Processing Time 0.029 seconds

Dynamic Analysis of Structure's Approaches through Field Tests in the Conventional Railway (현장계측을 통한 기존선 철도 구조물 접속부의 거동분석)

  • Park, Joon-Oh;Lee, Sang-Bae;Hong, Won-Pyo
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1864-1874
    • /
    • 2007
  • Korean trains pass many mountain areas, so the volume of structures like bridge and tunnel has large part of railway lines. Train speed-up naturally needs a straight line in railway, then structures are increasing, and the length of structure has more than 70% in Kyongbu high-speed railway. The stiffness of bridge and tunnel is higher than the soil in the roadbed in spite of dynamic difference in vibration and displacement. Differences in stiffness have more dynamic effects and increase the deformation and destruction in the track and roadbed. This influences passenger's comfort and the safety of operation, and it needs more track maintenance. This study selected tunnel with ballast track, tunnel with concrete track, and structure's approaches with short maintenance cycle in the roadbed and had track acceleration tests and track liner inspections using track master in the field. This study will measure periodically to structure's approaches which have very fast track irregularity and analyze dynamic differences and track irregularity near structure's approaches, so realize the cause of track irregularity of structure's approaches and use basic data for reasonably strengthening method of structure's approaches.

  • PDF

Three-dimensional finite element analysis of the interference of adjacent moving trains resting on a ballasted railway track system

  • Marwah Abbas Hadi;Saif Alzabeebee;Suraparb Keawsawasvong
    • Geomechanics and Engineering
    • /
    • v.32 no.5
    • /
    • pp.483-494
    • /
    • 2023
  • High-speed trains became common nowadays due to the need for fast and safe mean to transport goods and people. However, the use of high-speed trains necessitates the examination of the critical speed, which is the train speed at which the maximum settlement of the railway track occurs. The critical speed and railway track settlement have been investigated considering only one train in previous studies. However, it is normal to have two adjacent trains moving at the same time. This paper aims to understand how the interference of two moving trains affects the settlement and critical speed of ballasted railway track. Calibrated three-dimensional finite element models of railway track subjected to one moving train and two moving trains have been developed to address the aim of the study. It is found that the interference dramatically increases the railway track settlement with a percentage increase ranges between 5 and 100%. It is also found that the percentage increase of the railway track settlement depends on the train speed and the distance between the moving trains. In addition, it is found that the thickness of the ballast layer and the stiffness of the subgrade have minor influence on the percentage increase of the settlement. Importantly, the results of this paper illustrate the importance of the interference of the moving trains on the dynamic response of the railway track. Thus, there is a need to consider the dynamic interaction between the adjacent moving trains in the design of railway track foundation.

Research on Vibration and Noise Characteristics of Steel Plate Girder Bridge with Embedded Rail Track System (레일매립궤도 시스템이 적용된 판형교의 진동 및 소음특성에 대한 연구)

  • Park, Jeung-Geun;Koh, Hyo-In;Kang, Yun-Suk;Jeong, Young-Do;Yi, Seong-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.1
    • /
    • pp.94-101
    • /
    • 2019
  • Most of the existing rail structures have undergone a lot of aging since a considerable period of time has passed from completion. In particular, among existing railway bridges, many of the plate girder bridges are older bridges that have lived 40 to 60 years or more. Since the treadmill is directly connected to the girder without the ballast, the running load of the vehicle is directly transmitted to the bridge. Therefore, the shock and noise applied to the bridge are larger than those of the ballast bridge, and the dynamic shock and vibration are also relatively large. Therefore, it is very urgent to develop appropriate maintenance, repair and reinforcement technology for existing steel plate bridge. In this study, the authors introduced the characteristics of embedded rail (ERS) developed for improving the performance of the existing plate girder bridge and the techniques solving the vibration and noise problems. In order to evaluate the vibration and noise reduction performance of ERS, a non-ballast plate girder bridge with 5m length of sleepers installed and a plate girder bridge with ERS were fabricated. And, then, the vibration response generated under the same excitation condition was measured and analyzed. Also, the radiated noise analysis was performed using the vibration response data obtained from the experiment as the input data of the acoustic analysis model. As a result of experiments and analyses, it was confirmed that the plate girder bridge's vibration using ERS was reduced by 15.0~18.8dB and the average noise was reduced by 7.7dB(A) more than the non-ballast bridge.

Vibration Analysis of Station under Railway Lines with Floating Slab Track (플로팅 슬래브궤도를 적용한 선하역사 구조물 진동해석)

  • Jang, Seung-Yup;Cho, Ho-Hyun;Yang, Sin-Chu
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1719-1724
    • /
    • 2010
  • In the areas susceptible to vibration and noise induced by railway traffic such as downtown area and stations under railway lines, the vibration and the structure-borne noise can be solved by floating slab track system separating the entire track structure from its sub-structure using anti-vibration mat or springs. In other countries, the core technologies for vibration-proof design and vibration isolator - one of key components - have been developed and many installation experiences have been accumulated. However, in Korea, since the design technology of system and components are not yet developed, the foreign systems are being introduced without any adjustment. Thus, in this study, the vibration isolator has been developed and its performance are investigated by the dynamic analysis of a station structure under railways lines and the floating slab track system. For this purpose, the loads transferred from the vibration isolator of the floating slab track were evaluated by train running simulation considering vehicle-track interaction, and then the dynamic analysis of station structure subjected to these loads was performed. The dynamic analysis results show that the proposed floating slab track can reduce the vibration of structure by about 25dB compared with that in conventional ballast track without floating system.

  • PDF

Development of Design Chart for Investigating an Additional Rail Stress and Displacement on CWR(II) - Design Chart for Railway Bridge of Conventional Line (장대레일 부가축력 및 변위 검토를 위한 설계차트 개발(II) - 일반철도 교량 설계차트)

  • Choi, Il-Yoon;Lim, Yun-Sik;Yang, Sin-Chu;Choi, Jin-Yu
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.4
    • /
    • pp.574-581
    • /
    • 2009
  • Displacement of the bridge and additional rail stress due to interaction between track and bridge should be limited to the design criteria. Interaction analysis was conducted to investigate the displacement and additional rail stress on CWR in railway bridge of conventional line. Particularly, various parameters affecting interaction phenomena were taken into account in the analysis to enhance an applicability. These parameters included configuration of structure, stiffness of deck and support, steel/concrete bridge, ballast/concrete track and FM/MFM type etc. The results were presented in the form of the design chart which could be useful in preliminary design of the bridge.

Development of Design Chart for Investigating an Additional Rail Stress and Displacement on CWR(I) - Design Chart for High Speed Railway Bridge (장대레일 부가축력 및 변위 검토를 위한 설계차트 개발(I) - 고속철도 교량 설계차트)

  • Choi, Il-Yoon;Cho, Hyun-Cheol;Yang, Sin-Chu;Choi, Jin-Yu;Yu, Jin-Young
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.4
    • /
    • pp.565-573
    • /
    • 2009
  • Displacement of the bridge and additional rail stress due to interaction between track and bridge should be limited to the design criteria. Interaction analysis was conducted to investigate the displacement and additional rail stress on CWR in high speed railway bridge. Particularly, various parameters affecting interaction phenomena were taken into account in the analysis to enhance an applicability. These parameters included configuration of structure, stiffness of deck and support, steel/concrete bridge, ballast/concrete track and FM/MFM type etc. The results were presented in the form of the design chart which could be useful in preliminary design of the bridge.

A Behavior Analysis of Railway Steel Plate Girder Bridge in the applying Resilient Panel Track system (방진궤도시스템 적용에 따른 강철도 무도상 판형교의 거동 분석)

  • Lee, Si-Yong;Eom, Mac;Oh, Soo-Jin;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.437-446
    • /
    • 2006
  • The major objective of this study is to investigate the effects and application of improvement for railway steel plate girder bridge by resilient panel track system. It analyzed the mechanical behaviors of steel plate girder bridge with applying resilient panel track system on the finite element analysis and laboratory test for static & dynamic characteristics. As a result, the improvement of steel plate girder bridge with resilient panel track systems are obviously effective for the static & dynamic response which is non-ballast steel plate girder bridge. The analytical and experimental study are carried out to investigate resilient panel track system decrease vertical acceleration and deflection on steel plate girder bridge for serviceability. And the resilient panel track system reduced dynamic maximum displacements(about 59%) and stresses(about 82%), the increase of dynamic safety is predicted by adopting resilient panel track system. From the dynamic test results of steel plate girder bridge, it is investigated that vertical acceleration and deflection is very low with applying resilient panel track system. The servicing steel plate girder bridge with resilient panel track system has need of the reasonable improvement measures which could be reducing the effect of static and dynamic behavior that degradation phenomenon of structure by an unusual response characteristic and a drop durability.

  • PDF

Experimental Study on Development of A New Steel Fiber Concrete Slab Track (새로운 슬래브궤도 개발을 위한 실험적 연구)

  • Kang, Bo-Soon
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.111-116
    • /
    • 2003
  • The Permanent Way consisting of rails and sleeper laid on ballast is a technically and economically viable solution. After two decades of targeted research and development activities Slab Track turned out to be a reasonable option on special fields. Slab Track proves that especially under extreme condition and loads - they reliably help stability and a long service life of track. Technical and experimental solution of slab track are particularly underlined. This paper presents a few Results of the experiments of SFRC slab tracks under fatigue load.

  • PDF

A Study on the Track Irregularity Index for the Estimation of Track Quality (궤도품질평가를 위한 궤도틀림 지표에 대한 연구)

  • 오지택;한승용
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.450-457
    • /
    • 2000
  • This paper establishes a scheme to estimate track quality using standard deviation and deterioration rate of track irregularities. To provide index of quality, standard deviation and deterioration rate of track irregularities are analyed. As an index, standard deviation and deterioration rate were applied to decision of corrective maintenance and replacement maintenance, respectively. Further, this paper proposes a basic scheme for a modernization of mechanize track maintenance that using MTT(Multiple Tie Tamper) and Ballast Cleaner.

  • PDF

Unsupported Sleepers in Transition Zone between Concrete Slab Track and Ballasted Track : Phenomena and Its Countermeasures (고속철도 콘크리트궤도-자갈도상궤도 완충구간의 뜬침목 발생 현상과 대책)

  • Jang, Seung-Yup;Im, Oh-Jin;Yang, Sin-Chu
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1126-1131
    • /
    • 2007
  • In 1st Phase Kyeong-Bu High-Speed Line, to lessen the impact in the transition zone between concrete slab track(in tunnel) and ballasted track(on embankment), the ballast bonding method has been adopted. However, in this area, in the beginning of the operation, unsupported sleepers are found, and the track deterioration and damage of concrete sleepers have occurred. In this paper, the status and causes of unsupported sleepers are discussed and several repair measures are proposed.

  • PDF