Electric Power cable is the apparatus that receives electric power from the Korea Electric Power Corporation and supplies electric power to electric train and annex facilities of each railway station. With substantial ripple effect during power blackout accidents, such power blackout accidents must be coped with by discriminating the status of insulation deterioration of electric power cable in advance. Discrimination of insulation deterioration of the electric power cable is normally executed while the power is disconnected and it is very difficult to discover, at early stage, the insulation deterioration of the power cable in operational state since the duration of inspection is limited. This research aims to consider method of diagnosing the insulation deterioration of electric power cable in On-Line state rather than diagnosis in Off-Line state in order to secure reliability of power supply by reducing duration of power blackout (accidental blackout and blackout during works) and by seeking reduction in equipment and manpower used in diagnosis of deterioration through prevention of the accident itself prior to occurrence through early restoration of accident due to insulation deterioration of the electric power cable and assessment of performance of the cable under operation.
Urban railway system that leads the urban public transportation enables the passengers to use the subway system safely and conveniently by indicating the destination of, status of approach of and other information on train through Train Destination Equipment(TDE), which is one of the important passenger services. The existing system is composed of Host Station Equipment(HSE) and operator panel that receives necessary input on train information from Total Traffic Control System(TTC), Local Station Equipment(LSE) that controls Train Destination Indicator(TDI) installed at each station, and Train Destination Indicator that ultimately displays train information to the passengers using the train system. This study aims to realize stabilized and reliable announcement system for destination of train by considering processing procedure and method of expression of inputted information of the existing system of notification of announcement of destination of train that can be applied in the RFID, which is the base technology of USN for which service expansion is easy, and to realize system that considers interface with USN and expandability with other facilities in the future.
Bimodal Tram is spotlighted for alternative public transportation system which have punctualness, efficiency, and convenience running between capacity of bus and light rail transit. It have the advantage of automatic operation system when it runs at exclusive right-of-way as like as railway, runs as same as a bus at road concurrently. However, concrete construction plan is not established since the law as well as government subsidy are not defined. For activating bimodal tram construction, this paper analyzed as below. 1) understanding obstacles of activating construction through current status of local governments' bimodal tram promotion plan, 2) finding essential elements for legislation through transportation mode characteristics comparison and system rules analysis, 3) related foreign law analysis.
This paper presents a comprehensive analysis of intercity rail passengers' and travel patterns based on the 2001 Seoul-Busan rail passengers' Travel Survey. Results representing personal characteristics such as age and income seem to affect on destination the income was not seen to be a critical effect on destination choice. The variables such as travel time, transfer status, and date for travel seem to be and recreation activity. However, the destination choice would be relationship between Seoul and all four destination cities. The insights gained of an activity-based rail travel demand model.
Lee H.D.;Jeon Y.J.;Kim S.N.;Baek B.S.;Ryu S.P.;Seo K.D.
Proceedings of the KIEE Conference
/
summer
/
pp.953-955
/
2004
This paper describes the information transmission method using communication networks between Remote Terminal Unit(RTU) and Protection and Control system(PCU) of the direct current switchgear for Light Railway Vehicle, and also represents the test result, which carried out in the laboratory. In this test, transmission signal waveform, polling time, response time and request/response frame were measured between RTU and PCU. The field test including the measurements of analog signal and status of the digital logic operation of PCU will be conducted in near future.
An, Gang-Yell;Lee, Chang-Hun;Yoo, Keun-Su;Kim, Joung-Tea
Proceedings of the KSR Conference
/
2008.11b
/
pp.897-904
/
2008
The major objective of this study is to investigate the effective improvement plan for the curve sections in the conventional lines which the tilting train runs on. In order to the speed-up of conventional lines that have many curve lines, there needs a improvement construction of substructure such as the straight or double track work and so on. But in this case, it needs to have a plenty of the cost and the period. Therefore, the tilting train which provides the high-speed service effectively in curve tracks and is operating at abroad, was been studying to be suited to natural features. So, in this paper we investigate the improvement method at the sections only where need the extension of the transition curves, and the present status of them for the effective tiling train service using results which were examined on the preceding study which was the development of track system innovation technology for speed-up of them. And we look forward to playing a decisive role as reference material for the decision of the linear fitness in order to operate effectively on the conventional lines for the commercial service of the tilting train, on the basis of checking out the sufficient condition concerned in the track alignment and the velocity which are required in the railway construction rules and the design criteria.
Hu, Qin;Lam, Heung Fai;Zhu, Hong Ping;Alabi, Stephen Adeyemi
Smart Structures and Systems
/
v.21
no.4
/
pp.435-448
/
2018
This paper reports the development of a theoretically rigorous method for permanent way engineers to assess the condition of railway ballast under a concrete sleeper with the potential to be extended to a smart system for long-term health monitoring of railway ballast. Owing to the uncertainties induced by the problems of modeling error and measurement noise, the Bayesian approach was followed in the development. After the selection of the most plausible model class for describing the damage status of the rail-sleeper-ballast system, Bayesian model updating is adopted to calculate the posterior PDF of the ballast stiffness at various regions under the sleeper. An obvious drop in ballast stiffness at a region under the sleeper is an evidence of ballast damage. In model updating, the model that can minimize the discrepancy between the measured and model-predicted modal parameters can be considered as the most probable model for calculating the posterior PDF under the Bayesian framework. To address the problems of non-uniqueness and local minima in the model updating process, a two-stage hybrid optimization method was developed. The modified evolutionary algorithm was developed in the first stage to identify the important regions in the parameter space and resulting in a set of initial trials for deterministic optimization to locate all most probable models in the second stage. The proposed methodology was numerically and experimentally verified. Using the identified model, a series of comprehensive numerical case studies was carried out to investigate the effects of data quantity and quality on the results of ballast damage detection. Difficulties to be overcome before the proposed method can be extended to a long-term ballast monitoring system are discussed in the conclusion.
Lee, Hyun-Woo;Lee, Young-Joon;Park, Young Min;Lee, Jeongho;Yoon, Mikyung
Journal of Environmental Impact Assessment
/
v.13
no.6
/
pp.295-305
/
2004
After the Rio declaration on environment and development in 1992, developed countries are undertaking "environmentally sustainable transportation (EST)" projects. To meet the needs for EST, current transportation policies in Korea are rapidly reforming and one of its concerns is modernizing and upgrading railway freight system. Planning new railroad construction projects is increasing and subsequent environmental impact assessment (EIA) demands improvements, especially in both the EIA and decision making systems. In this paper, we discuss the present status of EIA for railroad construction projects, especially, by analyzing the EIA documents for the last six years. The EIA for railroad construction projects accounts for only 4.9% of total 918 project EIAs during 1998-2003, and the portion is gradually increasing. Major environmental concerns for EIA in railroad construction projects were geomorphological and ecological changes, protection of rare organisms, air pollution, water pollution, waste management, and noise, etc. We compared characteristics of environmental impacts of railroad construction with those of vehicle road construction, based on environmental and construction-planning indicators appeared in Environmental Impact Statements. Railroad construction usually requires longer tunnels and bridges for a given length than those for vehicle road construction. In addition, the amounts of geomorphological and ecological changes (road-cutting, embankment, devegetation, etc.) in railroad construction were generally less than 50% of those in vehicle road construction. To develop environmentally friendly railway systems, monitoring studies for environmental impacts of railroads such as habitat fragmentation and road kills, dispersal of alien plants, tunnelling effects on groundwater and vegetation, and noise impacts are highly recommended.
KSCE Journal of Civil and Environmental Engineering Research
/
v.42
no.6
/
pp.887-892
/
2022
Due to various reasons (normally financial constraints in developing countries), it becomes common to change of the business model from state-run projects to Private Investment Projects (Public Private Partnership) in the global railway businesses. However, due to the nature of railroads compared with other types of infrastructure such as roads and others, railway business require considerable construction cost and O&M cost through the business development, construction, and operation and management stages. Therefore, private investment railway projects, especially in developing countries, can be problematic in terms of the potential for uncertainty when return on investment cannot be guaranteed. In order to strengthen the competitiveness of domestic companies when entering overseas railroad PPP projects, this study proposes PPP-related risks and their countermeasures by reviewing global railroad trends and identifying Korea's weakness in managing international railroad projects.
Journal of Korean Society of Disaster and Security
/
v.15
no.4
/
pp.1-9
/
2022
This study analyzes the institutional status related to 'evacuation' and 'firefighting' in underground subway stations, derives institutional limitations for 'evacuation' in underground subway stations, and proposes guidelines in terms of architectural space based on this. As a result of the study, the following points were derived. First, since similar standards are separately enacted in individual laws and it is difficult to grasp the standards and they are dualized, it is necessary to standardize and regulate the space where users stay according to the movement of urban railway users, limited to urban railways. Second, in order to use trains, a special procedure called 'ticketing' must be considered, and regulations on evacuation safety zones and evacuation stairs between the waiting room and the platform are required. Finally, if there is a platform at a depth of more than 30m underground, it is necessary to install an evacuation floor in accordance with standards similar to the current building law.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.