• Title/Summary/Keyword: Railway Status

Search Result 253, Processing Time 0.023 seconds

A Study on the moving picture transmission method between the accident sites and control center (사고현장과 사령실간 화상전송기술에 관한 연구(III))

  • Cho B. K.;Chang S. G.;Choi K. H.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.1412-1414
    • /
    • 2004
  • Railway takes an important role of transporting massive passenger and freight. Accidents which occur related to trains have a risk of serious loss of lives, so those accidents need to be controlled urgently. Therefore moving picture transmission system is required which transmits exact information of moving picture of accident status to CTC and also communication line is also required with it. By using WTB line as a wayside transmission line, railway telephones, fax and train service information are provided to local offices. As transmission line improving project, optical cabling work is being processed by phases. Therefore optical fiber line is more effective way for a communicating way between stations than coaxial transmission line. This paper consider's connecting method when optical fibers is used for moving picture data transmission of train accidents and its problems.

  • PDF

Development of Real-time Safety Management System for Incident Prevention by Hazard Material Transport (위험물 운송사고 예방을 위한 안전관리시스템 개발)

  • Kim, Yeon Woong;Kim, Si Gon
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.105-113
    • /
    • 2015
  • The incidents related to transporting hazardous materials may cause serious impacts on neighborhood and surrounding areas. It is essential to have a real-time safe management system for incidents prevention of transporting hazardous materials. Currently, the system is not integrated into one channel, which makes it difficult to control an incidents response. Another problem is that event status is not appropriately shared among authorities having responsibilities taking down the incidents. This paper investigates previous studies covering the real-time safety management system for hazard material transports and suggests an integrated management system that helps communicate effectively and promptly.

A study on railway performance test management program building based on X-internet (X- 인터넷 기반의 철도성능시험관리 프로그램 구축에 관한 연구)

  • Ohn, Jung-Ghun;Kim, Myung-Ryoung;Yang, Doh-Chul
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.2096-2100
    • /
    • 2008
  • This research project management, building systems to test the performance requirements of a user to accept the plan and schedule management, personnel management, and test results, and the status of testing and reporting procedures to handle the process of implementation of Java-based X - Under the Internet environment, the default network, remote process research and development program as a test automation, structure and each module of the software analysis, design, analysis and clean-up and structure of the modules, each module and the GUI structure, performance, testing integration DB The present system is to study the system.

  • PDF

Analysis of the Finishing Failure in the Railway Station Platform and Deduction of Improvement Plans (철도역사 승강장 연단부 마감 탈락에 대한 원인 분석 및 개선 방안)

  • Ko, Sewon;Yu, Youngsu;Koo, Bonsang;Kim, Jihwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.46-53
    • /
    • 2022
  • The railway platform is an important facility closely related to the safety of passengers, trains, and images of railway facilities, and requires thorough facility management. However, the problem that the finishing material (plastering mortar) for the joint finishing of dissimilar materials (concrete+granite) falls off in the direction of the track at the platform podium is occurring multiple times across the country. Since these problems threaten the safety of train operation and the safety of passengers, immediate and continuous management is required. This study tried to derive improvement plans through the analysis of the drop-off problem of finishing materials occurring at the platform podium. The status of missing finishing materials for the platform podiums of about 200 railway stations and the related design and construction standards of the Korea National Railway were investigated. After that, the cause of the drop-off of the finishing material was analyzed, and as a result, it was found that the main cause was the boundary between the roadbed and the architectural process that occurred during construction. Subsequently, in connection with the derived causes and design, construction standards, (1) improvement of finishing materials or construction methods, (2) design of finishing materials that are easy to adjust height, (3) design of separate finishing methods, (4) improvement methods and durability were suggested.

A Study on the Industrial Difficulties Technology Support Platform using the Technology Coordinator (기술코디네이터를 활용한 산업체 애로기술 지원 플랫폼에 관한 연구)

  • Kim, Jong-Ki
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.3
    • /
    • pp.521-528
    • /
    • 2022
  • The beginning of a new railroad history is progressing every year. Seoul's Sillim Line is a new transportation system based on communication technology. Sillim Line is the nation's first wireless communication-based unmanned train control system based on KTCS-M, the national standard. The use of wireless communication technology in the rail transportation system suggests the possibility of exporting to the global rail market. This is the result of the government's development and implementation of various support policies for nurturing the domestic railway industry and for export. In this paper, the status of support for localization of railroad industry technology implemented by the state is reviewed, and the process by which railroad parts are replaced by localized parts is analyzed out of dependence on foreign countries. A study was conducted on the development of a technical support platform to solve the technical difficulties of the industry that occurred in this process.

Evaluation of the status of subgrade of high speed railway using HWAW method (HWAW방법을 이용한 고속철도 하부 노반 평가)

  • Park, Hyung-Choon;Park, Jin-O;Jin, Nam-Hui;Noh, Hee-Kwan;Bae, Hyun-Jung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.208-212
    • /
    • 2010
  • The high-speed railway consists of tracks, gravel ballast and subgrade, and the dynamic load is passed to subgrade through track and gravel ballast. The relaxation condition of the gravel ballast is able to be evaluate relatively and to be repaired through a continuous management, but it is difficult to evaluate the condition of subgrade, which is final part of supporting dynamic load and to repair it when made a problem. The gravel ballast and subgrade are evaluated by determining shear wave velocity. To evaluate ballast and subgrade, a good method to determine shear wave velocity is a non-destructive experiment such as surface wave tests providing a prompt experiment because an experiment in railway has a lot of tests which are carried out following railway directions and needs to prevent damage of the system. In general, a railway has limitation of an experimental space by narrow width, sleeper and etc., and background noise by a reflector exists. The existing surface wave tests need a minimum space, and it is difficult to get a reliable test results on account of background noise effect. Therefore, it is difficult or impossible to apply to existing surface wave test of subgrade and ballast. In this study, the HWAW method is applied to determine a shear wave velocity profile of the underground. The HWAW method is the experiment which is able to be carried out on a narrow space, and it determines share wave velocity of a site by measuring the wave from surface sources on the same spot. In addition, it removes effects of background noise accordingly to a signal processing using harmonic wavelet transforms, so it is useful to evaluate subgrade of a high-speed railway in the narrow space and the situation of background noise. In order to check an application of the HWAW method, an experiment is carried out on a high-speed railway field and a test result is compared to boring results.

  • PDF

The Status of Developments and Services of Maglev Systems (자기부상열차의 개발 및 상용화 현황)

  • Kim Kuk-Jin
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.206-210
    • /
    • 2005
  • The Maglev system is environmentally friendless system, has excellent running capabilities and lower life cycle cost. The Maglev has been developed by Germany and Japan since 1970's. Then, Transrapid of Germany, super high speed type, had started for commercial operating at Sanghai of China in the early of 2004. In March of this year, HSST of Japan, urban type, had been serviced at Tobukyuro Line which links between Nagoya and Aichi. Recently, in Korea, Maglev system has been reviewed for commercial application.

  • PDF

A Study for Characteristics of the Auxiliary Inverter in the 8200 Electric Locomotive (8200대 전기기관차 보조전원장치의 특성에 관한 연구)

  • Kim Jin-Yong;Lee Sang-Jun;Choi Jong-Mok;Kang Seung-Uk
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.237-244
    • /
    • 2005
  • The Auxiliary Inverter supply the power to Loads of Electric Locomotive. The Auxiliary Inverter have three characteristics. First, The Auxiliary Inverter is VVVF(variable voltage variable frequency) inverter. And, the output voltage is AC $0^{\sim}440V$. Second, The Auxiliary Inverter is controled all operations by CCU(Center Control Unit). Last, The Auxiliary Inverter have the SIBMON program. This program easily displays most of all status of auxiliary inverter.

  • PDF

Analysis of Status and Prospect for Practical Use of Urban Maglev train (도시형 자기부상열차의 실용화에 대한 현황 분석 및 전망)

  • Chung, Kyung-Ryul;Park, Chul-Ho;Yoon, Se-Kyun;Choi, Yong-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2006.11a
    • /
    • pp.113-122
    • /
    • 2006
  • To investigate the adequacy of maglev train system to future urban transport environments, first we derived minimum necessity requirements of the new-transit system by analyzing the issues in the urban transit management and new needs of transportation customers. Then the conformity of Maglev train to the requirements was examined. With respect to this adequacy analysis, policy directions and agenda of the making practical use of urban transit Maglev system' is proposed.

  • PDF

The Establishment of Multi Axial Fatigue Testing System for Rail Fastening Component/System (레일체결장치 다축피로시험장비 구축)

  • Kim, Eun;Kim, Tae-Wook;Park, Ok-Jung
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1156-1162
    • /
    • 2007
  • This paper describes overall background and current status of the establishment of multi axial fatigue testing system for rail fastening component/system. With above viewpoint, general features of rail fastening system, domestic/international testing standards, main features of testing system, application plan, etc. are summarized.

  • PDF