대한교통학회 1998년도 Proceedings The 4th International Transport Symposium
/
pp.45-51
/
1998
This paper is based on the science and technology development plan of Chinese railways, it has briefly described the big breakthrough achieved during the 'Ninth Five Year Plan' and has presented the outstanding symbol of science and technology level of Chinese railways by the year of 2000.
The government have plans to improve the railway transport capacity and transport hub for the sustainable national transport and logistics system. Specially, there are much efforts to improve transportation capacity such as high speed transportation of rail freight, enlargement of BT train, development of double stack train, etc. between railway transport hubs. If the transport capacity between railway logistics hubs is increased as planned, we must increase the handling capacity of railway hub terminals. But there are limits to enlarge the terminal infrastructure because of investment scale, location circumstances and urban development plans. To ensure the capacity, with the minimum required enlargement of infrastructure, it is necessary to extremely increase the efficiency of terminal operations. For improving the efficiency, we have to introduce the efficient terminal operation systems based on u-IT and operation optimize technologies. In this paper, we analyse the issues and problems of railway terminals(including ICD) and suggest the concept of intelligent railway terminal and the construction components of technology.
The railway project is an essential green transportation tool that is considered suitable for the domestic and foreign policy direction of carbon neutrality, but there are some limitations, such as damaging important carbon absorption sources during construction. This study analyzed the environmental impact assessment related to carbon absorption sources of greenhouse gas evaluation items conducted during the railway project, and limitations and implications were derived. The analysis of environmental impact assessment guidelines related to railway projects and carbon absorption sources dealt with prediction and reduction methods related to carbon absorption sources, but guidelines, including environmentally friendly railway construction guidelines, lacked descriptions. Since the greenhouse gas environmental impact assessment, 83 railway project environmental impact assessments have been reviewed, but in some cases, carbon absorption-related predictions have not been implemented, or carbon absorption-related reduction measures have been insufficient. In addition, there were cases where there was a limit to calculating emissions and reduction or where the reduction value was insignificant compared to emissions. In order to supplement the environmental impact assessment in the field of carbon absorption sources related to railway construction projects, alternatives such as quantitative emission and low reduction calculation, review of the no net loss system using the total environmental resource system, and linkage with climate change impact assessment are needed.
Railroad started from invention of stream locomotive at the beginning of the industrial revolution. Development of diesel and electric locomotives in railroad induced science and technology since the industrial revolution. Korean high-speed train so-called high-speed train project, is localized 86.7%(compared to price), 92%(compared to number of parts). This technology has been contributed to KTX since 2004. High-speed railway was developed to integrated system, which is contained high technology such as civil, mechanical and electrical technology. This effects to advanced technology across the board science, technology, industry. High-speed railway is fast, safe, comfortable, eco-friendly as next generation's representative transportation. Furthermore it is inaugurate the era of the new railroad. Korea is opened the high-speed railway following Japan, France, Germany, Spain. Korea became the fifth nation of the high-speed railway. It joins the rank of developed countries operating at the speed of 300km/h. Especially, KTX is emerging as advanced transportation with reducing logistics costs significantly due to time advantage and transportation revolution. The purpose of this study is to present the strategy through internal and external railway market's analysis for Korea railway system's globalization expansion(overseas expansion).
Railway signaling safety system organizes equipments and facilities of railway, increases transport efficiency and assures safe operation of railway. In the early days of signaling system railway managers made sure of safety by using relay logic technology based on fail-safe concept. But the development result of computer and science having been introduced to railway industry, railway signaling equipments begin to be operated through micro electronic control system. Accordingly high speed and high density operation of train became possible. Software reliability and safety technology that controls important systems of railway was highlighted. In the middle of 1990s the standard or guideline of railway reliability and safety were studied and established, and are being reviewing in Europe, Japan etc. Our reliability and safety technology have depended largely on foreign countries. In this study we performed a basic study about the reliability of software that controls the railway signaling system.
This study proposes a model for railway safety assessment with which the safety of whole railway system can be evaluated. The purpose of the assessment model is to generate safety indicators which quantitatively represent the degree of railway safety. Safety indicators were proposed as three indicators according to their functions; accident indicators, safety management indicators, and safety culture indicators. This paper describes the first result on the safety target which will be a key starting point toward the development of safety assessment model. It is recommended that the safety target to be composed of several sub-targets are apportioned to constituent components. It is concluded that the classification of safety target has influence on deciding components or attributes that constitute each sub-indicators; accident indicators, safety management indicators, and safety culture indicators. Based on this study, a railway safety assessment model will be developed in the following study.
Risk-based railway safety management has been mandatory in Korea as by relevant laws and regulations enacted since the Railway Safety Act 2004. In particular, the Railway Vehicle Safety Guidance came into effect on Jan 1, 2008 specifies the details of methodology for hazard analysis, risk assessment and safety verification and validation. Fundamentals for success of the risk-based safety management are systematic hazard identification and risk assessment by use of reasonable risk assessment criteria, but the principle of risk-based safety management has not been applied in an effective way to introduction and maintenance of railway vehicle systems because definite risk assessment criteria have not been set down for each railway system or railway network. The purpose of this study is to suggest a risk matrix development principle for risk assessment of domestic urban metro vehicles by analyses of relevant rules and railway operating environment of Korea.
In this study, a risk-appearance frequency evaluation model for railway level-crossing accidents is developed with the frequency estimation based on the accident history. It follows the worldwide common safety management approach and reflects the operation conditions and accident properties of the domestic railway system. The risk appearance frequency evaluation process contains a development of accident scenarios by defining the system configurations and functions, and a frequency estimation of hazardous events based on the accident history. The developed model is verified with the accident history during 5 years('03-'07) for 3 hazardous events: 'Being trapped in level crossing(Hl)', 'Crossing during warning signal(H2)' and 'Breaking through/detouring the barrier(H3)'. This risk appearance frequency evaluation model will be combined with a consequence evaluation model so as to offer full risk assessment for the railway accident. The accident risk assessment will contribute to improving the safety management of the railway system.
Recently the design of railway systems have been performed, based on the analysis of operational conditions and service targets, it is to optimize the effectiveness and efficiency of system operation. Many RAMS requirements have been developed to transform operation conditions into system design characteristics. However, our railway industry has not actived the application of RAMS into system design performance. According to short of RAMS application, many technologies that have been developed are not only applied the existing systems that is operating, but also have not succeed to apply for new systems. In order to design the effective and efficient railway systems that are optimized to operation conditions and service targets, a systems approach and RAMS management are necessary in railway development, operation and maintenance. Therefore, in this study, the RAMS performance requirement design methods are discussed. the allocation methods from system level to each devices of subsystems.
Recently, there are many problems of service qualities such as regular-rapid-safe -comfortable transport, that was traditionally advantages in urban railway transportations. These problems cause train delays that affects consecutive schedule, capacity, operation plans, and it is hard to prevent the propagation of delay and find the recovery solution. Because the urban transport demands is continuously increased and the railway service is also expanded, the railway operation company makes efforts to improve operation performance and efficiency for passengers. In this paper, we analyse the issues and problems existing in the major operation line of high-density urban railways, and suggest the development direction of intelligent operation technology to improve the urban railway service by minimizing the occurrence and propagation of delay. And the result of numerical case study is also presented.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.