한국형 무선통신기반 열차제어시스템 표준체계 구축을 위한 ATP 개발사양 연구 (System Specification of ATP for Standard System of KRTCS)

  • 오세찬;윤용기;김용규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.255-260
    • /
    • 2011
  • The train control system is a facility to ensure safe train operation, and its safety is the most important factor for system introduction. Therefore, in order to improve practical usability in the business, safety analysis and evaluation of train control system and train control related core technologies are needed. Korea Railroad Research Institute has carried out standard development of radio-based train control system as a government research and development project. In this paper, we present a system specification of ATP, a core part of train control system, for standard system of Korean radio-based train control system(KRTCS). The paper present a operation environment and primary ATP functions, and functional requirement specifications.

  • PDF

한국형 고속 전철을 활용한 기존선 속도향상 고찰 (Speed Up Test on conventional Line by using Korean High Speed Train(HSR-350x))

  • 김기환;박춘수;김석원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.334-338
    • /
    • 2004
  • KTX has started commercial service from Seoul to Busan and Mokpo since April 1, 2004. The service line is composed of new-high speed line and conventional line. Before KTX is runs, the maximum operational speed on conventional line was 140km/h. In order to reduce the traveling time, operation speed of KTX must be increased on the conventional line. So, we performed test running with prototype HSR-350x and verification of safety was made in $10\%$ speed-up. Korean High Speed Train HSR-350x) was developed by G7 - R&D project. In this study, in safety aspect, several technical reviews are introduced and the possibility for reduction of traveling time is investigated on the conventional line by using HSR-350x.

  • PDF

한국형경량전철 시험선의 관리 및 운영 (Management and operation of K-AGT test line)

  • 한석윤;전봉룡;이호용;이안호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.964-967
    • /
    • 2006
  • Korea Railroad Research Institute (the following 'KRRI') built AGT test line in Gyeong San-city, Kyongsang-bukdo province, Korea on August, 2004. This test line is exclusively used for the test of the driverless rubber-tired AGT system, and applied with research result of AGT System Development Project like vehicles, power supply, control and signaling, track and infrastructure system. The test line is available for the test of rubber tired AGT system's performance, function, safety. In this paper, we described the operation system of test line for the test of performance, safety, reliability, and also system operation in emergency. Finally we present the operation result of test line.

  • PDF

EN50128 SIL4 소프트웨어 프로세스 ISA 인증 사례 연구 (Study on ISA's assessment to software process for EN50128 SIL4)

  • 조치환;강찬용;황진호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.838-849
    • /
    • 2010
  • It is inevitable to control the systematic failure to obtain the software safety integrity of embedded software installed in rolling stock. Because it is not possible to assess systematic failure integrity by quantitative methods, SILs are used to group documentation, methods, tools and techniques throughout software development lifecycle which, when used effectively, are considered to provide an appropriate level of confidence in the realization of a system to a stated integrity level. Normally, safety approval process is through generic product, generic application and specification application for. For safety approval on generic application of software based system, it is required to apply the certified software processes from the planning stage for the assigned SIL. As such, we will develop project specific application with high safety integrity within time limit of contractual delivery schedule through software assessment to the modified area with the re-use of certified software module and documentation. At this point, Hyundai Rotem has developed software processes applicable to support SIL 4 based on EN50128 which was assessed and certified by TUV SUD. This paper introduces the Hyundai Rotem's detailed approach and prospective action to achieve software safety integrity level.

  • PDF

무인 경량전철 가용도 산정 및 검증에 관한 연구 (A Study on the Estimation and Verification of the Availability of the Unmanned Light Railway)

  • 권상돈;송보영;이희성
    • 한국안전학회지
    • /
    • 제34권1호
    • /
    • pp.108-114
    • /
    • 2019
  • Unattended Train operation(UTO) requires higher safety target than other systems, since all train operations are automatic. The system provider to deliver without accident or failure, and the operator to transport passengers without accident by putting all trains supplied, including them, into service. Safety rates without such failures can be represented as indicators of RAMS, among which availability is continuously controllable to achieve the target, with a clear target. Availability is often required by the licensee from the initial stage of the project to demonstrate that the request for proposal (RFP) is usually specified and to maintain separate availability targets at the operational stage. In particular, unlike unmanned operation light rail in complex systems, simple formulas are often presented to facilitate verification at each stage. This paper presents this method of usability calculation in an integrated manner at all levels and analyzes the existing usability values to ensure reliability of the availability formula for integrated use in unmanned light rail systems.

Research on Facility Layout of Prefabricated Building Construction Site

  • Yang, Zhehui;Lu, Ying;Zhang, Xing;Sun, Mingkang;Shi, Yufeng
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.42-51
    • /
    • 2017
  • Due to the high degree of mechanization and the good environmental benefits, the prefabricated buildings are being promoted in China. The construction site layout of the prefabricated buildings has important influence on its safety benefit. However, few scholars have studied the safety problem on it. Firstly, in order to give a follow-up study foreshadowing the characteristics of prefabricated buildings are analyzed, the research assumptions are given and three types of safety buffers are established. And then a mult-objective model for the prefabricated buildings site layout is presented: taking into account the limits of noise, the coverage of the tower crane and the possibility of exceeding boundaries and overlapping, the constraints are and designed established respectively; Based on the improved System Layout Planning (SLP) method, the efficiency\cost\safety interaction matrices among the facilities are also founded for objective function. For the sake of convenience, a hypothetical facility layout case of the prefabricated building is used, the optimal solution of that is obtained in MATLAB with particle swarm algorithm (PSO), which proves the effectiveness of the model presented in this paper.

  • PDF

신도림 역사 확장을 위한 철도횡단 건설공법 검토 (Railway Undercrossing Construction Method for the Shindorim Station Platform Extension)

  • 유제남;구자갑;이희영
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2008년도 추계 학술발표회 제20권2호
    • /
    • pp.887-890
    • /
    • 2008
  • 신도림역사는 서울시 지하철 2호선과 경부선,호남선 및 경인선 등 국유철도가 환승하는 정거장으로서 우리나라 최대의 도시철도 환승 승객과 최대의 열차 운행이 이루어지는 매우 중요한 교통의 요충지 이다. 혼잡도가 극심하여 이를 해소하고자 2호선 신도림 역사 확장계획을 수립하였는 바, 본공사 시행에 있어서 가장 어려운 과제인 국유철도 하부통과계획에 대하여 안전하고, 효과적인 방안을 모색하였다. 역사 확장 공사를 시행함에 있어서 국유철도 노반 하부를 비개착 공법에 의하여 안전하게 통과하는 방안에 대하여 국내에 적용되고 있는 공법 중 적용 가능한 공법에 대하여 검토하여 최적의 방안을 도출하고자 하였다. Front-Jacking 공법, NTR 공법, TRcM 공법을 주요 공법으로 검토하였으며 설계단계에서는 Front-Jacking 공법에 지반강성보강을 위한 PRS 공법이 복합된 방안을 적용하였다.

  • PDF

궤도구조 성능검증체계 및 선정프로세스 구축 (Development of Verification System and Selection Process for Track Structure)

  • 이호룡;장승엽;김연국;윤성순
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.292-298
    • /
    • 2010
  • Recently, with the beginning of the commercial operation of high-speed railway, there have been a number of changes in track structure fields. Also, it is expected that the development and introduction of new technology will be increased afterwards. However, it accompanies a lot of risk to install new track structures of which performance and safety are not verified on permanent ways with high traffic density. Therefore, to minimize the risk and enhance the adoption of new technology, it is required to develop a systemic verification system for track structure. To do this, in this paper, main contents of a draft of guidelines for track structure verification, and main issues in debate such as criteria and method for verification, test conditions and test periods are discussed. Also, a process to choose a most appropriate one for a specific project out of proven track structures by the above verification system, the selection process by the technical investigation committee and the VE process to analyze the economical and maintenance aspects based on LCC concept in Korea Rail Network Authority is introduced.

  • PDF

한국형 고속전철의 기존선 주행 진동가속도 특성 분석 - 곡선 통과속도 중심으로 (Analysis of the Acceleration Characteristics on the Conventional line for Korean High Speed Train- in il point of passing speed on the curve)

  • 김영국;김석원;목진용;박찬경
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2004년도 춘계학술대회논문집
    • /
    • pp.222-227
    • /
    • 2004
  • Korean High Speed Train(KHST) has been tested on the high speed test line in Osung site, since it was developed through the G7 Project Plan in 2002. It was also tested on the conventional line such as KyongBu and Honan Line to know the possibility of increasing the limited speed for the high speed trains. This paper introduces the method to improve the speed on the conventional line with body lateral acceleration among the several considered issues and explains the parameters related to those analysis, such as the cant deficiency, the radius of curve, speed and etc. When a train pass on the curved track, the lateral accelerations of body are divided into the quasi-static and the maximum accelerations according to the UIC 518 which is the international specification for testing and approval of railway vehicles from the point of view of their dynamic behaviour, especially for safety and ride comfort. This paper shows that it is safe and comfort from the results of test when KHST runs on the conventional line with the curves and proposes that the limited speed of conventional curved line could be changed to a little higher speed if the analysises of other fields are completed.

  • PDF

Importance of Construction Sequence in Numerical Modeling for Underground Structure

  • Park, Yang-Hoo;Cho, Kook-Hwan
    • International Journal of Railway
    • /
    • 제9권1호
    • /
    • pp.21-26
    • /
    • 2016
  • When excavation under existing structure is planned for a new construction project, the underpinning method is one of the most applicable construction methods. This study introduces a new modified underpinning method which is applied to construct a new subway line in Seoul Metropolitan. The new subway line was designed to pass underneath the existing subway line. Existing subway line carries about 2 million passengers daily, which is 33% of total passengers using subway in Seoul, and is the only circulation line in Seoul. Subway trains are passing 540 times through this section in a day. By applying a new underpinning method, the subway box structure of line is exposed 54m in the air supported by bearing piles. The proposed method was carefully monitored using heavy instrumentation system during construction. This study proposed and verified the application of the modified underpinning method, which can reduce construction period by 1.5 times and the construction cost by 1.2 times comparing with conventional method. The importance of considering construction sequence is investigated and verified by analyzed data non-considering construction sequence. The unexpected heaving which can bring up a dangerous situation for train running stability were measured, so this study shows that the upward movement has to be analyzed in designing process. As the use of underground space increases, the proposed method can be a good example of underground development.