• Title/Summary/Keyword: Railway Safety Project

Search Result 120, Processing Time 0.028 seconds

A Study on the RAMS Activity of KTX2 CTC (경부고속철도2단계 열차집중제어장치(CTC) RAMS활동에 대한 연구)

  • Han, Chan-Hee;Ahn, Jin;Cho, Woo-Sick
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1167-1173
    • /
    • 2011
  • This study is described for the RAMS activities of performed to 2008.12 ~ 2010.10 KTX CTC Project. RAMS activities follow EN50126, EN50128, EN50129. CENELEC standards(EN50126, EN50128, EN50129) to the System Development Life-cycle are defined. This study is RAMS activities of life-cycle that can be found to satisfy SIL2. In addition, assessment of the ISA was completed. This paper is describe RAMS activities results of each phase and Safety Case according to Verification/Validation result.

  • PDF

A Study on the Top Level Functional Analysis for the Automated Guideway Transit Used by System Engineering Tool (시스템 엔지니어링 툴을 이용한 경량전철의 상위시스템 기능분석 연구)

  • 이우동
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.202-207
    • /
    • 2002
  • The rubber type AGT system is operated by driverless that signaling is CBTC type. The system function is acomplished exactly to obtain the safety and reliability of system and the system is designed to minimize risk. In order to design the system, the functional analysis is performed. Recently functional analysis is performed by RDD-100 which is used and verified by aerospace, military, etc. Therefore, The design tool RDD-100 is used to perform functional analysis in AGT system development project.

  • PDF

h Study of Occupant Responses in KHST Croshworthiness (충돌사고 유형에 따른 KHST의 승객거동에 관한 연구)

  • 윤영한;구정서
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.398-404
    • /
    • 1999
  • Safety of passengers in the Korean High Speed Train, KHST, was evaluated under the different accident scenarios. Preliminary occupant analysis has been performed based on the TGV-K train seat characteristics. The influence of the vehicle deceleration and passenger type, seating positions, effectiveness of compartmentalization have been evaluated in terms of occupant injury criteria. This study is the final result of the occupant analysis of KHST project at 1st stage 3rd year.

  • PDF

On Enhancing Train-Centric Train Control System Development Process using DSM-based Safety Management (DSM 기법에 따른 안전 관리를 통한 차상중심 열차제어시스템 개발 프로세스의 개선에 관한 연구)

  • Kim, Joo-Uk;Oh, Seh Chan;Han, Seok Youn;Kim, Young-Min;Sim, Sang-Hyun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.3
    • /
    • pp.129-138
    • /
    • 2016
  • The train-centric control systems development has some distinct points in that a big size of government budget is in general expended in there and the development duration seems to be long. In addition, the changes are ever made continuously in the capability and operational requirements for Trains. Thus, the impact of the potential changes in the required operational capability on the development activities can induce some type of project risks [7]. As such, proper management of project risk has been one of crucial subjects in the train systems development. All these notes combined together make it the significance of the safety management process be raised further up in the train-centric control systems development. As such, the underlying safety management process should be capable of appropriately handling the potential risks that can be created due to the unexpected changes and the long-term development period. The process should also be complemented for the safety consideration of train-centric control systems, for instance, stop. To study these aspect is the objective of the paper. To do so, a step-by-step approach to analyzing the safety management process is first presented. Then, to enhance the process some necessary and useful activities are added in terms of risk and safety management. Then, to pursue some enhancement on the process, a set of necessary and useful activities are added in terms of risk and safety management. The resultant process is further analyzed and tailored using a design structure matrix method. The resultant process is applied in a train-centric control development as a case study.

Estimating Relative Risk Level of Construction Work (건설공사 상대적 위험도 산정)

  • Son, Ki-Sang;Yang, Hak-Soo;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.

The main considerations in the design and safety assessment case study for Deep & Large size of Tunnel station (대심도 대단면 터널정거장 설계시 주요고려사항 및 안정성 평가에 대한 사례 연구)

  • Jang, Sun-Jong;Hong, Jong-Wan;Jeon, Ki-Chan;Kim, Young-Min;Paik, Jin-Wook
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.462-469
    • /
    • 2011
  • The design of high-depth and large-section tunnel facilities has been increased lately. The purpose of the design is to avoid inference of existing facilities, enhance public relations and reducing the size of the station, which is advantageous for effective use of underground spaces. Diverse downtown tunnel experience, advanced excavation equipment, reinforcement methods, monitoring technologies and numerical analysis made the design possible. This paper is to introduce the design of high-depth and large-section tunnel facilities via Gimpo airport area of Deagok-Sosa railway BTL project of double-tracking.

  • PDF

A Study of Equipment Improvment method of the Expansion joint & Air Section in Rigid Trolley Bar System (AL T-Bar) (강체전차선방식(AL T-Bar)에서의 Expansion joint 및 Air Section 설비 개량방안 연구)

  • Yoo Jeung-Sang;Jang Woo Jin;Lee Byung-Song
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.523-528
    • /
    • 2003
  • AS City traffic means, the electric railway of the role is overwhelming with recognizing good merits of safety, no environment disruption and accurate destination time. Currently, Korea subway are running about 290km through eight subway lines. The latest constructed subway had been made by imperoved matherials which is going on improving. Therefore, we researched this project to keep up facilites easily, repress a leakge current and reduse install cost and repair time in changing facility at overhead Contact wire system because of arc by reforming construction plan about Expansion Joint and Air Section which is regarded as weak point when facilities are fixed and maintianed of Rigid Trolley bar System. as above we can contribute various part to making useful O.C.S(overhead contact wire system)

  • PDF

Reliability Allocation Model for KTX-II High Speed Train (KTX-II 고속 차량을 위한 신뢰도 할당 모델)

  • Lee, Kang-Won;Chung, In-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.319-326
    • /
    • 2007
  • During the design phase of a system, which requires high reliability and safety such as aircraft, high speed train and nuclear power plant, reliability engineer must set up the target system reliability. To meet a reliability goal for the system, reliability allocation should be done gradually from the system to its element. For this end, first of all, we need to construct functional block diagram based on the design output and PWBS(Project Work Breakdown System). Another important input data for reliability allocation is the relationship between the cost and the reliability. In this study we investigate various reliability allocation models, which can be applicable to aircraft, vehicle, and power plant, and etc. And we suggest a proper reliability allocation model which can be effectively applicable to KTX-II high speed train to achieve the target system reliability.

Development of fundamental technology for dynamic analysis of the high speed EMU (Electric Multiple Unit) (동력분산형 고속철도 주행성능 동역학 해석을 위한 기반기술 개발)

  • Yoon, Ji-Won;Park, Tae-Won;Jun, Kab-Jin;Park, Sung-Moon;Kim, Jung-Bum
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.380-386
    • /
    • 2008
  • The development of a new railway vehicle is under progress through the Next Generation High-Speed Rail Development Project in Korea. Its aim is to develope fundamental technology of the vehicle that can run over 400km/h. The new distributed traction bogie system, 'HEMU'(High-speed Electric Multiple Unit), will be used and is different from that of previously developed high speed railway vehicles. Previous vehicles adopted push-pull type system, which means one traction-car drives rest all of the vehicle. Due to the difference, investigation on dynamic behavior and its safety evaluation are necessary, as a part of verification of the design specification. In the paper, current progresses of researches are presented. And the High-Speed Railway vehicle system is evaluated for a dynamic characteristic simulation. Proper dynamic models including air-suspension system, wheel-rail, bogie and car-body is developed according to the vehicle simulation scenario. The basic platform for the development of dynamic solver is prepared using nodal, modal coordinate system and wheel-rail contact module. Operating scenario is prepared using commercial dynamic analysis program and used for development of dynamic model, which contains many parts such as carbodies, bogies and suspension systems. Furthermore, international safety standard is applied for final verification of the system. Finally, the reliability of the dynamic model will be verified with test results in the further researches. This research will propose a better solution when test results shows a problem in the parts and elements. Finally, the vehicle that has excellent performance will be developed, promoting academic achievement and technical development.

  • PDF

Rolling Stock Fire Engineering aspect of System Engineering (System Engineering 측면에서 전동차 화재기술관리)

  • Chang, Jung-Hoon;Kang, Chan-Yong
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.163-168
    • /
    • 2005
  • In case of rolling stock, SEMS is generally applied in the advanced countries, but is start stage in our country. SEMS is defined the system engineering management system in order to achieve the optimized train performance among the several client requirements aspect of technical engineering management during the design life cycle. And the fire engineering activities in hong kong EMU project are introduced aspect of SEMS in this paper. The fire engineering at rolling stock in view of SEMS controls to apply the satisfied interior material by the fire safety standards (regulation of the commute urban subway safety guideline by the MOCT, BS 6853, NFPA 130, NF F 16-101) and to minimize the fire load in order that passengers egress safe from the fired rolling stock. The rolling stock in the advanced countries is designed to stand for 15-20 minutes in considering the rolling stock to be fired in tunnel. For passenger fire safety, the passenger evacuation provision and progress is set up.

  • PDF