• 제목/요약/키워드: Railway Safety Project

검색결과 120건 처리시간 0.177초

시스템 수명주기 관점에서의 철도시스템 RAMS 관리 방안 (Management of RAMS for Railway System in view of System Life Cycle)

  • 이창환;박병노;안헌찬
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.221-225
    • /
    • 2011
  • The railway system consists of many items such as sub-systems, equipments and parts to accomplish the required function. Also the railway system is very complex system that these items are connected with interface among items. According with this complexity, the process of system engineering is applied to the construction of new railway project to manage systematically. In addition, the research about system engineering is progressing in recent. The RAMS management is one part of system engineering, and is to assure the required safety and performance. Also, this RAMS should be managed through system life cycle. This paper show the case study of management of RAMS during construction and operation phase in respect of system life cycle. As a result of this research, the best way of RAMS management based on system engineering in operation phase for railway system is suggested.

  • PDF

Formal Validation Method and Tools for French Computerized Railway Interlocking Systems

  • Antoni, Marc
    • International Journal of Railway
    • /
    • 제2권3호
    • /
    • pp.99-106
    • /
    • 2009
  • Checks and tests before putting safety facilities into service as well as the results of these tests are essential, time consuming and may show great variations between each other. Economic constraints and the increasing complexity associated with the development of computerized tools tend to limit the capacity of the classic approval process (manual or automatic). A reduction of the validation cover rate could result in practice. This is not compatible with the French national plan to renew the interlocking systems of the national network. The method and the tool presented in this paper makes it possible to formally validate new computerized systems or evolutions of existing French interlocking systems with real-time functional interpreted Petri nets. The aim of our project is to provide SNCF with a method for the formal validation of French interlocking systems. A formal proof method by assertion, which is applicable to industrial automation equipment such as interlocking systems, and which covers equally the specification and its real software implementation, is presented in this paper. With the proposed method we completely verify that the system follows all safety properties at all times and does not show superfluous conditions: it replaces all the indoor checks (not the outdoor checks). The advantages expected are a significant reduction of testing time and of the related costs, an increase of the test coverage rate, an answer to the new demand of railway infrastructure maintenance engineering to modify and validate computerized interlocking systems. Formal methods mastery by infrastructure engineers are surely a key to prove that more safety is not necessarily more expensive.

  • PDF

무인자동운전 경전철시스템 고가교량의 비상운전 중 안전성평가 (Safety Evaluation of Elevated Guideway during Abnormal Operation on LRT of Driverless Automatic Driving System)

  • 손은진;김민수;임영수;임종필
    • 한국철도학회논문집
    • /
    • 제9권1호
    • /
    • pp.29-35
    • /
    • 2006
  • Trains in LRT(Light Railway Transit) system usually have shorter car length than metro's because of their smaller passensers demand. Therefore it is very likely that the load condition of LRT system in abnormal operation, in case of which trains are in close proximity by system broke or train rescue works, could be worse rather than in normal operation, in spite of rare probability of abnormal operation. In this study, the target reliability indexes of several abnormal operations are estimated in accordance with the occurrence probabilities of each abnormal operation case and the reliability index of normal operation presented by the specification. From the indexes, load factors for the abnormal operation cases are estimated and the safety evaluation is performed for Yong-in LRT project.

국가연구개발프로젝트의 성과물 검증 프로세스 개발에 관한 연구 (Develop the Product Verification Process for the National R&D Project)

  • 최요철;이재천;조연옥;김상암;윤혁진
    • 한국철도학회논문집
    • /
    • 제12권3호
    • /
    • pp.382-387
    • /
    • 2009
  • 일반적으로 고객의 요구사항을 시스템이나 서비스로 구현하는 과정에서 구현된 시스템이나 서비스들이 요구사항을 만족하여 개발 되었는지를 검증하게 된다. 그러나 철도분야의 안전체계나 안전기준을 개발하는 국가연구개발프로젝트의 경우 일반적인 검증 프로세스를 활용하여 이러한 성과물을 검증하는데 많은 한계가 있다. 본 연구에서는 국가연구개발프로젝트를 통해서 산출되는 안전체계, 안전기준, 프로세스 등의 성과물에 대한 체계적이고 효과적인 검증 프로세스를 제시하였으며, 성과물 검증 프로세스의 결과물을 전산 관리할 수 있는 방안 또한 제시하였다.

서울메트로의 베트남 철도사업 프로젝트 (Seoul Metro's railway project to Vietnam)

  • 손영진;정수영;이종성;최시행
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1458-1465
    • /
    • 2008
  • With 34 years of accumulated operating experience, Seoul Metro has launched a project aimed at exporting second-hand trains(used EMU cars) to Vietnam while seeking measures for diversifying its business such as the construction of the metropolitan railways both at home and abroad, and operating business as a way of fiscal consolidation and management improvement. Therefore, Seoul Metro has moved ahead with this plan considering that there's no legal constraints on durable period of rolling stocks in advanced countries where the vehicles have been used for 35 years or longer than 40 years through renovation such as safety inspection and comprehensive maintenance program, and the railway systems for the replacement are expected to reach 838 cars by 2015 with growth of 100 cars a year. Seoul Metro strives to create value for boosting revenues and recycling resources by sending used EMUs to Vietnam. Seoul Metro will also provide under-developed countries with cars at a low price as well as share the accumulated railway technical know-how so that it can promote the national image and obtain the pre-emptive effect of metro railways in Vietnam.

  • PDF

고속철도 시스템의 성능검증 및 안전인증체계 구축방안 (Development of the Performance Criteria and Safety Certification System for KHST)

  • 김상암;왕종배;조연옥;홍용기
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.192-199
    • /
    • 2004
  • In this paper the arthurs introduce the performance verification for Korea high-speed rail system developed at G7 project, how to draw basic provision requirements in the process of construction of national safety criteria certification system, and definition of basic requirements to make safety criteria at each subsystem and technology field in the future.

  • PDF

KHST 차량성능 시험에 대한 안전체계에 의한 분석 (The Analysis on the Safety Plan of Train Performance Tests KHST)

  • 이찬우;최성훈
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(III)
    • /
    • pp.312-315
    • /
    • 2003
  • The KHST vehicle, with the maximum speed of 350km/h, is being developed under the en national R&D project and we investigate the performance test procedure of the vehicle considering the safety plan. First, important issues in the safety plan for the KTX vehicle are reviewed and then they are reflected in the test procedure for the KHST vehicle.

  • PDF

분당선 지능형열차제어시스템 (MBS) 시범설비구축 사업에 관한 고찰 (Study for trial project of Intelligent Train Control System (MBS) at Korail Bundang Line)

  • 김윤배;윤호석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.339-342
    • /
    • 2008
  • In this paper, the lessons and learns are introduced from the result of the trial project which is the first CBTC(Communication Based Train Control System) at Korail Bundang Line. This project has started end of 2002 and finished recently by Samsung SDS. The main purpose of this project was that new technology was seek for next generation of railway signal control system adapted in Korea. In 2002, there was no any revenue service system using Radio Frequency CBTC in the world at that time. Just a few trial project was on going in USA and EU. In well developed cities, the metro system have been built and old enough therefore they have to be considering re-signalling their existing system with advanced system for increasing availabilities of line usage and safety. This Bundang Line Trial Project was the first Korean CBTC project for above reasons. Most sub systems have been developed using local technology such as Electronics Controlled Interlocking System and Track Circuit Systems etc. Specially, in this project the RF-Communication devices are developed by local technology using DSSS(Direct Sequency Spread Spectrum) instead of FHSS(Frequency Hopping Spread Spectrum). This project has lasted for more than five years originally planned for three years because it was only accessible only night time in the main line from Ori to Suseo about 20km long. Each night only 2 and half hours are available to use the main line. Now the trial project has been done successfully with meet the customer's requirement, therefore the upgrade the mainline of Bundang line and another extension area up to Wangsipli to make revenue service using this new technology. This paper shows this result of the trial project and the strategy of upgrade and extension project as well.

  • PDF

철도종합안전기술개발사업에서 SEMP의 활용을 통한 프로젝트 관리방안 (On the Project Management utilizing the Systems Engineering Management Plan in the Railroad Safety Technology R&D Program)

  • 김재철;이재천;조연옥;김상암;한순우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1798-1805
    • /
    • 2010
  • The Railroad Safety Technology R&D Program has been supported by the Ministry of Land, Transport and Maritime Affairs. The Program consists of dozen or more projects and thus is quite complex, which requires effective project management. This paper is discussing how to effectively manage the railroad safety technology R&D program based on systems engineering management plan (SEMP). The key issues dealt in this paper include the SE management, requirements management, verification and validation, integrated data base management, and traceability management. To achieve the goal, we first defined an appropriate SE process to be adopted in the program and the result was documented in the systems engineering management plan. According to the process defined, we set up the environmental frame in database. Using the database and SEMP, each project of the program was verified with respect to the corresponding requirements utilizing the traceability. All these efforts were carried out using a computer-aided SE tool, which enables efficient management of complex database.

  • PDF

경량전철 전문가 양성을 통한 PM/SE 사업 활성화 방안 연구 (A Study on the Activation of PM/SE Business by Training LRT system Specialists)

  • 최성환;이종성;이대원;이기수;정수영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.458-464
    • /
    • 2008
  • The objective of this paper is to seek an alternative to figure out appropriate ways since difficulties lie in the introduction of LRT system to be operated by governments and self-governing local governments in the country. This situation can act as a main cause of breakdown in domestic railway industry by deepening of outflow of national wealth and technological dependency. Policy makers are required to get awareness of justification and necessity of Project management such as project strategy, goals, operating budgets, risks, investment revenue prior to preparing the outline of the introduction of LRT system shall consider securing budget in light of performance, reliability, and safety withe the help of system engineering activities during the entire project cycle such as design, construction, quality management, and commissioning before mapping out the basic plans for LRT project. In view of the current domestic conditions, the first time within the country, Seoulmetro is training professional as trust education of specialist training about LRT system, SE and PM education. This study leads to participating in PM/SE business by human power who finished from education of domestic specialist for LRT introduction corporation and businesses, it is published for introduction of specialist education and business revitalization.

  • PDF