• Title/Summary/Keyword: Railway Route

Search Result 230, Processing Time 0.026 seconds

The Verification of Breakage Possibility and Vibration Properties of Glass Insulators by the High-speed Railway Service (KTX 운행에 따른 가선설비 유리애자의 진동특성과 파손 가능성 검증)

  • Kim, Young-Seok;Shong, Kil-Mok;Jung, Jin-Su;Jeon, Yong-Joo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.3
    • /
    • pp.566-572
    • /
    • 2009
  • This paper has studied breakage possibility of glass insulators by resonance and accelerated deterioration through the comparison of the natural vibration and on site vibration. The natural frequencies of the strut tube glass insulator was measured within a range of less than 1kHz. In the on site vibration, the largest frequency that was imposed on strut tube glass insulators was 80Hz with 1.13g of vertical vibration in the viaduct section, the largest vertical vibration (0.38g) was detected at 103Hz in the open route section. When site vibration and natural vibration of strut tube glass insulators were compared in terms of characteristics, the resonance frequency was not the same. In both the viaduct and open route sections, it seems that the impact by vertical vibration in strut tube glass insulators is large. It's very unlikely that glass insulators were damaged by fatigue accumulation of vibration since the possibility of damage by resonance was very low in consideration of the characteristics of natural vibration and site vibration of glass insulators. In addition, no damage was detected in the accelerated deterioration test.

A Study on Field Vibration for Fault Cause Analysis of Glass Insulator on High-speed Railway (고속철도 유리애자 파손원인을 위한 현장 진동 연구)

  • Kim, Young-Seok;Shong, Kil-Mok;Bang, Sun-Bae;Kim, Sun-Gu;Ryu, Young-Tae
    • Proceedings of the KIEE Conference
    • /
    • 2008.05a
    • /
    • pp.189-190
    • /
    • 2008
  • This study was investigated a possibility of fault of glass insulator due to vibration on high-speed railway. The proper vibration of 1-glass insulator have many frequency band and high amplitude showed in high frequency than low frequency. The proper vibration of strut tube insulator was lowest 170Hz, highest 1.5kHz. The field signal amplitude of viaduct and open route were biggest moment pantograph of high-speed rail. The surface vibration(V3) amplitude of strut tube insulator was biggest. From the FFT analysis of viaduct and open route, the strut tube insulator effect by vertical vibration was big, the frequency was 82.5Hz and 105Hz, respectively. However, in comparison with the proper vibration of strut tube insulator, the resonance was not observed. Although the amplitude of insulator is high, the possibility of fault is low because the glass insulator deterioration by the accumulation of vibration do not happen.

  • PDF

Train Operation Display and Control Techniques for Communication Based Train Control System (무선통신 기반 열차제어시스템에서의 열차운행 표시 및 제어기법)

  • 최규형
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.53 no.9
    • /
    • pp.545-551
    • /
    • 2004
  • CBTC(Communication Based Train Control) System can improve train operation efficiency by realizing moving block system which makes a continuous train interval control in accordance with the position and speed of train. Adopting radio transmission to make a continuous detection of train position and transmit the control data from the ground to a train, CBTC needs dedicated train operation and control algorithm which should be quite different from the conventional track-circuit-based train control system. This paper provides a train operation display and control algorithm for CBTC system in making train interval control, train route control and train supervision. Signalling pattern diagram is devised to analyze the train interval control mechanism of moving block system, and interlocking logic is devised to represent the train route control mechanism of moving block system. For train supervision, train occupation status on railway are displayed by using the segment which virtually divide the whole railway. The proposed method has been successfully applied to the development of CBTC system for the standardized AGT(automatic guided transit) which is under construction now in Korea, and also can be applied to any other CBTC system.

Evaluating New Track Construction Costs of Two Different Options: Conventional Trains vs. Tilting Trains

  • Rho, Hag Lae;Han, Seong Ho;Kim, Gang Seog
    • International Journal of Railway
    • /
    • v.5 no.3
    • /
    • pp.103-113
    • /
    • 2012
  • Infrastructure costs could be greatly reduced if the need for bridges and tunnels was reduced, or if the line could be shortened. Tilting trains might be a less costly alternative to building new tracks with large curve radii, because tilting trains can negotiate tighter curves without having to decrease their speeds. Tracks built for tilting trains would be cheaper, as they require fewer bridges and tunnels. This paper compares the construction costs of two different options for the new Dodam-Yeoncheong section on the Central line, which includes 148.65 km of new electrified double-track with a design speed of 250 km/h. The first option is to straighten the high-speed line. The second option is to build a line with small radii curves and run tilting trains on the line. In the first option, tunnels would account for about 51% of the new section. In comparison, the second option would have shorter curves and fewer tunnels and bridges which would reduce construction costs. Furthermore, alignment modifications could be made to several segments on the straight line, making the most of the existing roadbed. The analysis concluded that the line suited to tilting trains would be 95.7 million USD cheaper to build the straight route. That is a savings of 2.8% of the total project cost. However, this option would increase the total travel time of the route by 1.2 minutes, which means it is not necessarily the best choice.

Determination of Route alignment improvement parameter for Speed up in Railway curve sections (철도곡선부 속도향상을 위한 선형개량요소 결정)

  • 조규전;이남수;정의환
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.13 no.2
    • /
    • pp.209-218
    • /
    • 1995
  • It is important role that railway speed up plays in realizing an affluent society in future. Curved lines zone have crucial effects on the speed of train travel, at the curved lines zone, it requires to set cant and slack for safety running of train and comfortable ride of passengers, a compromise is therefore to accept a certain degree of cantdeflciencyforthevarioustrain. In this study, it was presented that effective maintenance method according to the investigation of cant value in radius of curvature and analysis safety running of train, calculation of lateral acceleration as cant deficiency, and we obtain the effect of speed up appling route alignment improvement parameter in curved lines zone.

  • PDF

A study on railway logistic transportation efficiency through constructing roundabout route of the Kyung-Bu railroad (경부선 우회선로 구축을 통한 철도화물운송 효율화 방안 연구)

  • Kim, Jong-Tae;Choo, Jun-Sup;Moon, Dae-Seop;Yoo, Jae- Kyun;Lee, Jun;Oh, Seok-Moon
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.657-665
    • /
    • 2008
  • The main transportation mode of long distance inter-city passenger trips is high-speed rail and the modal share of transportation has been changed profoundly since the KTX service has been started in the Kyung-Bu railroad transportation corridor in the day of 1 April, 2004. After an opening of KTX service in the second stage Kyung-Bu and Ho-Nam railroad transportation corridors, a capacity of incumbent railroads will be increased and operational environments of freight train will be improved. The purpose of this paper is to examine the impact of KTX service operation on the national logistics thoroughly. This paper establishes a deceptive scheme in the national railroad logistic transportation and a route operational strategy between the main origins and destinations efficiently considering the changes of the current freight transportation system in the future. We expect to achieve efficiency of logistic transportation in this paper through alternative routes for example Ho-Nam, Chang-Hang, Seo-Hae line.

  • PDF

A Study on Utilization Plans of Regional trunk rail route -Focused on the Daegu.janghang Line- (지방간선노선의 철도이용과 활성화 방안 -대구.장항선을 중심으로-)

  • Yang, Jun-Gyu
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.496-504
    • /
    • 2011
  • The region trunk line railroad route undergoes an influence on a large scale in train operation systematic reorganization. This keynote of the train operation not being to the consumer and not to be is because being to the supplier. The trunk line route user of region supply change of the supplier sensitively, accepts but, the demand unit will be able to change the supply massive demanders does not become and like that to accept this back is not the railroad the mean of transportation which grudge is different a mean of transportation mainly makes use. This hits to neither the gist of GLORY promotions of the railroad public corporation which pursues the railroad use which is ordinary even in the basis of governmental policy of stock of coal small green growth and not to be is arranged. For the railroad use activation of the region trunk line route consequently and to excavate the demand hindrance element and a demand lure element the inside and the outside defines and to observe the fluctuation of use importing in existing train operation systematic fluctuation, with the user tries analyzes the instance of the overseas railroad enterprise about the process which reflects the opinion of the area and improvement under preparing boil.

  • PDF

The Study for Selection of the Optimum Route by Economic Analyses (설계의 경제성 분석을 통한 최적노선 선정방안 연구 - OO경전철 민간투자사업 사례연구 -)

  • Kwon, Suk-Hyun;Seo, Sung-Han;Lee, Dong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.128-138
    • /
    • 2008
  • VE of the scripture season enterprises and it respected LCC analyzes from the research which it sees and to use AHP techniques and definite LCC techniques and probabilistic LCC techniques selects the optimum route the case study which it executed. It presented the quality rating model in about the resultant most route lascivious at the time of VE evaluation, in order to select the alternative of optimum AHP techniques which are one in decision-making technique and an evaluation item by weight and a grade it applied the mountaintop it did. Also the definite LCC analyzer law departments of existing together it applied the probabilistic LCC techniques which use Monte Carlo Simulation in about analytical prices and reliability height boil. The economical efficiency was excellent with VE/LCC analytical resultant route and facility size abridgment, the rivers most it will be able to minimize an environmental effect with short distance traverse, the selection this hit preparation LCC which separates from the land use side decreased, the value (V) above 22.0% with the fact that it improves. And, the reliability of the probabilistic LCC analytical resultant analytical results in compliance with Monte Carlo Simulation with 90.3% was very analyzed with the fact that it is a high level.

  • PDF

Restoration of The Transportation Network between North and South Korea for Mt. Geumgang Tourism (금강산(내금강) 관광을 위한 남북연결 교통망에 관한 연구)

  • HONG, Gil-Jong;BAE, Sun-Hak
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.22 no.3
    • /
    • pp.51-64
    • /
    • 2019
  • Mt. Geumgang has been a scenic spot representing the Korean peninsula since the Joseon Dynasty, and became a symbol of inter-Korean exchanges with the Gaesong Industrial Complex after the division of the South and North. Mt. Geumgang Tour Course is divided into the Inner-Geumgang (Naegeumgang) and the Outer-Geumgang (Oegeumgang). It was common for the Mt. Geumgang tour route during the Joseon Dynasty and the Japanese Imperialization period to enter the Inner-Geumgang, near Seoul, and come to the East Sea through the Outer-Geumgang. However, the tour route starting from Goseong was utilized for the Mt. Geumgang tour course operated by Hyundai. Because North Korea opened only the Outer-Geumgang area. North Korea has only opened some of its tour courses to Hyundai, but if Geumgang tourism is resumed in the future, there is a high possibility that it will be opened further, such as opening some sections of the Inner-Geumgang in 2007. In this case, it is necessary to connect additional transportation networks to access Inner-Geumgang from South Korea. The best alternative was the restoration of the Mt. Geumgang Railway. However, considering the fact that the reconstruction of the Mt. Geumgang Railway can not be completed due to the construction of the Imnam Dam, it is the most realistic alternative to restore Route 31 connecting Yanggu and Geumgang-eup. As a result of the analysis of road connecting Inner-Geumgang, three routes were confirmed. All of which were adjacent to the existing National Route 31. These routes passing through Dutayeon and Mundeung-ri and joining the Route 31 from Inje. Considering road length, topography characteristics, and military facility layout, it seems that the connection of 'Dutaeyun - Mundeung - Geumgang' is a realistic alternative connecting from South Korea to Inner-Geumgang.

A Study on Analytic Hierarchy Proces for Construction Planning -Research on Examples of Railway Route Selection- (건설계획 수립시 계층분석적 의사결정법 적용방안에 관한 연구 -철도노선 선정시 활용사례 연구-)

  • Sohn, Jin-Hyeon;Cha, Cheol
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.10 no.4
    • /
    • pp.249-254
    • /
    • 2007
  • Recently, the items of construction planning have magnified and specialized and the problems occurring at the first step of the construction planing process have complicated. In this research, AHP(Analytic Hierarchy Process) method which is simple to apply and clear to decide has been proposed when a people making a plan at the first step of the construction planing process. As an example, the best solution has been obtained in a railway construction line choice that consist of various items by applying for this method, which proves the possibility of application of this method to the complicated problems.

  • PDF