Kim, Young-Seok;Shong, Kil-Mok;Jung, Jin-Su;Jeon, Yong-Joo
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.3
/
pp.566-572
/
2009
This paper has studied breakage possibility of glass insulators by resonance and accelerated deterioration through the comparison of the natural vibration and on site vibration. The natural frequencies of the strut tube glass insulator was measured within a range of less than 1kHz. In the on site vibration, the largest frequency that was imposed on strut tube glass insulators was 80Hz with 1.13g of vertical vibration in the viaduct section, the largest vertical vibration (0.38g) was detected at 103Hz in the open route section. When site vibration and natural vibration of strut tube glass insulators were compared in terms of characteristics, the resonance frequency was not the same. In both the viaduct and open route sections, it seems that the impact by vertical vibration in strut tube glass insulators is large. It's very unlikely that glass insulators were damaged by fatigue accumulation of vibration since the possibility of damage by resonance was very low in consideration of the characteristics of natural vibration and site vibration of glass insulators. In addition, no damage was detected in the accelerated deterioration test.
Kim, Young-Seok;Shong, Kil-Mok;Bang, Sun-Bae;Kim, Sun-Gu;Ryu, Young-Tae
Proceedings of the KIEE Conference
/
2008.05a
/
pp.189-190
/
2008
This study was investigated a possibility of fault of glass insulator due to vibration on high-speed railway. The proper vibration of 1-glass insulator have many frequency band and high amplitude showed in high frequency than low frequency. The proper vibration of strut tube insulator was lowest 170Hz, highest 1.5kHz. The field signal amplitude of viaduct and open route were biggest moment pantograph of high-speed rail. The surface vibration(V3) amplitude of strut tube insulator was biggest. From the FFT analysis of viaduct and open route, the strut tube insulator effect by vertical vibration was big, the frequency was 82.5Hz and 105Hz, respectively. However, in comparison with the proper vibration of strut tube insulator, the resonance was not observed. Although the amplitude of insulator is high, the possibility of fault is low because the glass insulator deterioration by the accumulation of vibration do not happen.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.53
no.9
/
pp.545-551
/
2004
CBTC(Communication Based Train Control) System can improve train operation efficiency by realizing moving block system which makes a continuous train interval control in accordance with the position and speed of train. Adopting radio transmission to make a continuous detection of train position and transmit the control data from the ground to a train, CBTC needs dedicated train operation and control algorithm which should be quite different from the conventional track-circuit-based train control system. This paper provides a train operation display and control algorithm for CBTC system in making train interval control, train route control and train supervision. Signalling pattern diagram is devised to analyze the train interval control mechanism of moving block system, and interlocking logic is devised to represent the train route control mechanism of moving block system. For train supervision, train occupation status on railway are displayed by using the segment which virtually divide the whole railway. The proposed method has been successfully applied to the development of CBTC system for the standardized AGT(automatic guided transit) which is under construction now in Korea, and also can be applied to any other CBTC system.
Infrastructure costs could be greatly reduced if the need for bridges and tunnels was reduced, or if the line could be shortened. Tilting trains might be a less costly alternative to building new tracks with large curve radii, because tilting trains can negotiate tighter curves without having to decrease their speeds. Tracks built for tilting trains would be cheaper, as they require fewer bridges and tunnels. This paper compares the construction costs of two different options for the new Dodam-Yeoncheong section on the Central line, which includes 148.65 km of new electrified double-track with a design speed of 250 km/h. The first option is to straighten the high-speed line. The second option is to build a line with small radii curves and run tilting trains on the line. In the first option, tunnels would account for about 51% of the new section. In comparison, the second option would have shorter curves and fewer tunnels and bridges which would reduce construction costs. Furthermore, alignment modifications could be made to several segments on the straight line, making the most of the existing roadbed. The analysis concluded that the line suited to tilting trains would be 95.7 million USD cheaper to build the straight route. That is a savings of 2.8% of the total project cost. However, this option would increase the total travel time of the route by 1.2 minutes, which means it is not necessarily the best choice.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.13
no.2
/
pp.209-218
/
1995
It is important role that railway speed up plays in realizing an affluent society in future. Curved lines zone have crucial effects on the speed of train travel, at the curved lines zone, it requires to set cant and slack for safety running of train and comfortable ride of passengers, a compromise is therefore to accept a certain degree of cantdeflciencyforthevarioustrain. In this study, it was presented that effective maintenance method according to the investigation of cant value in radius of curvature and analysis safety running of train, calculation of lateral acceleration as cant deficiency, and we obtain the effect of speed up appling route alignment improvement parameter in curved lines zone.
Kim, Jong-Tae;Choo, Jun-Sup;Moon, Dae-Seop;Yoo, Jae- Kyun;Lee, Jun;Oh, Seok-Moon
Proceedings of the KSR Conference
/
2008.11b
/
pp.657-665
/
2008
The main transportation mode of long distance inter-city passenger trips is high-speed rail and the modal share of transportation has been changed profoundly since the KTX service has been started in the Kyung-Bu railroad transportation corridor in the day of 1 April, 2004. After an opening of KTX service in the second stage Kyung-Bu and Ho-Nam railroad transportation corridors, a capacity of incumbent railroads will be increased and operational environments of freight train will be improved. The purpose of this paper is to examine the impact of KTX service operation on the national logistics thoroughly. This paper establishes a deceptive scheme in the national railroad logistic transportation and a route operational strategy between the main origins and destinations efficiently considering the changes of the current freight transportation system in the future. We expect to achieve efficiency of logistic transportation in this paper through alternative routes for example Ho-Nam, Chang-Hang, Seo-Hae line.
The region trunk line railroad route undergoes an influence on a large scale in train operation systematic reorganization. This keynote of the train operation not being to the consumer and not to be is because being to the supplier. The trunk line route user of region supply change of the supplier sensitively, accepts but, the demand unit will be able to change the supply massive demanders does not become and like that to accept this back is not the railroad the mean of transportation which grudge is different a mean of transportation mainly makes use. This hits to neither the gist of GLORY promotions of the railroad public corporation which pursues the railroad use which is ordinary even in the basis of governmental policy of stock of coal small green growth and not to be is arranged. For the railroad use activation of the region trunk line route consequently and to excavate the demand hindrance element and a demand lure element the inside and the outside defines and to observe the fluctuation of use importing in existing train operation systematic fluctuation, with the user tries analyzes the instance of the overseas railroad enterprise about the process which reflects the opinion of the area and improvement under preparing boil.
VE of the scripture season enterprises and it respected LCC analyzes from the research which it sees and to use AHP techniques and definite LCC techniques and probabilistic LCC techniques selects the optimum route the case study which it executed. It presented the quality rating model in about the resultant most route lascivious at the time of VE evaluation, in order to select the alternative of optimum AHP techniques which are one in decision-making technique and an evaluation item by weight and a grade it applied the mountaintop it did. Also the definite LCC analyzer law departments of existing together it applied the probabilistic LCC techniques which use Monte Carlo Simulation in about analytical prices and reliability height boil. The economical efficiency was excellent with VE/LCC analytical resultant route and facility size abridgment, the rivers most it will be able to minimize an environmental effect with short distance traverse, the selection this hit preparation LCC which separates from the land use side decreased, the value (V) above 22.0% with the fact that it improves. And, the reliability of the probabilistic LCC analytical resultant analytical results in compliance with Monte Carlo Simulation with 90.3% was very analyzed with the fact that it is a high level.
Journal of the Korean Association of Geographic Information Studies
/
v.22
no.3
/
pp.51-64
/
2019
Mt. Geumgang has been a scenic spot representing the Korean peninsula since the Joseon Dynasty, and became a symbol of inter-Korean exchanges with the Gaesong Industrial Complex after the division of the South and North. Mt. Geumgang Tour Course is divided into the Inner-Geumgang (Naegeumgang) and the Outer-Geumgang (Oegeumgang). It was common for the Mt. Geumgang tour route during the Joseon Dynasty and the Japanese Imperialization period to enter the Inner-Geumgang, near Seoul, and come to the East Sea through the Outer-Geumgang. However, the tour route starting from Goseong was utilized for the Mt. Geumgang tour course operated by Hyundai. Because North Korea opened only the Outer-Geumgang area. North Korea has only opened some of its tour courses to Hyundai, but if Geumgang tourism is resumed in the future, there is a high possibility that it will be opened further, such as opening some sections of the Inner-Geumgang in 2007. In this case, it is necessary to connect additional transportation networks to access Inner-Geumgang from South Korea. The best alternative was the restoration of the Mt. Geumgang Railway. However, considering the fact that the reconstruction of the Mt. Geumgang Railway can not be completed due to the construction of the Imnam Dam, it is the most realistic alternative to restore Route 31 connecting Yanggu and Geumgang-eup. As a result of the analysis of road connecting Inner-Geumgang, three routes were confirmed. All of which were adjacent to the existing National Route 31. These routes passing through Dutayeon and Mundeung-ri and joining the Route 31 from Inje. Considering road length, topography characteristics, and military facility layout, it seems that the connection of 'Dutaeyun - Mundeung - Geumgang' is a realistic alternative connecting from South Korea to Inner-Geumgang.
Journal of the Korean Society of Industry Convergence
/
v.10
no.4
/
pp.249-254
/
2007
Recently, the items of construction planning have magnified and specialized and the problems occurring at the first step of the construction planing process have complicated. In this research, AHP(Analytic Hierarchy Process) method which is simple to apply and clear to decide has been proposed when a people making a plan at the first step of the construction planing process. As an example, the best solution has been obtained in a railway construction line choice that consist of various items by applying for this method, which proves the possibility of application of this method to the complicated problems.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.