• 제목/요약/키워드: Railway Construction

검색결과 1,416건 처리시간 0.028초

철도 인프라 BIM 협업 전략에 관한 연구 - 싱가포르 사례 및 국내 전문가 설문조사를 기반으로 - (A Study on the Building Information Modeling Collaboration Strategy for Railway Infrastructure - Case Study and Survey -)

  • 김성아;김진만;신민호
    • 한국BIM학회 논문집
    • /
    • 제12권4호
    • /
    • pp.116-127
    • /
    • 2022
  • Building Information Modeling, which was applied mainly in the construction sector, is expanding to the road sector, and the government recently recommends preparing individual application guidelines considering the characteristics of detailed fields such as railways, ports, and complexes through BIM implementation guidelines. Compared to general construction projects, a lot of the works such as signals, electricity, and power, and the railway BIM 2030 roadmap has been presented to apply BIM to railway construction projects that require business consultation and work environment review with various local governments, and pilot projects are in operation. Unlike a general building, in which the construction begins after the detailed design is completed, in the railway project, the detailed design of other works proceeds along with the roadbed construction. Because construction and design work together, railways need to coordinate detailed engineering interfaces such as trajectories, signals, and power, and the application of BIM in design interface coordination has the advantage of maximizing the effectiveness of pre-review. Overseas railway construction projects actively used BIM to adjust design interfaces and had a collaboration process to modify BIM models and create construction details from the revised models through regular meetings with suppliers. Therefore, this study aims to derive the factors necessary for establishing a BIM collaboration environment based on a survey of practitioners as a preliminary step for establishing the BIM collaboration process of the railway construction project.

독일의 경제적인 철도망구축 방안 (An economical Method for the Construction of German Railway Network)

  • 이남수;심재범;정경희
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1998년도 추계학술대회 논문집
    • /
    • pp.152-160
    • /
    • 1998
  • Korea Railway aims to be the most important public transportation for nationwide basic industries in 21st century. It is urgently necessary for us to construct economical railway network and to strengthen(strengthen) its competitive power in advance. In this paper the economical construction of railway network in Germany will be introduced. They lay emphasis on train speed and higher efficiency of railroad track.

  • PDF

철도인프라 BIM 적용에 따른 비용편익 효과 분석 - 오송 철도종합시험선로 사례를 중심으로 - (Benefit-Cost Analysis of BIM Application - Case Study on Osong Test Line Railway -)

  • 김환용;신민호;한상천;최영우;김창호
    • 한국BIM학회 논문집
    • /
    • 제8권4호
    • /
    • pp.41-48
    • /
    • 2018
  • Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction.

철도사업의 민간투자에 관한 연구 (Study on the Execution of Railway Project by Private Sector)

  • 박홍기;박용걸;염동신;이익수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.965-970
    • /
    • 2004
  • The private investment on the SOC facilities is a worldwide tendency since it can supplement the insufficient investment of public finance in the construction of infrastructures. Alter the formulation of private investment law, private sector's investment on roads, harbors and environmental facilities are being progressed considerably. However, railway construction by private sector is not active comparing to the former areas because of huge investment for construction but relatively low and unpredictable benefit in operation. This paper reviews the financial, social and institutional aspects on the private investment for SOC projects, especially railway projects. Also, this paper tries to find the desirable way to expedite the private investment on railway project,. Conclusively, the paper propose that the private sector in railway projects is better constituted with financial investor and the private financing could be. activated and settled if a stable minimum benefit on their investment being ensured institutionally, for example, by BTL.

  • PDF

가상건설기법을 활용한 철도시설물의 시공시뮬레이션 기능 개발 (Development of Construction Simulation Function for Railway Project by Virtual Construction Technology)

  • 강인석;문진석;김슬기;권중희;지상복
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.10-13
    • /
    • 2008
  • This study suggests a virtual construction technology for railway project using virtual reality and attempts to develop a virtual construction system. For the study, the final system include the layout review function that can rearrange designed element for optimal placement and the earthwork simulation function that can visualize filling and cutting work using central line of earthwork section. Those functions can improve applicability of 3D and 4D object in the design and construction phases of railway project.

  • PDF

4D CAD와 IETM 연계를 통한 철도시설의 효율적인 공사정보관리 방안 (Methodologies for Effective Construction Information Management of Railway Facilities through Linking 4D CAD to IETM)

  • 강인석;문현석;박서영;김현수;안재규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.139-142
    • /
    • 2008
  • Construction Management by using 4D CAD system analyzes operations information based on 3D and 4D objects. But it is difficult to provide a variety of documents linked by 4D objects in a lump from 4D CAD system based on visual object, and to get an optimal decision-making information to conduct business. Therefore, it is necessary to construct effective construction information management systems and to organize integrated information through linking non-objects to objects. This study suggests methodologies of effective construction management for railway facilities through building of framework for practical application and methodologies to link 4D objects to IETM documents. Accordingly, it is possible to establish a systematic decision-making for an effective construction management of railway facilities, and this provide integrated methodology for linking non-objects to objects.

  • PDF

기술이전을 연계한 한국형 차세대 고속전철의 중국진출 방안 연구 (A Strategy on Penetration of the Korean High-Speed Train into Chinese Market in Trade off the Technology Transfer)

  • 송달호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.907-914
    • /
    • 2005
  • Studied was a strategic plan for the Korean High-Speed Train system to penetrate the Chinese railway market in exchange of the technology of KHST. Firstly, taken was a glance at Chinese Government plans to extend total length of his railway lines and to construct the $Beijing\~Shanghai$ high-speed railway line. Then, disparity of railway technology in Korea and China was reviewed. From the review, SWOT Analysis were carried out to penetrate the foreign markets. Countermeasures to cope with SWOT were also considered. Strategical governmental supports and the establishment of the special organization to be charge of penetration of KHST into foreign markets were proposed. Finally, also proposed was the transfer of KHST technology to Chinese counterparts in exchange of tangible benefits for Korean side, The benefits may include (1) adoption of KHST as the type of rolling stock for the $Beijing\~Shanghai$ line, (2) guarantee of participation in the project and royalty for the KHST technology used for the future high-speed railway line construction. (3) prior written approval and partnership when making its way to third country, and (4) participation of Korean construction companies in Chinese railway construction project. etc. Adoption of KHST in China indeed gives chance to integrate the high-speed railway network after reunification of Korean peninsular, and enhance the economic ties between two countries.

  • PDF

철도지하횡단공사시 현장계측을 통한 지반거동 분석 (The Analysis of Ground Behavior on the Crossing Construction Under Railroad Using Field Measurement)

  • 엄기영;신민호;김지훈
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 추계학술대회 논문집
    • /
    • pp.546-551
    • /
    • 2001
  • We analysed the affection to subgrade that railway underground crossing construction make with studying displacement of subgrade of each construction methods and processing of Front jacking method and Pipe roof method with already-measured data(during the construction) and additionally-measured field test data in railway underground crossing construction. We measured vertical and horizontal displacement at two construction places of front jacking method and pipe roof method each, and we analysed the results of the measurement at each stage of construction to applied to the excution of construction.

  • PDF

철도망 구축을 고려한 철도시스템의 기술개발전략 (A Strategy of Technology Development for the Railway System based on Railway Network)

  • 이희성
    • 한국철도학회논문집
    • /
    • 제9권3호
    • /
    • pp.319-324
    • /
    • 2006
  • Studied was a strategy of technology development for railway system in terms of railway network. First, The successful launch of the Korean HST system has not only decreased logistics burden but also significantly transformed the Korean trunk-line railway network, revolutionizing the logistics and technology sectors and reinvigorating the Korean railway industry in one century. Korean railway industry sector is now investing to develop many different types of railway system(G7, Post G7, tilting train...) so that these kinds of various railway system development should be integrated with the National Inter-modal Transportation Network Plan. To secure sufficient capacity that is required by the National Railroad Plan, the railway industry needs to establish mid- and long-term train purchase and operation strategies in compliance with railway construction and operation policies. During a railway construction planning, train operators, based on their train operation strategies, should come up with measures to closely cooperate with project operators from the planning stage through to the opening of a railway system. To be more precise, train operators should establish long-term train procurement plans reflecting both long-term national railroad network plans and plans for each railway line in order to suggest appropriate roles and schedules for each line. Also, based on the long-term railway plan, directions should be decided concerning the research and development of trains in advance.

LCA를 이용한 고속철도 건설단계에서의 환경부하 특성에 관한 연구 (A Study on the Characteristics of Environmental Impact in Construction Sector of High-Speed Railway using LCA)

  • 이철;이재영;정우성;황용우
    • 한국철도학회논문집
    • /
    • 제17권3호
    • /
    • pp.178-185
    • /
    • 2014
  • 본 연구에서는 국내 고속철도노선 전과정 중 건설단계에 대하여 각 분야별(토목, 궤도, 건축 및 전철전력/신호통신분야) 주요 건설자재 및 중장비 에너지 사용량을 토대로 전과정평가(Life Cycle Assessment, LCA) 방법론을 적용하여 주요 환경부하 특성을 분석하였다. 그 결과, 분야별 환경영향 기여도는 토목분야가 약 89%로 가장 높게 나타났으며, 궤도 7%, 건축 2%, 전철전력분야 2% 순으로 나타났다. 가장 기여도가 높은 토목분야의 경우, 주요 영향평가 범주는 지구온난화, 자원고갈, 광화학산화물생성으로 각각 54%, 25%, 8%로 나타났으며, 주요 영향인자는 레미콘과 시멘트인 것으로 분석되었다. 향후 철도 건설단계에서의 전과정평가 적용은 정량적인 환경부하 산정을 통해 효율적인 저감방법을 도입할 수 있다.