• Title/Summary/Keyword: Railway Construction

Search Result 1,406, Processing Time 0.029 seconds

Research on Transition of Road Bed of Wuhan-Guangzhou Passenger Line and Bridge

  • Kang, Bo-Soon;Jun, Yang
    • International Journal of Railway
    • /
    • v.2 no.4
    • /
    • pp.180-186
    • /
    • 2009
  • High speed railway challenge the design, construction and maintaining of traditional railway, many traditional design concepts have been changed. Transition of railway and bridge has two main problems. one is that different lines have different ability of resisting distortion in area of trial load, which was known that problem of smooth transition of stiffness, the other is that differential settlement between artificial structure and earth structure cause bending of railway. The two problems have effect on train moving. The principle of processing transition of railway and bridge is same in world, but it is difficult to find relationship between design standard of transition, vehicle performance, line standard, design speed and so on form documentation and data reports. Based on mechanics, the paper analyzed dynamic performance of transition of high speed railway, studied various rough elements which is effective to train moving, built mathematical model of interaction of train and transition of high speed railway and developed numerical simulation software. In various different work conditions, we did great quantity of numerical simulation, comprehensive analysis and performance analysis.

  • PDF

A Study on the Intelligent Railway Operation Information Architecture (지능형 철도운영 정보체계 구축 연구)

  • Kim, Young-Hoon;Hong, Soon-Heum
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1562-1566
    • /
    • 2006
  • The intelligent railway operation information architecture is to provide the railway passengers with the intermodal transportation information service. The purpose of the information architecture is to suggest the information service architecture of the intermodal transportation structurally. First, the architect procedure is to analysis the user requirements and according to these requirements, is to make the description of service requirements. Then secondly, it decides the service items and based of these items, it is to construction of service architecture. Finally, service package provide an accessible, deployment oriented perspective to intelligent railway operation information architecture

  • PDF

Environmental Impact Assessment and Environmental Management of Railways (I) (철도사업 환경영향평가와 환경관리(I))

  • Lee, Hyun-Woo;Lee, Young-Joon;Park, Young Min;Lee, Jeongho;Yoon, Mikyung
    • Journal of Environmental Impact Assessment
    • /
    • v.13 no.6
    • /
    • pp.295-305
    • /
    • 2004
  • After the Rio declaration on environment and development in 1992, developed countries are undertaking "environmentally sustainable transportation (EST)" projects. To meet the needs for EST, current transportation policies in Korea are rapidly reforming and one of its concerns is modernizing and upgrading railway freight system. Planning new railroad construction projects is increasing and subsequent environmental impact assessment (EIA) demands improvements, especially in both the EIA and decision making systems. In this paper, we discuss the present status of EIA for railroad construction projects, especially, by analyzing the EIA documents for the last six years. The EIA for railroad construction projects accounts for only 4.9% of total 918 project EIAs during 1998-2003, and the portion is gradually increasing. Major environmental concerns for EIA in railroad construction projects were geomorphological and ecological changes, protection of rare organisms, air pollution, water pollution, waste management, and noise, etc. We compared characteristics of environmental impacts of railroad construction with those of vehicle road construction, based on environmental and construction-planning indicators appeared in Environmental Impact Statements. Railroad construction usually requires longer tunnels and bridges for a given length than those for vehicle road construction. In addition, the amounts of geomorphological and ecological changes (road-cutting, embankment, devegetation, etc.) in railroad construction were generally less than 50% of those in vehicle road construction. To develop environmentally friendly railway systems, monitoring studies for environmental impacts of railroads such as habitat fragmentation and road kills, dispersal of alien plants, tunnelling effects on groundwater and vegetation, and noise impacts are highly recommended.

A Correlation Analysis on Earth Pressure and Subgrade Stiffness in Bridge Abutment Transition Zone (철도 교량접속부의 토압과 노반강도와의 상관관계)

  • Kim, Jin-Hwan;Cho, Kook-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.5
    • /
    • pp.647-655
    • /
    • 2016
  • The construction of high speed railways and improvement projects of for conventional railways require straight railway lines of railway, which leads to an increase of bridge and tunnel construction. Transition zones in railways means that the track support stiffness is variedvaries in over short ranges. Sspecial attention is required in theose transition zones since because instability of train running in train and irregularities of track irregularities are can frequently occurred. Typical transition zones are between bridges and earthworks and between tunnels and earthworks. On In a transition zone, a bridge abutment transition zone has many problems in with various causes. In this paper, fundamental problems of bridge abutment transition zones is are analyzed to enhance the understanding about of bridge abutment transition zones. Suggestions for improving problems in the transition zones are proposed.

Formulation and Evaluation of Railway Optimal Alignment Design Model (철도 최적 노선설계 모형의 해석과 적용)

  • Kim, Jeong Hyun;Shin, Youngho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1845-1850
    • /
    • 2014
  • Railway operators have given a lot of efforts to determine the railway route of the minimum cost. In order to determine the optimal alignment, the alignment should be allocated satisfying the design criteria on various geographical condition with the minimum earth works. The determination of the optimal railway alignment is a kind of combination optimization because that must consider various design elements. This study developed a numerical model to determine the optimal railway alignment with the minimum construction cost. The problem was analyzed by the genetic algorithm, and the concept of the optimal alignment was established with the results from the analyses. The methodology was applied to a fictitious rail construction section and the result was evaluated. This methodology is meaningful considering the fact that the cost for energy is greater than that of the construction.

A Study on Configuration of Electrical Power Distribution System for Railway (철도 배전 계통의 최적 구성 방안에 대한 연구)

  • Lee, Gyu-Dae;Kim, Kwang-Ho
    • Journal of Industrial Technology
    • /
    • v.31 no.B
    • /
    • pp.17-21
    • /
    • 2011
  • Since the railway passenger services have been recognized as important factor for success in railway, electrical energy consumption in railway station for high quality service has greatly increased. Furthermore, the number of the private railway station has gradually increased. Therefore, the operation conditions for railway power distribution system is dramatically changed in comparison with the past. So, this paper proposes the optimal construction method for railway power distribution system considering economical efficiency and the reliability of power supply to establish the railway power distribution system standard for the future railway industry.

  • PDF

Analytical Evaluation of Airborne Noise for the Building Structure' on Railway Transportation Systems (철도부지 상부 입체 건축물의 공기전달음 소음 예측)

  • Yeon, Jun-Oh;Kim, Kyoung-Woo
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.12
    • /
    • pp.1096-1102
    • /
    • 2013
  • The useful practical land shall be reserved when an artificial land covers the railway and road. However, the problem is that since the artificial land places directly on the top of noise sources likely on the railway and road there will arise the weak points, noise and vibration. On this study based on creating the artificial land on the top of a railway vehicle base and placing a tenement on that land, it was comprehended the noise influence from the railway car through the simulation. In order to secure the input value for the simulation, at first measured the noise condition of the railway station building and the railway vehicle base. The output value for the railway station building (place A) was around (53.6~57.6) dB(A), the equivalent continuous sound level for an hour, and for the railway station building (place B) it was around (63.7~68.9) dB. The maximum outdoor noise of the tenement on the artificial land was measured as 64.1 dB(A) under the fixed condition on the simulation modeling. The built purpose of placing the artificial land to prevent the noise influence from the railway met the expectation to be less influenced on the tenement. Rather, because of placing the artificial land the noise level on the lower space could be increased so there requires having a noise control.

Rational high-speed railway plan for passing through metropolis (고속철도의 합리적인 광역도시 통과방안)

  • Ahn Yong-Mo;Kim Hong-Yeoun
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.144-150
    • /
    • 2005
  • After the historic opening of the first section of KTX(Korea Train eXpress), it has been made changes three times in a plan to pass through cities of Daejeon, Daegu in the construction of the high speed train's second section(underground${\to}$ on ground${\to}$ under ground${\to}$ on ground). Thereafter, it has been repeatedly argued that the plan to pass through underground caused many problems such as prevention of an accident in tunnel, the difficulty of maintainence, the disadvantage of passengers' moving line. Thus construction on ground plan is coming up again with relation to the interest among local people. There have been lots of national budget loss, construction period delay in this project and people hardly trust policies about national project and nor do engineers. It will be presented that the railway line which is accorded with the characteristics of region, an agreement with local communities about national project, the reasonable procedure to determine how to pass through cities, resolve the conflict among neighborhood, and the role of engineers.

  • PDF

An Application study for corrugated structural plate under the railway (철도하부 통과 구간의 파형강판의 적용성 검토 연구)

  • Roh, Byoung-Kuk;Kim, Hung-Do;Oh, Kyung-Jun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1424-1430
    • /
    • 2007
  • Corrugated structural plate is ductile structural member which has high sectional properties compared with same thickness of plate. Corrugated plate resists the external forces by the combined action of retained soils and structures. Since it is easy to transport and assemblage of in-situ, the duration and cost of construction can be reduced. Corrugated plate structures, therefore, are widely used in culverts, hydro passages and simple bridges. RC culvert with supported by unstable soil layersin railway construction project of pohang${\sim}$samchuk has been replaced by corrugated plate culvert due to the reduction of construction duration and cost, especially the performance of behavior of settlement of ground. The structural analysis, design processes, and the economic advantages of the corrugated plate culvert are studied in this paper.

  • PDF

A Study on the Optimum Selection of Railload Line using VE-LCC Analysis - Based on the Optimum Selection of Railway Bridge - (VE-LCC 분석을 통한 철도 노선의 최적안 선정방안 연구 - 교량 선정방안을 중심으로 -)

  • Shin Tae-Kyun;Lee Seung-Hoon;Kwon Jae-Seong;Koo Jeong-San;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.488-493
    • /
    • 2005
  • Railload line design of the railroad construction project should be planed considering the variety of quantitative and qualitative factors, and needs to be selected the optimum altinative weighing from VE/LCC analysis of the planned design. The purpose of this research is for showing selecting plan of the optimum railload line and railway bridge applying VE/LCC analysis in selecting the optimum altinative of railroad construction based on quantitative and qualitative factors, such as initial construction cost, maintenance cost, owner and user's requirements. In this research showed the application plan by each stage using data analysis, function analysis, and alternative evaluation of VE/LCC analysis with AHP and LCC analysis program for the selection. This research is proved the rationality and application of the course of selecting the optimum alternative through case application

  • PDF