• Title/Summary/Keyword: Railroad Tracks.

Search Result 109, Processing Time 0.03 seconds

A Study on the D-InSAR Method for Micro-deformation Monitoring in Railway Facilities (철도시설물 미소변형 모니터링을 위한 D-InSAR 기법 연구)

  • Kim, Byung-Kyu;Lee, Changgil;Kim, Winter;Yoo, Mintaek;Lee, Ilhwa
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.11
    • /
    • pp.43-54
    • /
    • 2022
  • The settlement at the railroad foundation is often the leading cause of track irregularity and potential derailment. The control of such deformation is considered necessary in track maintenance practice. Nevertheless, the monitoring process performed by in situ surveying requires an excessive amount of manpower and cost. The InSAR, a remote sensing technique by RADAR satellite, is used to overcome such a burden. The PS-InSAR technique is preferred for a long-term precise monitoring method. However, this study aims to obtain relatively brief analysis results from only two satellite images using the D-InSAR technique, while a minimum of 25 images are required for PS-InSAR. This study verifies the precision of D-InSAR within a few millimeters by inspecting railroad facilities and land settlements in Korea Railroad Research Institute's test track with images from TerraSAR-X Satellite. Multiple corner reflectors were adopted and installed on an embankment and the building roof to raise the surface reflectivity. Those reflectors were slightly adjusted periodically to verify the detecting performance. The results revealed the optimum distance between corner reflectors. Further, the deformation of railway tracks, slopes, and concrete structures was analyzed successively. In conclusion, this study indicates that the D-InSAR technique effectively monitors the short-term deformation of a broad area such as railway structures.

Evaluation of Stiffness Structure and Grouting Efficiency beneath the Precast Slab Track by Elastic Wave Tests (탄성파시험에 의한 프리캐스트 슬래브궤도의 강성구조와 충전성능 평가)

  • Lee, Il-Wha;Joh, Sung-Ho;Jang, Seung-Yup;Kang, Youn-Suk;Han, Sung-Woo
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1303-1308
    • /
    • 2007
  • Recently, precast concrete tracks are replacing ballast track for efficient and economic maintenance of track. Precast concrete railroad tracks are manufactured in factory, and transported to railroad construction site for installation. Therefore, quality of precast concrete track itself should be sufficiently good. On the contrary to the convenient manufacturing of precast concrete track, the installation of a precast concrete track requires careful steps. Typically, a precast concrete track is placed on an approximately 15-cm thick lean concrete layer. A mortar is filled between lean concrete layer and precast concrete track to adjust the sloping angle of a precast concrete track for a safe train operation at a curvy section. Then, the use of filled mortarproduces a void underneath a precast concrete track, which is harmful to structural safety of a precast concrete track undercyclic loading. Therefore, it is essential to make sure that there is no void left beneath a precast concrete track after mortar filling. In the continuous resonance method, the amplitude of frequency response measured using an instrumented hammer and an accelerometer is plotted against a pseudo-depth, which is half of the wave velocity divided by frequency. The frequency response functions are measured at consecutive measurement locations, 6-cm interval between measurement points, and then combined together to generate a 2-D plot of frequency response. The sections with strong reflections or large amplitude of frequency response are suspicious areas with internal voids and unfilled areas. The 2-D frequency response plot was efficient in locating problematic sections just by examining the color shade of a visualized plot in 2-D format. Some of the problematic sections were drilled to make a visual inspection of mortar filling. The visual image of interface between mortar and precast concrete track was verified using the validity of the continuous resonance technique adopted in this research.

  • PDF

Performance of Railway Roadbed Reinforced by Acrylate in Laboratory Experiment (실내실험을 통한 아크릴레이트의 철도노반 보강 성능)

  • Yoon, Hwan-Hee;Son, Min;Kim, Jin-Hwan;Kim, Dong-Hyun;Kim, Byung-Hyun;Jung, Hyuk-Sang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.20 no.1
    • /
    • pp.9-19
    • /
    • 2021
  • This paper deals with the reinforcement performance of acrylate for reinforcing the settled railway roadbed. Concrete tracks have the advantage of reducing track maintenance costs and high resistance to track destruction. However, roadbed settlement is occurring in some construction sections, and the safety of railways is a serious concern because of difficulties in maintenance. Currently, maintenance through the track restoration method is being carried out in Korea as a way of roadbed settlement in concrete tracks, but continuous re-settlement can occur because the roadbed itself cannot be reinforced, and there are very few cases of reinforcement of railway roadbeds and field application. So the development of reinforcement materials and construction methods to reinforce railway roadbeds is required. Therefore, in this paper, acrylate was selected as reinforcement material for railway roadbed, and the reinforcement performance of acrylate was analyzed through experiment. As a result, it was analyzed that the acrylate can penetrate into a permeability coefficient of 1×10-4 cm/sec, and secure uniaxial compression strength of 0.5 MPa/30min or more and stiffness of 80 MPa or more.

A study on efficient operation of DC track circuit (DC 궤도회로의 효율적인 운용방법에 대한 연구)

  • Jang, Dongwan;Jeon, Taehyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.2
    • /
    • pp.70-75
    • /
    • 2014
  • A track circuit is a critical piece of equipment that allows the existence of the trains on the track to be detected. Train detection is very important for the signal safety equipment. It allows for the confirmation of a train's location, the locking of switch points, the coordination of safe distance between trains, and the advance notice of a train's arrival. Track circuits can be powered by AC or DC. The DC track circuits are usually used on non-electrified tracks. On these tracks, many signal errors can be caused by lightning or problems with the power source. These problems can also cause damages to the rectifiers which must be repaired or replaced, promptly. This issue is especially problematic in the summer because of the higher frequency of thunderstorms. Issues with track circuits also cause problems for other equipment, such as railroad crossings and switch points. This further disrupts the safe operation of trains. This study aims to enhance maintenance efficiency and improve safety by utilizing parallel operation and multiplexing of a DC track circuit as well as installing an external surge protector. The experimental results on the operation of the proposed method is also presented.

Characteristics of Vibration and Sound Radiated from Rails of Concrete Slab Tracks for Domestic High Speed Trains (국내 고속 철도 콘크리트 슬라브 궤도의 진동 및 방사 소음 해석)

  • Ryue, Jungsoo;Jang, Seungho
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.7
    • /
    • pp.605-616
    • /
    • 2013
  • An important source of noise from railways is rolling noise caused by wheel and rail vibrations induced by acoustic roughness at the wheel-rail contact. In the present paper, characteristics of rail vibration and radiated sound power from concrete slab tracks for domestic high speed train(KTX) is investigated by means of a numerical method. The waveguide finite element and boundary element are combined and applied for this analysis. The concrete slab track is modelled simply with a rail and rail pad regarding the concrete slab as a rigid ground. The wave types which contribute significantly to the rail vibration and radiated noise are identified in terms of the mobility and decay rates. In addition, the effect of the rail pad stiffness on the radiated power is examined for two different rail pad stiffnesses.

Prediction of Cumulative Plastic Displacement in the Concrete Track Roadbed Caused by Cyclic Loading (반복하중에 의한 콘크리트 궤도 노반의 누적 소성 변위 예측)

  • Won, Sang-Soo;Lee, Jin-Wook;Lee, Seong-Hyeok;Jung, Young-Hoon
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.1
    • /
    • pp.52-58
    • /
    • 2014
  • Plastic deformation of roadbed influences the stability and maintenance of concrete slab track. Long-term plastic deformation in a railway roadbed is generated primarily due to accumulated inelastic strains caused by repeated passing of trains. Prediction of cumulative plastic deformation is important in cost-effective maintenance of railway tracks as well as for the safe operation of trains. In this study, the vertical displacements in railway roadbeds with different thicknesses of reinforced roadbed were computed. Parameters of the power model for cumulative plastic strain were calibrated by using the data from triaxial tests and full-scale loading tests. Results of three-dimensional finite element analyses of standard roadbed sections provide us with design guidelines for the selection of the thickness of reinforced roadbed.

The Influence of Noise Environment upon Voice and Data Transmission in the RF-CBTC System

  • Kim, Min-Seok;Lee, Sang-Hyeok;Lee, Jong-Woo
    • International Journal of Railway
    • /
    • v.3 no.2
    • /
    • pp.39-45
    • /
    • 2010
  • The RF-CBTC (Radio Frequency-Communication Based Train Control) System is a communication system in railroad systems. The communication method of RF-CBTC system is the wireless between the wayside device and on-board device. The wayside device collects its location and speed from each train and transmits the distance from the forwarding train to the speed-limit position to it. The on-board device controlling device controls the speed optimum for the train. In the case of the RF-CBTC system used in Korea, transmission frequency is 2.4 [GHz]. It is the range of ISM(Industrial Scientific and Medical equipment) band and transmission of voice and data is performed by CDMA (Code Division Multiple Access) method. So noises are made in the AWGN (Additive White Gaussian Noise) and fading environment. Currently, the SNR (Signal to Noise Ratio) is about 20 [dB], so due to bit errors made by noises, transmission of reliable information to the train is not easy. Also, in the case that two tracks are put to a single direction, it is needed that two trains transmit reliable voice and data to a wayside device. But, by noises, it is not easy that just a train transmits reliable information. In this paper, we estimated the BER (Bit Error Rate) related to the SNR of voice and data transmission in the environment such as AWGN and fading from the RF-CBTC system using the CDMA method. Also, we supposed the SNR which is required to meet the BER standard for voice and data transmission. By increasing the processing gain that is a ratio of chip transmission to voice and data transmission, we made possible voice and data transmission from maximally two trains to a wayside device, and demonstrated it by using Matlab program.

  • PDF

Standard Work Process to Reduce a Risk of Track Exchange Work for Railroad (철도 운행선 변경작업의 리스크 저감을 위한 표준작업 프로세스 도출)

  • Yoon, Chang Geun;Park, Su Yeul;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.131-137
    • /
    • 2021
  • Since many resources are put into the work of changing the railway operation within limited time, it is important to have a specific work plan and safety management. For this reason, the work schedule is shared in advance, and parallel work is being carried out simultaneously by rail system, such as tracks, trolly wires, and signals. However, due to the nature of the transfer work, the work is carried out at night when the railway operation is finished, and many resources are put into the limited area of the operating line, so the risk of safety accidents and failure to change the operating line is recognized as high. Nevertheless, there is still not enough research done in korea regarding the operation line change construction. Therefore, this study is conducted a survey on the track exchange work of railroad for working people, and analyzed the results of the survey. Finally, a standard work process was suggested to reduce the risk of track exchange work.

Analysis of Acceleration and Deceleration on High Performance Train for A Metropolitan Rapid Transit System (대피선 최소화를 고려한 광역·도시철도 급행화를 위한 고성능 열차 가감속도 분석)

  • KO, Kyeong Jun;KIM, Jung Tai;KIM, Moo Sun;JANG, Dong Uk;HONG, Jae Sung;RYU, Sang Hwan;JUNG, Jong Deok
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.6
    • /
    • pp.564-574
    • /
    • 2015
  • As shown by the popularity of the rapid train in the Seoul Metro Line No. 9, the demand for the rapidization of the metro transit has been continuously increased. However, it needs tremendous cost to construct new additional infrastructures to the existing line for the rapidization. In order to overcome the problem, utilizing the existing infrastructures such as crossing tracks as railroad sidetracks can be considered to be a good method of reducing the cost. In this case, there is a way exploiting the existing train as an express train and the advanced train, which increases both acceleration and deceleration, as a local train, but achievable acceleration and deceleration have not been analyzed rigorously. In this paper, we analyze feasible ranges and optimal values of both acceleration and deceleration of the advanced train analytically when we consider the rapidization of the metro transit utilizing the existing infrastructures and verify the results in Seoul Metro Line No. 3. Simulation results show ranges and optimal values of achievable acceleration and deceleration exist when minimum gap between an express train and a local train is smaller than 40 seconds.

Evaluation of Train Running Safety for Direct Fixation Concrete Track on Light Rapid Transit (경전철 직결식 콘크리트 궤도구조의 열차주행안전성 평가)

  • Choi, Jung-Youl;Kim, Jun-Hyung;Chung, Jee-Seung;Lee, Sun-Gil
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.5
    • /
    • pp.41-46
    • /
    • 2017
  • The coefficient of derailment and the rate of wheel load reduction were used as the index of train running safety that was directly affected the train derailment safety. In aspects of track, the train running safety depends on the complex interaction between wheel and rail, and the track-vehicle conditions (i.e., the curvature, cant, track system, vehicle speed and the operation conditions, etc). In this study, the relationship between the train running safety and the track curvature and vehicle speed for direct fixation concrete tracks currently employed in Korean light rapid transit was assessed by performing field tests using actual vehicles running along the service lines. The measured dynamic wheel load, lateral wheel load and lateral displacement of rail head were measured for same train running on four tested tracks under real conditions, which included curved and tangent tracks placed on the tunnel and bridge, thus increasing the train speed by approximately maximum design speed of each test site. Therefore, the measured dynamic track response was applied to the running safety analysis in order to evaluate the coefficient of derailment, the rate of wheel load reduction and the track gauge widening at each test site, and compare with the corresponding Korean train running safety standard. As the results, the lateral track response of direct fixation concrete track appeared to increase with the decreased track curvature; therefore, it was inferred that the track curvature directly affected the train running safety.