• Title/Summary/Keyword: Rail-to-rail

Search Result 3,389, Processing Time 0.035 seconds

Wear Characteristics of Wheel/Rail Material under Dry and Wet Conditions (건식 및 수분조건에 따른 차륜/레일의 마모특성 평가)

  • Seo, Jung Won;Kwon, Suk Jin;Jun, Hyun Kyu;Lee, Dong Hyeong
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.33 no.7
    • /
    • pp.541-549
    • /
    • 2016
  • Rolling contact fatigue and wear on rails are inevitable in railway operations due to excessive wheel-rail contact stress. The wear is influenced by vehicle speed, contact pressure, environmental conditions, and many other factors. Speeding on a curved track causes many problems such as wear on the gauge of the rail and rolling contact fatigue. Managing environmental conditions can reduce problems on the wheel and rail interface. In this study, the wear characteristics of wheel and rail materials were investigated by twin-disc testing using various parameters. The results of the wear test indicated that the wear rate under dry conditions was larger than that under wet conditions. We found that contact fatigue damage occurred on the rail in dry conditions, however, the surface of the specimen under water remained smooth. Also, the friction coefficient in dry conditions was larger than in wet conditions.

A Three Dimensional Wheelset Dynamic Analysis considering Wheel-rail Two Point Contact (차륜-레일 2점 접촉을 고려한 3차원 윤축 동역학 해석)

  • Kang, Ju-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.1
    • /
    • pp.1-8
    • /
    • 2012
  • Wheelset dynamic analysis is a key element to determine the degree of accuracy of railway vehicle dynamics. In this study, a three-dimensional wheelset dynamic analysis is presented in such a way that the precise wheel-rail contact analysis in three-dimension is implemented into the dynamic equations of a wheelset. A numerical procedure that can be used for the analysis of a wheelset dynamics when the wheel-rail two point contact occurs in a cornering maneuver is developed. Numerical solutions of the constraint equations and the dynamics equations of a wheelset are achieved by using Runge-Kutta method. The proposed wheelset dynamic analysis is validated by comparison against results obtained from VI-RAIL analysis.

A Study on an Impedance Matching Technique for Rail Power Line Communication (레일 전력선통신을 위한 임피던스 정합방안 연구)

  • Seo, Ill-Kwon;Ahn, Seung-Ho;Kim, Chul-Su
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.202-207
    • /
    • 2016
  • An auxiliary real-time train communications system among drivers, train-traffic controllers and field workers is necessary to share hazard information (i.e. rockfall detection, track maintenance) in low visibility zones (long tunnels and steep curved track). To develop the appropriate communication system, this paper proposes a new way of power line communication using the rail track (Rail - PLC), which has little noise and distortion of attenuation. Therefore, it is important to measure the impedance of the rail and to apply an impedance matching technique to increase the transmission characteristic of the Rail - PLC. This study would evaluate the reflection and the transmission characteristics of the rail using a network analyzer and an impedance matching transformer. The suitable impedance matching ratio was 1:3.28 from the result of back-to-back testing. The results confirmed that the transformer can improve the performance of the transmission signal in Rail - PLC using an impedance matching technique.

An Algorithm to Analyze Rail Potential Rise in DC Traction Power Supply System (레일전위상승 분석을 위한 컴퓨터 알고리즘)

  • Chung, Sang-Gi;Kim, Hyung-Chul;Jung, Ho-Sung;Kwon, Sam-Young
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.5
    • /
    • pp.687-693
    • /
    • 2009
  • An algorithm and a computer software are developed for the analysis of rail potential rise. The algorithm is intended to be integrated with the traction power system simulation program. In the algorithm, rail potentials are obtained by two step process. First the injection currents to the negative rail are obtained from load-flow study. In the next step, a network consisting of negative rail and the injection currents are constructed. Leakage resistance to ground are added to the network. And the network is analyzed for rail potentials. A software is developed to verify the validity of the algorithm. The result of the software is compared with the Simulink/SymPower circuit analysis result. The differences between the two results are with the acceptable range. The advantage of this algorithm is that it can be integrated with the existing traction power supply simulation program easily, which usually ignores negative rail's leakage resistance.

A High Voltage CMOS Rail-to-Rail Input/Output Operational Amplifier with Gain enhancement (전압 이득 향상을 위한 고전압 CMOS Rail-to-Rail 입/출력 OP-AMP 설계)

  • An, Chang-Ho;Lee, Seung-Kwon;Jun, Young-Hyun;Kong, Bai-Sun
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.44 no.10
    • /
    • pp.61-66
    • /
    • 2007
  • A gain enhancement rail-to-rail buffer amplifier for liquid crystal display (LCD) source driver is proposed. An op-amp with extremely high gain is needed to decrease the offset voltage of the buffer amplifier. Cascoded floating current source and class-AB control block in the op-amp achieve a high voltage gain by reducing the channel length modulation effect in high voltage technologies. HSPICE simulation in $1\;{\mu}V$ 15 V CMOS process demonstrates that voltage gain is increased by 30 dB. The offset voltage is improved from 6.84 mV to $400\;{\mu}V$. Proposed op-amp is fabricated in an LCD source driver IC and overall system offset voltage is decreased by 2 mV.

Management Process Study to RAMS Application of Light Rail Transit System (경량전철 시스템의 RAMS 적용을 위한 관리 프로세스 연구)

  • Cha, Gi-Ho;Park, Jin-Jae;Lee, Jae-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.226-238
    • /
    • 2011
  • RAMS (Reliability, Availability, Maintainability, Safety) study has received far less rigorous analysis in the system performance and integration level, and RCM (Reliability Centered Maintenance) research has been studying to improve the maintenance efficiency in the operational steps based on collected data of real operational cases. This paper analyzes the basic concepts based on KS X ISO/IEC 15288 system life-cycle process in the whole system for the light rail transit construction, and the research suggests an approach to the management process of the applicable main tasks. The paper "Management Process Study to RAMS Application of Light Rail Transit System" introduces Airport Rail cases and guidelines by using RAMS which is the major role in the system engineering technical process of ISO/IEC 15288 (International Organization for Standardization/International Electrotechnical Commission 15288) to apply RAMS in domestic light rail transit efficiently, the aim of this study is to broaden of understanding RAMS.

  • PDF

Rail Surface Defect Detection System of Next-Generation High Speed Train (차세대 고속열차의 레일표면 결함 검출 시스템)

  • Choi, Woo-Yong;Kim, Jeong-Yeon;Yang, Il-Dong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.5
    • /
    • pp.870-876
    • /
    • 2017
  • In this paper, we proposed the automatic vision inspection system using multi-layer perceptron to detect the defects occurred on rail surface. The proposed system consists of image acquisition part and analysis part. Rail surface image is acquired as equal interval using line scan camera and lighting. Mean filter and dynamic threshold is used to reduce noise and segment defect area. Various features to characterize the defects are extracted. And they are used to train and distinguish defects by MLP-classifier. The system is installed on HEMU-430X and applied to analyze the rail surface images acquired from Honam-line at high speed up to 300 km/h. Recognition rate is calculated through comparison with manual inspection results.

Wear and Fatigue Properties of Surface-Hardened Rail Material (표면 강화처리 레일의 마모 및 피로 특성)

  • Chang, Seky;Pyun, Young-Sik
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.25 no.5
    • /
    • pp.380-385
    • /
    • 2016
  • Railway tracks are repeatedly overstressed and damaged owing to increase in passing tonnage and numerous contact cycles between wheels of train and rails. In order to ensure safe train operation, heat-treated rails are used in addition to regular inspection and maintenance of these rails. Normal rails were treated using ultrasonic nanocrystal surface modification (UNSM) to strengthen the surface of rails. A few changes in surface properties were detected with respect to hardness and compressive residual stress after UNSM treatment. Wear and rolling contact fatigue tests were performed using rails whose surfaces were hardened by UNSM and heat-treated rails. The amount of wear and fatigue life cycles were measured to estimate the effect of UNSM on the rail material. The material of the surfacehardened rail showed improved wear and rolling contact fatigue properties.

Fatigue Life Evaluation for Used Rail on Track Types (궤도형식별 사용레일의 피로수명 평가)

  • Kang, Sung Won;Lim, Hyung-Jun;Park, Yong-Gul
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.5
    • /
    • pp.649-657
    • /
    • 2017
  • In this study, fatigue testing was carried out for long-term use of rail according to track type. From S-N curves for 50%~0.01% failure probability, the fatigue life of the long-term use rail for each track type was derived using the weight probability analysis technique on the experimental data. Because the rails used in the fatigue test have different cumulative tonnages, the number of repetitions was modified by averaging the cumulative tonnage. In addition, the bending stresses of rail bottoms, considering rail surface irregularities, track support stiffnesses and train speeds, were evaluated using the predicted rail bending stresses derived from existing studies. As a result, for rail fatigue life evaluation, the fatigue life of rail on the ballast track was found to be more than 200 million tons higher than the standard value for rail replacement. Also, the fatigue life of rail on concrete track is more than 300 million tons higher than that on ballast track. The Haibach rule is adaptable for the fatigue life evaluation of rail for stress range under fatigue limit.

Rolling Contact Fatigue Analysis According to Defect Size on Rail (레일의 표면결함크기에 따른 구름접촉수명평가)

  • Seo, Jung-Won;Kwon, Seong-Tae;Lee, Dong-Heong;Kwon, Seok-Jin
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.637-642
    • /
    • 2011
  • Rails are subjected to damage from rolling contact fatigue, which leads to defects such as cracks. Rolling contact fatigue damages on the surface of rail such as head check, squats are one of growing problems. Another form of rail surface damage, known as "Ballast imprint" has become apparent. This form of damage is associated with ballast particles becoming trapped between the wheel and the surface of rail. These defects are still one of the key reasons for rail maintenance and replacement. In this study, we have investigated whether the ballast imprint is an initiator of head check type cracks and effect of defect size using Finite element analysis. The FE analysis were used to investigate stresses and strains in subsurface of defects according to variation of defect size. Based on loading cycles obtained from FE analysis, fatigue analysis for each point was carried out.

  • PDF