• Title/Summary/Keyword: Rail-to-rail

Search Result 3,389, Processing Time 0.028 seconds

Study on the Wedge Angle of Wedge Type Rail Clamp for Container Crane (컨테이너 크레인용 쐐기형 레일 클램프의 쐐기각에 대한연구)

  • Han, Geun-Jo;Lee, Ho;Sim, Jae-Jun;Han, Dong-Sub;An, Chan-Woo;Jeon, Young-Hwan
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.21 no.9
    • /
    • pp.119-126
    • /
    • 2004
  • In this paper, we design a wedge type rail clamp which can protect container crane from a sudden strong blast with constant clamping force regardless of the operating period. When we design wedge type rail clamp, it is important to determine the angle of wedge and analyze a contact condition of roller and wedge so that we might develop a wedge type rail clamp for parking devices of port cargo working system with variable capacity. Therefore, this paper suggests a process to decide wedge angles within feasible range which could be obtained using load analysis and FEA of wedge type rail clamp

A Study for Fatigue Crack Propagation Behavior of KS50N Rail Steel under Welding Line (KS50N Rail 용접부의 피로균열 성장거동)

  • 박제용;지용찬;김진성;정경희
    • Proceedings of the KSR Conference
    • /
    • 1998.11a
    • /
    • pp.553-559
    • /
    • 1998
  • This thesis studied to evaluate the fatigue behavior and propagation of rail steel under welding line. Test of crack growth was performed by all member of rail under constant amplitude loading at the structures laboratory in Hongik University. The effect of the following parameters with initiated crack length on the bottom edge of rail were studied. Here, fracture mechanics mode is opening mode. and Testing Material is KS50N Rail. From analysis and experimented result on the three Point bending in the lab, This paper presented a effect of crack growth , shape and remaining service life. Further more, according to the variable crack length, variable section and the ratio of section the fatigue behavior and propagation were studied.

  • PDF

Interaction analysis of Continuous Slab Track (CST) on long-span continuous high-speed rail bridges

  • Dai, Gonglian;Ge, Hao;Liu, Wenshuo;Chen, Y. Frank
    • Structural Engineering and Mechanics
    • /
    • v.63 no.6
    • /
    • pp.713-723
    • /
    • 2017
  • As a new type of ballastless track, longitudinal continuous slab track (CST) has been widely used in China. It can partly isolate the interaction between the ballastless track and the bridge and thus the rail expansion device would be unnecessary. Compared with the traditional track, CST is composed of multi layers of continuous structures and various connecting components. In order to investigate the performance of CST on a long-span bridge, the spatial finite element model considering each layer of the CST structure, connecting components, bridge, and subgrade is established and verified according to the theory of beam-rail interaction. The nonlinear resistance of materials between multilayer track structures is measured by experiments, while the temperature gradients of the bridge and CST are based on the long-term measured data. This study compares the force distribution rules of ballasted track and CST as respectively applied to a long span bridge. The effects of different damage conditions on CST structures are also discussed. The results show that the additional rail stress is small and the CST structure has a high safety factor under the measured temperature load. The rail expansion device can be cancelled when CST is adopted on the long span bridge. Beam end rotation caused by temperature gradient and vertical load will have a significant effect on the rail stress of CST. The additional flexure stress should be considered with the additional expansion stress simultaneously when the rail stress of CST requires to be checked. Both the maximum sliding friction coefficient of sliding layer and cracking condition of concrete plate should be considered to decide the arrangement of connecting components and the ultimate expansion span of the bridge when adopting CST.

A Constant-gm Global Rail-to-Rail Operational Amplifier with Linear Relationship of Currents (전영역에서 선형 전류 관계를 갖는 일정 트랜스컨덕턴스 연산 증폭기의 설계)

  • Jang, Il-Gwon;Gwak, Gye-Dal;Park, Jang-U
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.37 no.2
    • /
    • pp.29-36
    • /
    • 2000
  • The principle and design of two-stage CMOS operational amplifier with rail-to-rail input and class-AB output stage is presented. The rail-to-rail input stage shows almost constant transconductance independent of the common mode input voltage range in global transistor operation region. This new technique does not make use of accurate current-voltage relationship of MOS transistors. Hence it was achieved by using simple linear relationship of currents. The simulated transconductance variation using SPICE is less the 4.3%. The proposed global two-stage opamp can operate both in strong inversion and in weak inversion. Class AB output stage proposed also has a full output voltage swing and a well-defined quiescent current that does not depend on power supply voltage. Since feedback class- AB control is used, it is expected that this output stage can be operating in extremely low voltage. The variation of DC-gain and unity-gain frequency is each 4.2% and 12%, respectively.

  • PDF

A Study on the Expansion of the Facility of Port Rail Depot (항만 철송장 시설규모 개선에 관한 연구)

  • Yun, Dong-Hee;Lee, Sang-Myoung;Lee, Yong-Sang
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3256-3263
    • /
    • 2011
  • Large scaled railway freight transportation facilities in harbors are located in Busan port and Gwangyang port. The port rail depot plays an important role as the departure and destination function of railway logistics. However, presently, it is not relatively vitalized because it is not reflect the railway freight transportation's characteristics such as scale of railway tracks or yards area. In addition, even if port rail depot is vitalized, processing capacity is already saturated. Therefore, it is difficult to increase rail transport quantity. To activate railway container transportation business, it is very necessary to recalculate the facility size of port rail depots. Focused on the Busan new port rail depot, this paper analyzes the problems of port rail depot facility that has currently opened and finds some alternatives to resolve them.

  • PDF

Railway Underground Crossing Method Using PC Slab (직접 PC슬래브설치를 통한 철도지하횡단 공법의 적용 연구)

  • Min, Kyung-Ju;Lee, Bang-Woo;Park, Byung-Yong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2439-2449
    • /
    • 2011
  • Existing grade crossings between railway and roadway area gradually changed to grade separation systems by the law. In the case of new roadway construction which crosses railways, it shall be grade separation system in principle. With the railway underground crossing method, many practices have been developed which can minimize rail displacements and avoid rail release. With these methods, the effects to the train can be reduced. The underground crossing methods can be identified as open-cut methods and non open-cut methods. The open-cut methods include temporary support methods and special rail construction methods. Also the non open-cut methods includes pipe roof methods, front jacking methods, messer shield methods, NTR methods and JES methods. Among these, the most suitable method is applied considering safety, economy, class of each rail system (train passing frequency and velocity), etc. In the non open-cut methods, the cost and duration shall be increased to keep existing rail system during construction. In the open-cut methods which use plate girders, the rail speed shall be restricted due to the displacement and vibration of the girder. In this study new grade separation methods were developed. With this method, the safety during construction can be increased. This method refines temporary support methods, but pc slab girder with huge stiffness is applied instead of plate girders. With this method, the rail displacement can be reduced and higher safety can be obtained during construction. Also construction cost and duration can be minimized because the temporary work and the overburden soil depth can be reduced.

  • PDF

A geometrical review on the wear of rail and KTX wheel (레일과 차륜의 마모에 대한 기하학적 검토)

  • ;;;;R. Farabet
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.442-449
    • /
    • 2000
  • Before the complete construction of new high-speed line between Seoul and Pusan, KTX is going to operate on both new high-speed line between Seoul and Daegu and electrified conventional lines between Daegu and Pusan. Then, the wheels of KTX are going to operate on various rails such as KS50N and KS60 of conventional line as well as UIC60 of high-speed line. Also, conventional line will have a mixed traffic mode with various types of trains operating on it, such as Saemaul and Mugunghwa. Hence, this study reviews the wear phenomena of wheels and rails in geometrical point of view by comparing their profiles. The analyses of the results show that because UIC60 rail is designed for KTX, KS50N rail whose profile is similar to that of UIC60 will not have any impact on the shape of wheel wear. On the other hand, KS60 rail is expected to have partial wear on both the flange of KTX wheel and the gauge corner of the rail in the initial stages. However, the operation of the trains whose wheels have 1/20 conicity will cause partial sidewear on the inside of the rail and the movement of the contact point between KTX wheel and the rail toward the inside of the track. As a result, the flange wear of KTX wheel will be reduced and the formation of wear-equilibrium profile will be faster.

  • PDF

Research on the Correlation Between Rail Transit Entrances and Urban Form in High-Density Areas

  • Dongzhu Chu;Hong Su
    • International Journal of High-Rise Buildings
    • /
    • v.12 no.1
    • /
    • pp.35-47
    • /
    • 2023
  • The transport system and its infrastructure are not only the fundamental means of sustaining the operation of contemporary cities, but also important drivers for the evolution of urban form. Rail transit, critical to improving the operational efficiency and optimizing the spatial layout in cities, is one of the critical conditions for high-density areas with limited land and concentrated resources to be compact to take on complex challenges. As a node element of infrastructure, rail transit entrances are the most important points connecting the rail transit system with urban space. Although influenced by urban form, their quantity and location also influence and shape the evolution of urban space form. Based on the development gap of high-density areas in various contexts, focusing on various rail transit stations in Asia, this research analyzes the correlation between rail transit entrances and peripheral high-density urban form in a delicate, dynamic and granular way. The research considers both horizontal and vertical perspectives, in combination with the urban evolution process in time series, to explore the development trend of high-density urban form in Asia from the aspect of correlation, and building a new foundation for research on urban form, suitable for different types of cities.

Shear anchor behavior and design of an embedded concrete rack rail track for mountain trains

  • Hyeoung-Deok Lee;Jong-Keol Song;Tae Sup Yun;Seungjun Kim;Jiho Moon
    • Computers and Concrete
    • /
    • v.33 no.4
    • /
    • pp.373-384
    • /
    • 2024
  • In this study, a novel mountain train system was developed that can run along a steep gradient of 180 ‰ and sharp curve with a minimum radius of 10 m. For this novel mountain train, an embedded precast concrete rack rail track was implemented to share the track with an automobile road and increase constructability in mountainous regions. The embedded rack rail track is connected to a hydraulically stabilized base (HSB) layer with shear anchors, which must have sufficient longitudinal resistance because they bear most of the traction forces originated from the rack rail and longitudinal loads owing to the steep gradient. In addition, the damage to the shear anchor parts, including the surrounding concrete, must be strictly limited under the service load because the maintenance of shear anchors inside the track is extremely difficult after installation. In this study, the focus was made on the shear anchor behavior and design an embedded rack rail track, considering the serviceability and ultimate limit states. Accordingly, the design loads for mountain trains were established, and the serviceability criteria of the anchor were proposed. Subsequently, the resistance and damage of the shear anchors were evaluated and analyzed based on the results of several finite element analyses. Finally, the design method of the shear anchors for the embedded rack rail track was established and verified.

The Comparative Study of the UK and Japan's Rail Privatization, Focusing on Policy Process and Outcomes (영국과 일본의 철도민영화 비교 연구 - 추진과정과 성과를 중심으로 -)

  • Lee, Yong-Sang
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.1
    • /
    • pp.81-94
    • /
    • 2008
  • Recently, most of countries have been adopting the policies that aim to deal with the Problems of road congestion, environmental problems and the decreasing the volume of rall. A vital important subject is the reform of railways. Actually, the reform of railways has been carried out in various kind of ways, however the most epoch-making policy has been privatization of railways. Historically, Japan made the first step when it carried out regional privatization, unifying the infrastructure and operation. It created a 6 passenger enterprises and 1 freight enterprise. Meanwhile, in the case of the UK, discussion about rail privatization started the middle of 1980 and was implemented in 1994. It was implemented according to a functional division based on a separation of infrastructure and operation, creating a lot of different enterprises. With regard to the UK and Japan, there have been some debates about the methods of privatization, in particular, some scholars suggest that the rail accidents in the UK are a result of division of the infrastructure and operation. In addition to, some insist that the accident which occurred on 27th April 2005 at Hukujiyama in Japan was also attributable to the emphasis on profitable management. This paper examines the process and outcomes of rail privatization between the UK and Japan, especially focusing on different methods of privatization. This paper may provide some lessens for rail privatization policy. First, the rail privatization policy needs a enough time to complete the scheme. Second it is require to participate in the consumer, mass communication and rail of ncers who are involved the operation. Third, it is essential to have a huge investment, high technology and strong organization to drive.