• Title/Summary/Keyword: Rail Network

Search Result 266, Processing Time 0.018 seconds

Estimation of Groundwater Recharge in Junggwae-Boeun Area in Ulsan City Using the Water Balance and Hydrogeological Analyses (물수지 및 수리지질 분석을 통한 울산광역시 중괘천-보은천 지역의 지하수 함양량 산정)

  • An, Jeong-Hoon;Hamm, Se-Yeong;Lee, Jeong-Hwan;Kim, Nam-Hoon;Yang, Dae-Bok;Hwang, Jee-Gwang
    • Economic and Environmental Geology
    • /
    • v.41 no.4
    • /
    • pp.427-442
    • /
    • 2008
  • Estimation of groundwater recharge is one of the most critical issues in sustainable management of groundwater resources. This study estimated groundwater recharge in the Junggwae-Boeun area in Ulsan City, by using the water balance and hydrogeological characteristics of geology and soil. Evapotranspiration was computed by using the Thornthwaite method, and direct runoff was determined by using the SCS-CN technique. Groundwater recharge was obtained as 266 mm/a (20.6% of the average annual precipitation, 1296 mm/a), with 779 mm/a (60.1%) of evapotranspiration and 119 mm/a (9.2%) of direct runoff. Precipitation and groundwater recharge was highly correlated, comparing with the relationships between precipitation and evapotranspiration, and between precipitation and direct runoff. This fact indicates that groundwater recharge responds more sensitively to precipitation than evapotranspiration and direct runoff do.

Study on Evaluation Criteria for Multimodal Transport Routing Selection (복합운송경로 선정을 위한 평가기준에 관한 연구)

  • Kim So-Yeon;Choi Hyung-Rim;Kim Hyun-Soo;Park Nam-Kyu;Cho Jae-Hyung;Park Yong-Sung;Cho Min-Je
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.06b
    • /
    • pp.265-271
    • /
    • 2006
  • According to globalization of world economy by extension of production, sales and distribution all around the world and international transportation system changed into a transport system that puts great importance on speediness and value-added services, international transport system is changing into a Multimodal Transport Routing centered system that systematically connects marine, air and rail transports. Due to such changes production, sales and distribution must be provided in time and Multimodal Transport Routing, which can provide multi-dimensional logistics services to customers of global network, is needed but information connection for international transport and connection system between transport modes are insufficient and can not be activated. Especially in Korea, selection standard of 3rd party logistics companies and transport companies is presented, but logistics exclusive companies, which plan and execute the transportation, can't present a systematic evaluation standard for international Multimodal Transport Routing, selection. Thus, this research surveys important previous studies about Multimodal Transport Routing, selection, derives an evaluation standard for Multimodal Transport Routing, selection through interview with company officials, and presents a theoretical basis for Multimodal Transport Routing, selection through systematic analysis of Multimodal Transport Routing, selection using Analytical Hierarchy Process (AHP).

  • PDF

Considering combined operation method with the wide area rapid-transit and high speed-transit for wide area traffic service offer at high speed track section (고속선구에 광역교통서비스 제공을 위한 고속철도와 급행전철 혼용운용 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Cha, Ki-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1900-1906
    • /
    • 2008
  • According as zone of life of big city is expanded by new city development etc.., need special skill master plan compensation which can be systematic for wide area traffic problem solution and confusion expense minimization in the metropolitan area because wide area of capital region traffic is gone continuously and continues. Accordingly, Kyonggi Province suggested rapid-transit railway achievement that can connect Seoul Gangnam in 20 minutes with Dongtan new city recently. MLTM(Ministry of Land Transport and Maritime Affaris) announced "Capital region railway network improvement plan research services (2007.12)" result that Gangnam High-speed railway route (Suse $\sim$ Dongtan $\sim$ Pyeongtaek) construction for offer High-speed railway service to capital region and Kyonggi southern part area inhabitantses and need to line capacity tribe solution by Seoul-Busan high-speed railway second-stage and Honam high speed railroad completion. Is judged that need examination about wide area rapid-transit railway combined application operation that take advantage of rail track reserve capacity of High-speed railway for utilization efficiency elevation of country and efficient investment of national finance according as High-speed railway and Gangnam rapid-transit railway route that is suggested in Kyonggi Province are overlaped. Therefore, in this research, I wish to quote investment efficiency plan of railroad business by that different kind's train is run in uniformity track by presenting combined application operation plan and working expenses curtailment effect etc. that is optimized through analysis of roadbed and E & M technology condition, intermediate station plan, train operation planning etc. in case of wide area rapid-transit railway and high-speed railway run combined application.

  • PDF

Research and Application of Fault Prediction Method for High-speed EMU Based on PHM Technology (PHM 기술을 이용한 고속 EMU의 고장 예측 방법 연구 및 적용)

  • Wang, Haitao;Min, Byung-Won
    • Journal of Internet of Things and Convergence
    • /
    • v.8 no.6
    • /
    • pp.55-63
    • /
    • 2022
  • In recent years, with the rapid development of large and medium-sized urban rail transit in China, the total operating mileage of high-speed railway and the total number of EMUs(Electric Multiple Units) are rising. The system complexity of high-speed EMU is constantly increasing, which puts forward higher requirements for the safety of equipment and the efficiency of maintenance.At present, the maintenance mode of high-speed EMU in China still adopts the post maintenance method based on planned maintenance and fault maintenance, which leads to insufficient or excessive maintenance, reduces the efficiency of equipment fault handling, and increases the maintenance cost. Based on the intelligent operation and maintenance technology of PHM(prognostics and health management). This thesis builds an integrated PHM platform of "vehicle system-communication system-ground system" by integrating multi-source heterogeneous data of different scenarios of high-speed EMU, and combines the equipment fault mechanism with artificial intelligence algorithms to build a fault prediction model for traction motors of high-speed EMU.Reliable fault prediction and accurate maintenance shall be carried out in advance to ensure safe and efficient operation of high-speed EMU.

A Development of Optimum Operation Models for Express-Rail Systems (급행열차 도입을 통한 최적운행방안 수립에 관한 연구 - 수도권 광역 도시철도를 중심으로 -)

  • Park, Jeong-Soo;Lee, Hoon-Hee;Won, Jai-Mu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.679-686
    • /
    • 2006
  • Recently, the city railway in the Seoul Metropolitan Area (SMA) has offered a low quality of service as a passage time, because it was operated slowly. So, the people who live in modern society are not satisfied about passage time, therefore, this study tried to make that the subway in the SMA becomes a more functional and effective wide-area-transportation-network through an express train introduction's method which examined cases from abroad and current system. and then presented how express train could be applied to current system. In a case study, We used the An-San Line and Su-In Line as a examples and developed a schedule which can minimize the delaying time of subway by using Branch & Bound Algorithm. The train operational plan was loaded to consider a railroad siding, Obtained site, and the dispatch interval(three to ten minutes) for the express and local lines and finally, We presented an alternative operational plan which made by those factors.

A Study on Estimating Optimal Tonnage of Coastal Cargo Vessels in Korea (우리나라 연안화물선의 적정선복량 추정에 관한 연구)

  • 이청환;이철영
    • Journal of the Korean Institute of Navigation
    • /
    • v.13 no.1
    • /
    • pp.21-53
    • /
    • 1989
  • In the past twenty years, there has been a rapid increase in the volume of traffic in Korea due to the Korean great growth of the Korean economy. Since transformation provides an infrastructure vital to economic growth, it becomes more and more an integral part of the Korea economy. The importance of coastal shipping stands out in particular, not only because of the expansion limit on the road network, but also because of saturation in the capacity of rail transportation. In spite of this increase and its importance, coastal shipping is falling behind partly because it is givenless emphasis than ocean-going shipping and other inland transportation systems and partly because of overcompetition due to excessive ship tonnage. Therefore, estimating and planning optimum ship tonnage is the first take to develop Korean coastal shipping. This paper aims to estimate the optimum coastal ship tonnage by computer simulation and finally to draw up plans for the ship tonnage balance according to supply and demand. The estimation of the optimum ship tonnage is peformed by the method of Origin -Destimation and time series analysis. The result are as follows : (1) The optimum ship tonnage in 1987 was 358, 680 DWT, which is 54% of the current ship tonnage (481 ships, 662, 664DWT) that is equal to the optimum ship tonnage in 1998. this overcapacity result is in excessive competition and financial difficulties in Korea coastal shipping. (2) The excessive ship tonnage can be broken down into ship types as follows : oil carrier 250, 926 DWT(350%), cement carrier 9, 977 DWT(119%), iron material/machinery carrier 25, 665 DWT(117%), general cargo carrier 17, 416DWT(112%). (3) the current total ship crew of 5, 079 is more than the verified optimally efficient figure of 3, 808 by 1271. (4) From the viewpoint of management strategy, it is necessary that excessive ship tonnage be reduced and uneconomic outdated vessels be broken up. And its found that the diversion into economically efficient fleets is urgently required in order to meet increasing annual rate in the amounts of cargo(23, 877DWT). (5) The plans for the ship tonnage balance according to supply and demand are as follows 1) The establishment of a legislative system for the arrangement of ship tonnage. This would involve; (a) The announcement of an optimum tonnage which guides the licensing of cargo vessels and ship tonnage supply. (b) The establishment of an organization that substantially arrangement tonnage in Korea coastal shipping. 2) The announcement of an optimum ship tonnage both per year and short-term that guides current tonnage supply plans. 3) The settlement of elastic tariffs resulting in the protect6ion of coastal shipping's share from other tonnage supply plans. 4) The settlement of elastic tariffs resulting in the protection of coastal shipping's share from other transportation systems. 4) Restriction of ocean-going vessels from participating in coastal shipping routes. 5) Business rationalization of coastal shipping company which reduces uneconomic outdated vessels and boosts the national economy. If we are to achieve these ends, the followings are prerequisites; I) Because many non-licensed vessels are actually operating and threatening the safe voyage of the others in Korea coastal routes, it is necessary that those ind of vessels be controlled and punished by the authorities. II) The supply of ship tonnage in Korean coastal routes should be predently monitored because most of the coastal vessels are to small to be diverted into ocean-going routes in case of excessive supply. III) Every ship type which is engaged in coastal shipping should be specialized according to the characteristics of its routes as soon possible.

  • PDF