• Title/Summary/Keyword: ROAD CONSTRUCTION

Search Result 2,063, Processing Time 0.027 seconds

CONSTRUCTION COST INDEX FOR APPLYING INDEX ADJUSTMENT RATE IN THE ROAD PROJECT

  • Jin-Young Chun;Sungkwon Woo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1112-1117
    • /
    • 2005
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for adjustment of construction contract cost due to fluctuation of prices. However index adjustment rate which is used for adjustment of construction contract cost had some problems in calculating cost index of each expenditure item that could not reflect properly the change of construction cost. For supplementing these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes method of making cost index that utilizes representative items of labor, material, and equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent study. By using this method, it is expected to solve problems which were not reflected in precedent studies.

  • PDF

Landscape Changes Assessment of the National Road-Focused on the National Road in Suburb Areas- (국도의 경관변화 평가-교외지역 국도를 중심으로-)

  • 홍영록;권상준;조태동
    • Korean Journal of Environment and Ecology
    • /
    • v.18 no.1
    • /
    • pp.92-102
    • /
    • 2004
  • In this study, landscape changes were examined by periods through the analysis of visual quantity on the landscape components of national road including the mountains, the sky, road pavements, street trees, paddy fields and dry fields, billboard, telegraph pole, building, structure, slope, guard fence, soundproof wall, and median strip etc. For this, subject national road in suburb arreas was selected to grasp its landscape characteristics, and divisional criteria of landscape type of the national road were suggested to look into the trend of landscape changes by periods. Findings of this study are as follows:1.Divisional criteria of landscape type of the national road include location and geometry, structure, land use, perspective, and surrounding buildings of the national road. 2.The highest visual quantity was found in road pavements by periods among landscape components of the national road. It was found that this result has a thread of connection with previous study emphasizing the importance of road geometry as one of landscape components, and road geometry shall be regarded as a visually significant component in analyzing and evaluating landscape of the national road. 3.Most distinguished factors of landscape changes of the national road by periods were median strip(F=33.296) and street tree(F=32.881), and then the sky(F=24.735) and mountain(F=23.477) showed similar level of statistically significant difference. However, statistically significance difference was not found in buildings and structures. 4.It was shown that natural elements decreased gradually but structural landscape made of artificial elements became the main in construction of the national road. This result implies that although the scenic and ecological soundness is recognized in construction of the national road, it is not out of the limitation of functionalities that is, access and mobility.

A Study on the Traffic Effect Zone and Application of Road Occupying Construction (도로 공사중의 교통영향권역 설정 및 적용성에 관한 연구)

  • Lee, Ju-Ho;Lee, Young-Woo;Lim, Chae-Moon
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.6 no.2
    • /
    • pp.131-139
    • /
    • 2003
  • The links operating interrupted flow are intend to yield the traffic between the out flow and inflow part effect zone of street section, we build the delay model using the time gap between under construction and not. We review the applicability of interrupted flow, and thus we can put this data to practical use as the basis data to compute the inducement charge for traffic delay. Also building about traffic effect zone of interrupted flow wouldn't produce at the section beside occupying roads and construction cross section, thus we must review the plan to minimize traffic delay by the construction occupying road. In future there must be advanced the incomplete in this study, and groping for the various alternatives to minimize the traffic delay by the road occupying construction, with developing the various sets of detailed analyzing models, that is analysis on the street strength, crossroads geometrical forms of crossroads, public traffics, pedestrians, occupying types.

  • PDF

Implementation of Time Management; Based on Road Construction Projects (공정관리 적용에 관한 연구: 도로현장 중심으로)

  • Lee, Kyu-Sun;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.451-456
    • /
    • 2011
  • There is a relationship between effective time management and project success. Therefore, advanced time management techniques have recently been introduced. This paper investigates the current time management practices for road construction sites and proposes lean construction practices to effectively implement time management. This would be helpful to establish an effective schedule plan. Also, an efficient construction site time management system can be developed base on this fundamental research. Furthermore, future research should be performed to investigate the performance of lean construction.

A Markov-based prediction model of tunnel geology, construction time, and construction costs

  • Mahmoodzadeh, Arsalan;Mohammadi, Mokhtar;Ali, Hunar Farid Hama;Salim, Sirwan Ghafoor;Abdulhamid, Sazan Nariman;Ibrahim, Hawkar Hashim;Rashidi, Shima
    • Geomechanics and Engineering
    • /
    • v.28 no.4
    • /
    • pp.421-435
    • /
    • 2022
  • The necessity of estimating the time and cost required for tunnel construction has led to extensive research in this regard. Since geological conditions are significant factors in terms of time and cost of road tunnels, considering these conditions is crucial. Uncertainties about the geological conditions of a tunnel alignment cause difficulties in planning ahead of the required construction time and costs. In this paper, the continuous-space, discrete-state Markov process has been used to predict geological conditions. The Monte-Carlo (MC) simulation (MCS) method is employed to estimate the construction time and costs of a road tunnel project using the input data obtained from six tunneling expert questionnaires. In the first case, the input data obtained from each expert are individually considered and in the second case, they are simultaneously considered. Finally, a comparison of these two modes based on the technique presented in this article suggests considering views of several experts simultaneously to reduce uncertainties and ensure the results obtained for geological conditions and the construction time and costs.

Effects of Forest Road Construction on Stream Water Qualities(I) - The Variation of Suspended Sediment by Forest Road Construction - (임도개설(林道開設)이 계류수질(溪流水質)에 미치는 영향(影響)(I) - 임도개설(林道開設)에 따른 부유토사량(浮遊土砂量)의 변화(變化) -)

  • Chun, Kun-Woo;Kim, Min-Sik;Ezaki, Tsugio
    • Journal of Korean Society of Forest Science
    • /
    • v.85 no.2
    • /
    • pp.280-287
    • /
    • 1996
  • This study was carried out to investigate the export rate of suspended sediment by different precipitation intensity after forest road construction for torrential streams on three different watersheds with various forest road density(Watershed A : 6.67m/ha, Watershed B : 5.52m/ha, and Watershed C : control) in the Experimental Forest of Kangwon National University. The results were as follows. 1. Closely related to the the amount of rainfall in both 1994 and 1995, the average streanfkiw rate was less than $0.25{\times}10^4m^3/day$ during May and June and $5.0{\times}10^4m^3/day$ during July and August. More than $25{\times}10^4m^3/day$ of streanflow rate was occurred twice in 1994 and seven times in 1995. 2. The amount of suspended sediment in three watersheds was less than standard of drinking water(25mg/l) before road construction with daily rainfall of 74mm, 92mm, and 120mm in 1994, also after road construction with daily rainfall of 21mm and 47mm in 1995. But, under the 192mm of daily rainfall, Watershed C did not show the difference in the amount of suspended sediment, however, Watershed A and B produced 1,525mg/l and 775mg/l, respectively, which is 61 and 31 fold of stabdard of drinking water, and construction to export for 35 hours after rainfall. 3. The maximum amount of suspended sediment was less than the standard of drinking water with light rainfall before and after road construction. Under the 192mm of daily rainfall, the maximum amounts of suspended sediment in Watershed A and B were 13,150mg/l and 2,690mg/l, of 526 and 108 fold of standard of drinking water, respectively, showing obvious water pollution by sedimentation. Results of the study indicated that the forest road construction had great influence on the sedimentation, and getting increased by higher road density and heavier rainfall. Therefore such practices as vegetation covering and soil erosion control facility should be established accompanying with forest road construction to prevent from sedimentation.

  • PDF

A Critical Assessment of the Economical Value of Road on Housing Prices Using Contingent Valuation Method - focus on the road construction plan of 47th of Suwon si - (조건부가치추정법을 이용한 도로의 경제가치 추정에 관한 실증적 연구 - 수원시 47번 도로건설계획을 중심으로)

  • Park, Ki-Hak
    • Environmental and Resource Economics Review
    • /
    • v.21 no.4
    • /
    • pp.999-1024
    • /
    • 2012
  • The Purpose of this study was to assess the willingness to pay(WTP) for the new road construction plan(slip road of urban highway which was advertising extensively to reduce the time to the core of metropolitan area) on housing prices using contingent valuation method(CVM). And this study was an empirical study which was based on the consciousness of residents whose apartment was within the Suwon Si's new plan of 47th road construction zone. In this study, it was revealed that the resident's WTP for the plan of new road construction which was built on the neighborhood of apartment was within the 10 percent of housing prices that was similar to the standard declared price of MLTM(Ministry of Land, Transport and Maritime Affairs). And also revealed that the difference of sale prices of real estate company was 24 percent. The statistical assessment results show that both the resident's characteristic variables such as gender, incomes, size of apartment and the accessability variables such as distance to parks, schools, department stores, living facilities were positive effects on the prices of apartments significantly. Finally, the house has depreciated than that of MLTM and WTO since torpedoed the road construction plan. These results imply that, we have to take capital appreciation of the property into account due to road construction since the accessibility was very significantly positive internal effects on the apartment housing prices.

  • PDF

A Method for the Effective Implementation of a Consignment Contract in Road Constructions (도로 수탁공사의 효과적 수행을 위한 방법론)

  • Bak, Gwon-June;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2D
    • /
    • pp.153-161
    • /
    • 2010
  • The city planning of a local government is a continuous process that does not end with the creation of a plan but proceeds through decision-making, monitoring and evaluation phases. As a new city planning is changed and confirmed, there is a chance to construct a large scale road that is connected with an under constructed road. In this case, the expansion of the width and length of road, the addition of bridges or tunnels, and the change of the size and location of interchanges lead to many changes on road design and construction. In the past, the consignment contracts for a road construction have been made in limited numbers and for limited civil works. Now, it is growing in numbers and is making for large scale multi-works. However, the standard process and guidelines for the consignment contracts have not been suggested yet, so there is difficulty in performing the consigned road construction effectively. In this paper, the important factors for the consignment contracts are determined by construction document reviews and expert interviews. Based on these results, a standard process for the consigned contracts and a guideline for agreeing on construction cost are suggested. The costs that should be paid by a consignor are also defined.

A Study on the Digital Construction Information Structure for the Implementing Digital Twin of Road Construction Sites (도로 건설현장의 디지털트윈 구현을 위한 디지털 건설정보구조에 관한 연구)

  • Taewon Chung;Hyon Wook Ji;Jin Hoon Bok
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.23 no.1
    • /
    • pp.153-166
    • /
    • 2024
  • The digitalization of tasks for smart construction requires the smooth exchange of digital data among stakeholders to be effective, but there is a lack of digital data standardization and utilization methods. This paper proposes a digital construction information structure to transform information from road construction sites into digital formats. The study targets include significant tasks, such as work planning, scheduling, safety management, and quality control. The key to the construction information structure is separating construction information into objects and activities, defining unit works by combining these two types of information to ensure flexibility in representing and modifying construction information. The objects and activities have their respective hierarchical structures, which are defined flexibly to match the actual content. This structure achieves both efficiency and detail. The pilot structure was applied to highway construction projects and implemented digitally using general formats. This study enables the digitalization of road construction processes that closely resemble reality, accelerating the digital transformation of the civil engineering industry by developing a digital twin of the entire road construction lifecycle.

Determination of Forest Road Construction Priority Order Using Multiple Criteria Decision Making Methods (다기준의사결정법(多基準意思決定法)에 의한 임도개설순위(林道開設順位)의 결정(決定))

  • Cha, Du Song;Cho, Koo Hyun;Kim, Jong Yoon
    • Journal of Korean Society of Forest Science
    • /
    • v.85 no.2
    • /
    • pp.149-157
    • /
    • 1996
  • The applications of multiple criteria decision making(MCDM) methods were investigated to determine the priority order in forest road construction for timber harvesting and silvicultrual activities in 22 regions. In this paper, MCDM methods have five methods from two kinds of models. The one is non-compensatory preference model including maximin and maximax method; the other is compensatory preference model including simple additive weighting method(SAW), hierarchical additive weighting method(HAW) and technique for order preference by similarity to ideal solution(TOPSIS), SAW and TOPSIS methods turned out to be the most adequate for forest road construction priority order among the five methods tested in this study.

  • PDF