• Title/Summary/Keyword: ROAD CONSTRUCTION

Search Result 2,063, Processing Time 0.028 seconds

Optimum Construction Duration for Road Tunnel Excavation Works (도로터널 굴착공사의 적정공기 판단기준)

  • Kim, Ha-Na;Kim, Dae Young;Kim, Dae-Young;Jeong, Seong-Chun;Huh, Young-Ki
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.4
    • /
    • pp.59-64
    • /
    • 2018
  • Construction schedule acceleration due to unreasonable construction planning frequently leads to construction accidents. In order to avoid such inevitable acceleration and to ensure safety in construction sites, there is a need for objective standards to determine appropriate construction duration for each construction process earlier in the process. In order to achieve the goal, intensive experts interviews were firstly conducted to identify candidate drivers affecting construction schedule of road tunnel excavation works. Then, a total of 34 field data was collected from on-going sites to analyze. It was found that actual excavation length per one day on site is varied mostly by Rock Mass Rating(RMR) types from various statistical analyses. Therefore an one-way table of excavation length per a day by RMR types were presented in a form of percentile. The results will help industry experts determine the most appropriate construction schedule for the works, which eventually lead to a zero accident site in many ways.

A study on the on-the-spot survey of Road occupation Information using mobile techniques (모바일 기술을 활용한 도로점용민원 현장조사 방안 연구)

  • Kim, Byung-Kon;Kim, Jin-Uk;Jeong, Seong-Yun;Kim, Young-Jin;Kim, Tae-Hak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.832-835
    • /
    • 2007
  • The purpose of this study is to suggest the on-the-spot survey method of road occupation information. The on-the-spot survey method is proposed through the analysis of information searching function, document and process. The decision of road occupation permission and the grasp of illegal occupation status are closely connected with national rights and interests. To keep the road occupation permission and illegal occupation status, the easy acquisition of road occupation information is very important. But the person in charge of road occupation have a difficulty in obtaining occupation information because that information is still managed by paper drawing. Accordingly. this study develop the on-the-spot survey tool of road occupation using the occupation information that is managed by Construction Authorization & Permission System and the mobile techniques like UMPC. As the result of this study. the efficiency on the authorization. permission. and public grievance of construction project has improved

  • PDF

Evaluation of 2+1 Roads Application to Improve Rural Two-lane Highway in Korea (국내 2+1차로 도로 도입에 따른 교통운영 및 경제적 비용 측면의 기대효과 분석)

  • Chae, Chan Dle;Lee, Dong Min;Cho, Han Seon
    • International Journal of Highway Engineering
    • /
    • v.15 no.3
    • /
    • pp.85-92
    • /
    • 2013
  • PURPOSES: The purpose of this paper is to estimate expected effects on traffic operational and economic aspects of 2+1 roads application in Korea. METHODS : Micro simulation study using VISSIM 5.0 was used to analyze the operation efficiency of 2+1 roads compared to two-lane highways and four-lane highways. Some scenarios for various traffic volumes were set up in order to analyze the effect of 2+1 roads under various traffic situations. Also imaginary road networks were set up for each type of roads. The MOEs to measure the operation efficiency were selected with average travel speed and delay. For analyzing economic effect of 2+1 roads, construction cost of a specific imaginary 2+1 road was compared to construction cost of a four-lane highway with same conditions. RESULTS: The results of study show that a 2+1 road is more effective with 19 percents higher average travel speed and 39 percents lower average delay than a two-lane highway. In the economic analysis, construction costs to construct a 2+1 road are saved as approximately 26.4~40.7 percents when compared to construction of four-lane highway. CONCLUSIONS: It can be concluded that 2+1 roads can improve the traffic operational level of service for two-lane highways and 2+1 roads can be applied as an effective design alternative for higher-volume two-lane highways in Korea.

The Extension of IFC Model Schema for Geometry Part of Road Drainage Facility (도로 배수시설의 형상정보 표현을 위한 IFC 정보모델 확장 방안)

  • Cho, Geun-Ha;Won, Ji-Sun;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5987-5992
    • /
    • 2013
  • The authors suggest the extension IFC schema of drainage facilities for the purpose of establishment the information model standard for the roads. IFC entities, types and properties for drainage facilities are defined by the analysis of road design documents for extraction physical component and design information IFC schema is able to be extended through the result of this research. Futhermore, IFC for additional road facilities is able to be used as construction process control, quantity take off, and simulation applications with the interoperability of the IFC.

A Study on the Construction of Non-National Forest Road in Japan (일본의 민유림 임도사업에 관한 고찰)

  • Cha, Du-Song;Kobayashi, Hiroshi;Ji, Byoung-Yun
    • Journal of Forest and Environmental Science
    • /
    • v.13 no.1
    • /
    • pp.104-113
    • /
    • 1997
  • Japan is considered to have accumulated much experience of the maintenance. financial support. construction. and related law system of non-national forest road. These data were collected and reviewed to provide the basis of the legal and institutional framework for the forest road construction of Korea. The results show that the non-national forest road plays a key role in the development and enhancement of rural areas' surroundings as its legal and institutional systems are brought to effect and meet the period' s requires.

  • PDF

A Study on the Development of the System for the Road Occupation Permit Information Management (도로점용허가 정보관리를 위한 도로점용시스템 개발에 관한 연구)

  • Kim, Young-Jin;Kim, Byung-Kon;Jeong, Seong-Yun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6495-6503
    • /
    • 2013
  • This paper presents a study on the development of a web-based system for the road occupation permit information management. For the development of this system, the survey of information system related to a road occupation permit, an analysis of road occupation business process, the definition of the road occupation permit data, the development of the system, and the application of the system to the work-related to road occupation permit were conducted consecutively. In an analysis of the road occupation business process, the statutes, such as the road act were investigated, work examples of the road management agent were reviewed, and a survey targeting staff and citizens was carried out. The information classification code to represent the attributes of the data was developed to manage the information in each road occupation permit process, and the metadata was defined considering the hierarchy relationship of the information. The road occupation and access system was developed based on the information classification code and metadata to reflect the user requirements. The System was applied to the Regional Construction and Management Administration and Branch Office belonging to the Ministry of Land, Infrastructure and Transport Affairs. By replacing the business process based on paper documents to the business process based on the information system, it is expected that the service of the civil petition be upgraded and the business process of the road occupation permit be reformed.

Applications of the Light Weight Method of EPS to Sub-road Fills at the Seaside (해안 도로상의 EPS 하중경감공법의 해석)

  • 장용채
    • Journal of Korean Port Research
    • /
    • v.14 no.2
    • /
    • pp.233-239
    • /
    • 2000
  • The expansion of old road is needed in constructing the entrance at the $\bigcirc$$\bigcirc$I/C road in $\bigcirc$$\bigcirc$city. To strength the national competition, many agents who concerned do their best for finishing that construction early as soon as possible. In generally, soil embankment on soft foundation is caused to reduce the stability by making the settlement of ground surface due to the over load. Thus, we try to make it stable by building EPS embankment construction which in our working place is one kind of the method of light embankment construction after excavating the original ground.

  • PDF

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

Construction of Road Alignment Information Using LiDAR Data (LiDAR 자료를 이용한 도로의 선형정보 구축)

  • Lee, Jong-Chool;Kim, Hee-Gyoo;Seo, Yoong-Cheol;Roh, Tae-Ho
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2007.04a
    • /
    • pp.471-474
    • /
    • 2007
  • On the road, geometric structure such as horizontal alignment, vortical alignment and crossing inclination ate important to explain characteristics of road and safety analysis. Especially, horizontal and vortical alignment are have to do with safety of covering. In existing road, for the safety analysis or alignment improvement and expansion pavement, it needs alignment factor of road. Alignment factor of road can be acquired by design drawing. But, design drawing can be not exist because of rack of facility management and national policy that centered to construction. And also, existing design drawing have a lot of differences in comparison with another existing design drawing cause of alignment improvement. In this case, for the precise analysis of alignment, 3-dimensional location information on the road centerline and acquisition of location information which related geometric structure are must to be preceded. In this study, therefore, it provide alignment factors which needed to alignment improvement and road safety analysis by acquisition of road space information and extraction of road centerline data using LiDAR data.

  • PDF

Sustainable Road Construction Techniques with Special Emphasis on the Conservation and Restoration of Ecosystem in Japan (생태계의 보전·복원을 고려한 일본의 환경친화적 도로건설 기술 사례 연구)

  • Sung, Hyun-Chan;Moon, Da-Mi
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.6 no.4
    • /
    • pp.74-84
    • /
    • 2003
  • This study focuses on the technology to reduce destruction and damages of an ecosystem in the process of road construction. The authors investigated the ecological conservation activities and restoration technology which were applied to the construction of 2 bridges in Japan. The key results are as following : First, the most important thing in constructing eco-road was the linear design. Second, we need to adopt the environmental construction forms and materials to the design of structure. Finally, we have to use environment-friendly methods for the sake of the ecosystem at the real construction stage. Adopting those technologies has at least a few merits. First, we can achieve out goals : conservation and restoration in the local habitat. Second, we can save money instead of building a eco-bridge. There is a further advantage which makes it possible to develop environment-friendly technologies than before by drawing developers' attention.