Journal of the Korean Society of Marine Environment & Safety
/
v.23
no.3
/
pp.217-223
/
2017
In order to assess risk as a basic step for securing safety, it requires to select risk factors and determine the frequency and the severity of the consequence of each risk factor. This research adopted common risk factors among well-known maritime risk assessment models, and proposed objective criteria to gauge the risk level of each risk factor. The starting points of risk evolution were chosen for criteria according to related studies and seafarers' experience. The rate of risk appearance over the criteria is named as the incidence of risk factor. Therefore, the total risk level is expressed as the combination of incidence of each risk factor and severity. This quantitative method would be applied to measuring and comparing the risk level of target maritime zones, and it would also be useful to survey which risk factor be focused for reducing the total risk of a certain maritime zone.
Korean Journal of Construction Engineering and Management
/
v.12
no.4
/
pp.139-148
/
2011
u-City projects are different with the existing urban development projects progress via convergence with IT technology. Therefore, it inheres many risk factors more than the existing development projects as including more complexity and variety. The risk management system to systematically manage those risks which get identified and quantified is required. Especially, the planning phase that is appeared the various forms has a large effect on the success of the business. However, the management of risk factors remains in the passive form. So the problems on u-City project in the planning phase and risk factors of existing development business were analyzed for the continuous growth and the successful performance of u-City project, and those risk factors was identified and quantified by using statistical technique. In the results of it, the core risk factors were obtained through which way and the basis for the effective risk management in u-City business is provided.
Korean Journal of Construction Engineering and Management
/
v.10
no.3
/
pp.83-91
/
2009
Construction industry is a complex industry which should be invested with plenty capital, manpower and resources. Investment factors and inner and outer environmental factors should be managed systemically in terms with risk factors possible to occur. It maximizes the profit to establish construction management by managing risk systemically. While previous studies were executed with risk related to some special progress lively, studies about risk in managing construction company leave much to be desired. Therefore, this study examined risk in the whole construction management, showed the checklist and deduced the quantitative factors through questionnaire analysis from specialists. Also, priority and grade of construction management factors were evaluated by analyzing weight of construction risk factors.
Kim, Ji-Yeon;Moon, Ji-Young;Park, Jung-Kwon;Choi, Eun-Chung;Lee, Ji-Yeon
The Research Journal of the Costume Culture
/
v.18
no.1
/
pp.118-132
/
2010
The purpose of this study is to understand factors of risk perception and purchase obstruction by consumer characteristics and purchase experience of clothing in online. The collection of the research materials was progressed by online and offline. Out of 374 usable questionnaires used for examining this study, 278 questionnaires were collected from offline and 107 questionnaires were collected from online. Frequency analysis, factor analysis, reliability analysis, t-test, One-way ANOVA and multiple regression analysis using SPSS WIN 12.0 were conducted. Three factors of perceived risk were extracted: harmonic/image, quality/shopping process, payments. Based on these dimensions, ANOVA was conducted. The results indicated that the more purchasing experience people had, the less the extent of perceived risk they got, and quality/shopping process risk mostly among them. As the factors which obstruct purchasing decision, a security obstruction, a reliability obstruction, a convenient obstruction and an information insufficient obstruction are extracted. Also, the factors have got the result of same aspects as the perceived risk recognized by the Internet shopping experience. Meaningful differences between groups appear at security obstruction, reliability obstruction, and convenient obstruction. Perceived risk almost influenced on purchase obstruction when purchasing clothes in Internet shopping mall. When consumers perceiving harmony/image risk highly make decisions, they usually hesitate or abandon due to reliability obstruction, convenient obstruction. All the factors: including security obstruction, reliability obstruction, convenient obstruction and information insufficient obstruction made consumers perceiving quality/shopping process risk highly obstruct purchase decision.
It is critical to manage risks to complete IS(Information Systems) projects successfully. Identifying risk factors would be the first step for the project risk management. Previous research has discussed the issue with various points of view, such as different risk factors based on project types and roles involved in their projects. This paper empirically explored how people perceive different risk factors by project development methodology, between self-developing IS using programming language like C, Visual Basic and adapting software package already developed by software venders like ERP, CRM packages. There are researches regarding project risk factors for project management in the several point of views. And there are also researches regarding comparison between self-developing and adapting software packages methodology in IS project. However, there are no study on project risk factors comparison between self-developing IS using programming language and adapting software packages already developed by software venders in IS project. This research can be differentiated from previous ones, because it was considered both point of project risk management and development methodology in IS project. This research results implied meaningful messages to enterprise company to be planned IS projects and people who involved in IS projects. They should consider and need to prepare differently according to each development methodology for preventing project risks. It makes them reduce project risks in each case and complete successfully IS projects. Especially, if they have no experiences for implementing software packages, they can forecast the project risks and prepare them in advance.
Journal of The Korea Institute of Healthcare Architecture
/
v.30
no.3
/
pp.45-56
/
2024
Purpose: It is important to note that the relative importance of risk factors should be identified to successfully complete the remodeling project of general hospital. Approached by analytic hierarchy process (AHP), the present study aimed to systematically evaluate the risk factors for remodeling of general hospital. Methods: The present work classified the risk factors of general hospital remodeling into four major categories including the requirements survey stage, planning and design stage, dismantling and construction stage, and maintenance stage. In addition, four sub-categories were derived from each major category factor. Furthermore, five major categories and four subcategories were selected to be considered from the perspectives of two stakeholders of contractor and constructor. The relative importance of the major and sub-categories factors was calculated using the AHP technique on the survey data collected from 49 respondents who participated in the survey study. Results: The results indicate that, the risk factor of requirements survey stage was found to be the most important risk factor to consider among the four major categories of factors. Also, insufficient preliminary investigation, design inconsistencies in architecture/mechanics/electricity, occurrence of safety accidents, and insufficient review of various equipment capacities and performances were found to have the highest priorities of each subcategory factor group included in the four major categories. From the perspective of contractor, the error in predicting the construction period was found to be the most important risk factor. The occurrence of safety accidents during construction was found to be the most important risk factor to be considered by constructor. Implications: The result of the current work should provide important insights and guidelines for the risk management activity that contributes to controlling the project time, cost, and scope required for general hospital remodeling.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.418-421
/
2003
Most construction companies recognize the necessity of risk management. The practical application, however, is not easy because of the absence of systematic procedure for risk management and the difficulty in objectification of subjective risk factors. This study suggests a systematic procedure and a models. In the first place for those researches, this study analyzes the present condition of risk management in the construction industry. The developed model can be used as a risk management tool that enables evaluation of construction risk factors by quantified method, and it provides project managers with the methods to prevent risk and to deal with potential risk factors in the planning and construction phases. The results of this study could be used as references for related researches because this study attempts to develop a systematic tool for risk management including risk identification, risk analysis. risk action phases.
To improve the prognosis of mitral valve replacement surgery, analysis and evaluation of pre and intra operative risk factors will be very much valuable. Author studied 205 cases of mitral valve replacement from Feb 1982 to June 1989 for the risk factors of hospital death. 90 patients were male and 115 were female, and age was from 16 to 59 years, Mitral stenosis dominant lesions were 91 cases and regurgitation 114. Suspected risk factors were NYHA functional class, cardiothoracic ratio, implanted valve type and size, operation time, age and sex, thrombus in left atrium, atrial fibrillation, aortic cross clamping time, left ventricular end diastolic and systolic dimension, nephropathy, hepatopathy and respiratory insufficiency. Statistic analysis was performed by X2 test between survivors and death group. Statistical significances as pre and intraoperative risk factors of hospital death after mitral valve replacement were confirmed in those presence of AF on the EKG, NYHA functional class[>IV], cardiothoracic ratio[>70%], and implanted valve size[>33mm]
Purpose: The purpose of this study was to examine risk factors for sexual behaviors in Korean female high school students. Methods: Data was collected by a written questionnaire from June 22 to July 18, 2002 from 522 girls, who were stratified samples from a target population of 63,375 11th grade students from 200 regular high schools and 70 vocational high schools in Seoul, Korea. We conducted multiple regression analysis using the SAS pc+ program. Results: Risk factors for intimate behaviors were association with boy friends, differential association, family attachment, and family abuse experience. These variables cause 68% of intimate behaviors. Risk factors for sexual experiences were differential association, association with boy friend, and family attachment. These variables cause 14% of sexual experiences. Conclusion: Efforts to reduce sexual behaviors in girls should include the possible role of peers and develop peer leader programs.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.