Minhyuk Jung;Hyun-soo Lea;Moonseo Park;Bogyeong Lee
국제학술발표논문집
/
The 5th International Conference on Construction Engineering and Project Management
/
pp.397-402
/
2013
In super-tall building construction projects, schedule risk factors which vertically change and are not found in the low and middle-rise building construction influence duration of a project by vertical attribute; and it makes hard to estimate activity or overall duration of a construction project. However, the existing duration estimating methods, that are based on quantity and productivity assuming activities of the same work item have the same risk and duration regardless of operation space, are not able to consider the schedule risk factors which change by the altitude of operation space. Therefore, in order to advance accuracy of duration estimation of super-tall building projects, the degree of changes of these risk factors according to altitude should be analyzed and incorporated into a duration estimating method. This research proposes a simulation model using Monte Carlo method for estimating activity duration incorporating schedule risk factors by weather conditions in a super-tall building. The research process is as follows. Firstly, the schedule risk factors in super-tall building are identified through literature and expert reviews, and occurrence of non-working days at high altitude by weather condition is identified as one of the critical schedule risk factors. Secondly, a calculating method of the vertical distributions of the weather factors such as temperature and wind speed is analyzed through literature reviews. Then, a probability distribution of the weather factors is developed using the weather database of the past decade. Thirdly, a simulation model and algorithms for estimating non-working days and duration of each activity is developed using Monte-Carlo method. Finally, sensitivity analysis and a case study are carried out for the validation of the proposed model.
In this study, it is estimated that ceramic membrane process which can operate stably in harsh conditions replacing existing organic membrane connected with coagulation, sedimentation etc.. Jar-test was conducted by using artificial raw water containing kaolin and humic acid. It was observed that coagulant (A-PAC, 10.6%) 4mg/l is the optimal dose. As a results of evaluation of membrane single filtration process (A), coagulation-membrane filtration process (B) and coagulation-sedimentation-membrane filtration process (C), TMP variation is stable regardless of in Flux $2m^3/m^2{\cdot}day$. But in Flux $5m^3/m^2{\cdot}day$, it show change of 1-89.3 kpa by process. TMP of process (B) and (C) is increased 11.8, 0.6 kpa each. But, the (A) showed the greatest change of TMP. When evaluate (A) and (C) in Flux $10m^3/m^2{\cdot}day$, TMP of (A) stopped operation being exceeded 120 kpa in 20 minutes. On the other hand, TMP of (C) is increased only 3 kpa in 120 minutes. Through this, membrane filtration process can be operated stably by using the linkage between the pretreatment process and the ceramic membrane filtration process. Turbidity of treated water remained under 0.1 NTU regardless of flux condition and DOC and $UV_{254}$ showed a removal rate of 65-85%, 95% more each at process connected with pretreatment. Physical cleaning was carried out using water and air of 500kpa to show the recovery of pollutants formed on membrane surface by filtration. In (A) process, TMP has increased rapidly and decreased the recovery by physical cleaning as the flux rises. This means that contamination on membrane surface is irreversible fouling difficult to recover by using physical cleaning. Process (B) and (C) are observed high recovery rate of 60% more in high flux and especially recovery rate of process (B) is the highest at 95.8%. This can be judged that the coagulation flocs in the raw water formed cake layer with irreversible fouling and are favorable to physical cleaning. As a result of estimation, observe that ceramic membrane filtration connected with pretreatment improves efficiency of filtration and recovery rate of physical cleaning. And ceramic membrane which is possible to operate in the higher flux than organic membrane can be reduce the area of water purification facilities and secure a stable quantity of water by connecting the ceramic membrane with pretreatment process.
본 연구는 LH의 다가구임대주택 철거 신축사업에 대비하여 노후주택에 대한 해체공사비를 합리적 근거에 의하여 예측하는 것을 목표로 한다. 이를 위하여 소형주택 해체공사 수행 현황과 작업 프로세스를 조사하고 공사비 견적전문가 면담을 통해 해체공사비 산정실태를 파악하였다. 아울러 공공건설공사의 '예정가격 산정기준'과 '건설폐기물 처리비 산정기준', 선행연구 및 문헌을 고찰하였다. 연구 결과의 하나로 표준품셈에 기초한 해체공사 원가계산체계와 내역체계 및 관련 일위대가를 제안하고, 이를 활용하여 지상 2~3층 규모의 다가구임대주택에 대한 해체공사 예정가격을 산출하였다. 산출 결과, 1개 동당 해체공사비는 18,331천원, 바닥면적($m^2$) 기준 104천원으로 예측되었는데, 세부적으로는 직접 철거비가 14,339천원/동, 폐기물 위탁처리비는 3,992천원/동 소요될 것으로 나타났다. 연구 결과는 노후 다가구임대주택 철거 신축사업의 예산수립 단계에서 사업비 추정을 위한 기본 자료로 활용될 뿐 아니라, 연구 제안한 해체공사 원가계산체계 및 내역체계는 공공 건설공사의 발주업무에 유용하게 활용되리라 기대한다.
도시유역 하수처리장의 효율을 저감시키는 가장 큰 요인은 하수관내에 발생하는 불명수(Inflow /Infiltration, Ⅰ/Ⅰ)이다. 불명수 저감방안 수립을 위해서는 관로 개개 시설에 대한 조사를 통해 불명수 유입량을 산정해야 한다 그러나, 국내의 경우 재정적, 시간적 한계로 인해 표본조사 결과를 과업대상 전지역에 확대 적용하여 불명수 저감방안을 수 립하고 있다. 이러한 국내의 불명수 산정 방법은 사업대상 전지역의 불명수 총량에 따른 고려만 이루어질 뿐, 관로개개 시설에 대한 불명수 발생량의 고려가 이루어지지 않는 문제점을 나타낸다. 본 연구에서는 도시유역의 유출시스템에서의 불명수량 산정모형을 개발하여 관로 개개 시설에서의 불명수 발생량을 추정하여 불명수 저감방안 수립을 위한 기초자료로 활용하고자 한다. 전체 대상지역에 대한 관측 불명수량은 CCTV 및 육안조사를 통해 조사된 관거별 결함 상태에 따라 관거별로 분배된다. 이때, 결함 항목별 가중치는 AHP(Analytic Hierarchy Process) 기법을 통해 산정 하였으며, 발생 오차를 고려하기 위하여 MCS(Monte Carlo Simulation) 방법을 사용하여 불확실성 분석을 수행하였다.
중소기업청은 일정규모 이상의 공공건설사업에 대해 일반공사와 의무적으로 분리하여 직접 구매해야 하는 123개 공사용자재 제품군을 지정하고, 법에서 정한 바에 따라 발주기관이 자재를 직접 구매하여 수급인에게 공급하도록 하고 있다. 본 연구에서는 이러한 공사용자재 직접구매제도 하에서 공공아파트 건설 현장에 투입되는 지급자재가 지니는 다양한 특성과 관리요인을 발주자 입장에서 종합적으로 고려하여, 주요관리대상 자재를 파악하고, 자재 조달 프로세스를 기반으로 이들에 대한 적정 관리 방안을 제시하였다. 즉, 조달경로, 현장특화정도, 입주자 요구수준, 업체 책임범위, 납품분할정도, 현장작업 요구도, 부속자재 필요도, 검수조건 등 지급자재가 가지는 주요 관리요인을 적용하여 공공아파트 건설사업에 적용되는 43개 직접 구매 대상품목의 조달관리부담을 평가한 결과, 상대적으로 높은 조달관리노력이 요구되는 주요관리대상그룹에는 목재창호, 알루미늄창호, 승강기, 목재마루재, 레미콘, 타일, 합성수지창호가 포함되었고, 그 중 알루미늄창호와 타일은 집중관리대상으로 분류되었다. 나아가 직접구매제도의 영향에 따른 집중관리대상 자재에 대한 대응방안은 발주자 입장에서 실태, 문제점, 관리측면의 주요 고려사항을 반영하여 작성하였으며, 실질적 수량 산출, 명확한 발주세부조건 정비, 생산 전후 활동 활성화, 하자보수 물량 확보, 공종별 간섭 사전 협의 및 해소 등이 필수적인 관리활동으로 나타났다.
Rainwater has been used in many countries as a way of minimizing water availability problems. Rainwater harvesting system (RHS) has been successfully implemented as alternative water supply sources even in Korea. Although RHS is an effective alternative to water supply, its efficiency is often heavily influenced by temporal distribution of rainfall. Since natural precipitation is a random process and has probabilistic characteristics, it will be more appropriate to describe these probabilistic features of rainfall and its relationship with design storage capacity as well as supply deficit of RHS. This study presents the methodology to establish the relationships between storage capacities and deficit rates using probability distributions. In this study, the real three-story building was considered and nine scenaries were developed because the daily water usage pattern of the study one was not identified. GEV, Gumbel and the generalized logistic distribution ware selected according to the results of Kolmogorov-Smirnov test and Chi-Squared test. As a result, a set of curves describing the relationships under different exceedance probabilities were generated as references to RHS storage design. In case of the study building, the deficit rate becomes larger as return period increases and will not increase any more if the storage capacity becomes the appropriate quantity. The uncertainties between design storage and the deficit can be more understood through this study on the probabilistic relationships between storage capacities and deficit rates.
The cement industry is one of the energy intensive industries such as petrochemical and steel industry. The energy efficiency of cement industry is high comparing to oversea's cement industries due to the enforcement of energy conservation policies. The purpose of this study is estimate emission factors for greenhouse gas ($CO_{2}$) in cement industry. The results of field study, quicklime contained quantity of five factories were $0.64{\sim}0.65$. Measurement emission (15,382 ton/day) is 40% higher than process emission (8,929 ton/day) on the IPCC Guidelines (1996). Add to combustion emission on the lines of IPCC Guidelines (1996) is similar to the emission of this study. The emission factor of greenhouse gas ($CO_{2}$) were as follows the emission factor between $9.01E-01{\sim}2.15E-01\;ton/ton$ for $CO_{2}$. The result of this study is higher than emission factor of IPCC (0.51) but it is similar to U.S. EPA's (0.952).
Kim, Min-Young;Kim, Min-Kyeong;Lee, Sang-Bong;Jeon, Jong-Gil
Environmental Engineering Research
/
제15권2호
/
pp.123-126
/
2010
Modeling non-point pollution across multiple scales has become an important environmental issue. As a more representative and practical approach in quantifying and qualifying surface water, a modular neural network (MNN) was implemented in this study. Two different site-scales ($1.5\;{\times}\;10^5$ and $1.62\;{\times}\;10^6\;m^2$) with the same plants, soils, and paddy field management practices, were selected. Hydrologic data (rainfall, irrigation and surface discharge) and water quality data (time-series nutrient loadings) were continuously monitored and then used for the verification of MNN performance. Correlation coefficients (R) for the results predicted from the networks versus measured values were within the range of 0.41 to 0.95. The small block could be extrapolated to the large field for the rainfall-surface drainage process. Nutrient prediction produced less favorable results due to the complex phenomena of nutrients in the drainage water. However, the feasibility of using MNN to generate improved prediction accuracy was demonstrated if more hydrologic and environmental data are provided. The study findings confirmed the estimation accuracy of the upscaling from a small-segment block to large-scale paddy field, thereby contributing to the establishment of water quality management for sustainable agriculture.
최근 많은 수의 골프장 건설로 인하여 국토의 상당면적이 원지형의 변화 또는 파괴되고 있으며 주변 생태계가 급속한 변이를 겪고 있다. 골프코스 건설을 위해서는 정밀하고 효율적인 설계를 요하지만 기존의 통상적 설계방식으로는 사업의 방대성으로 인한 설계자료의 처리에 한계를 가지고 있었다. 특히 공사 후의 경관 변화에 대한 예측이나 환경영향 저감대책에 대하여 적절한 대안을 제시할 적절한 수단이 없었다. 따라서 이러한 문제점을 해결하기 위하여 지형정보시스템(GIS)을 골프코스 설계에 적용하여 건설에 따른 물리적 영향을 최소화시킬 수 있는 친환경적인 골프코스 설계 기법개발에 대하여 연구하였다. 연구된 내용은 지형정보시스템을 기초자료입력 단계에서부터 최종 성과물 단계까지 적용시켜 전 설계과정을 전산화하며, 부수적으로 골프 경기의 기능적 효과 증대 토지이용의 적정성, 코스유지 관리의 용이성 등을 사전 검토할 수 있는 친환경적 전산설계기법을 개발 연구하였다.
When using a computer vision system for a measurement, the geometrically distorted input image usually restricts the site and size of the measuring window. A geometrically distorted image caused by the image sensing and processing hardware degrades the accuracy of the visual measurement and prohibits the arbitrary selection of the measuring scope. Therefore, an image calibration is inevitable to improve the measuring accuracy. A calibration process is usually done via four steps such as measurement, modeling, parameter estimation, and compensation. In this paper, the efficient error calibration technique of a geometrically distorted input image was developed using a neural network. After calibrating a unit pixel, the distorted image was compensated by training CMLAN(Cerebellar Model Linear Associator Network) without modeling the behavior of any system element. The input/output training pairs for the network was obtained by processing the image of the devised sampled pattern. The generalization property of the network successfully compensates the distortion errors of the untrained arbitrary pixel points on the image space. The error convergence of the trained network with respect to the network control parameters were also presented. The compensated image through the network was then post processed using a simple DDA(Digital Differential Analyzer) to avoid the pixel disconnectivity. The compensation effect was verified using known sized geometric primitives. A way to extract directly a real scaled geometric quantity of the object from the 8-directional chain coding was also devised and coded. Since the developed calibration algorithm does not require any knowledge of modeling system elements and estimating parameters, it can be applied simply to any image processing system. Furthermore, it efficiently enhances the measurement accuracy and allows the arbitrary sizing and locating of the measuring window. The applied and developed algorithms were coded as a menu driven way using MS-C language Ver. 6.0, PC VISION PLUS library functions, and VGA graphic functions.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.