• Title/Summary/Keyword: Quantity Estimate

Search Result 385, Processing Time 0.028 seconds

Vergence Control of Binocular Stereoscopic Camera Using Disparity Information

  • Kwon, Ki-Chul;Lim, Young-Tae;Kim, Nam;Song, Young-Jun;Choi, Young-Soo
    • Journal of the Optical Society of Korea
    • /
    • v.13 no.3
    • /
    • pp.379-385
    • /
    • 2009
  • The vergence control of binocular stereoscopic camera is the most essential factor for acquiring high quality stereoscopic images. In this paper, we proposed a binocular stereoscopic camera vergence control method using disparity information by the simple image processing and estimate the quantity of vergence control using the Lagrange interpolation equation. The method of extracting disparity information through image processing is as follows: first the key-object in left & right images was extracted through labeling of the central area of the image, and then a simple method was used for calculating the disparity value of the same key-object in the labeled left and right images. The vergence control method uses disparity information and keeps the convergence distance of left & right cameras and the distance of the key-object the same. According to the proposed method, variance in the distance of the key-object and application of calculated disparity information of obtained left & right images to the quadratic Lagrange interpolation equation could estimate the quantity of vergence control, which confirmed that the method of stereoscopic camera vergence control can be simplified through experiments on various key-objects and other convergence distance.

Analysis on the Application of Estimation Criteria for Construction Cost of Masonry and Demolition (돌쌓기 및 헐기 공사의 공사비산정기준 적용실태 분석)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.234-235
    • /
    • 2019
  • In the stacking and pitching items of the stone masonry and demolition process presented by 2018's standard of estimate, 7 estimating standards are presented according to the depth of masonry stone, and it is presented that the quantity per unit increases as the depth of masonry stone grows. As a result of analyzing the application status in the site, it is shown that 2 or 3 stones are mainly used according to the stone sizes regardless of the depth of masonry stone, and that as the size of the stone becomes larger, the quantity per unit decreases due to the size per square meter(㎡). Also, in most of sites, machine construction is mainly carried out by excavators with clampers attached to them. Therefore, in the 2019's application standard of estimate, it is analyzed that the size is simplified down to 3 sizes reflecting the site application status and that it is revised as a standard reflecting the result that as the stone size becomes bigger, the productivity increases.

  • PDF

A simplified algorithm for conceptual estimation of the material quantities of rubble-mound breakwaters

  • Sadeghi, Kabir;Nouban, Fatemeh
    • Ocean Systems Engineering
    • /
    • v.10 no.1
    • /
    • pp.111-129
    • /
    • 2020
  • A simplified algorithm is proposed for fast estimation of the material quantities required for the construction of rubble-mound breakwaters. The proposed algorithm is able to employ only the data available at feasibility study phase such as the maximum draught of the design ship selected to transport the cargos to the harbor despite, because at the feasibility phase, information for the planned harbor is likely to be very limited. A linear-constant waterdepth model together with a proposed section configuration for the breakwaters, which is customary for harbors, is considered to calculate the quantity of materials. The numerical simulation of the wave characteristics has been verified using the recorded wave data collected by a buoy installed near the Neka harbor in Caspian Sea waters. A case study has been also applied to four harbors to validate the proposed algorithm. The estimated weights using the proposed linear-constant and multi-linear waterdepth models were compared using the bathymetry maps and layouts of these harbors. A computer program, written in QBasic language, has been developed to simulate the wave characteristics and to estimate the material quantities needed to construct a rubble-mound breakwater. The obtained results show that taking into account the acceptable accuracies normally applied to the feasibility study and conceptual design phases, the proposed algorithm is sufficiently accurate and highly effective for the conceptual estimation of materials' quantities of breakwaters in the feasibility study phase of harbor projects.

Predicting nutrient excretion from dairy cows on smallholder farms in Indonesia using readily available farm data

  • Al Zahra, Windi;van Middelaar, Corina E.;de Boer, Imke J.M;Oosting, Simon J.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.33 no.12
    • /
    • pp.2039-2049
    • /
    • 2020
  • Objective: This study was conducted to provide models to accurately predict nitrogen (N) and phosphorus (P) excretion of dairy cows on smallholder farms in Indonesia based on readily available farm data. Methods: The generic model in this study is based on the principles of the Lucas equation, describing the relation between dry matter intake (DMI) and faecal N excretion to predict the quantity of faecal N (QFN). Excretion of urinary N and faecal P were calculated based on National Research Council recommendations for dairy cows. A farm survey was conducted to collect input parameters for the models. The data set was used to calibrate the model to predict QFN for the specific case. The model was validated by comparing the predicted quantity of faecal N with the actual quantity of faecal N (QFNACT) based on measurements, and the calibrated model was compared to the Lucas equation. The models were used to predict N and P excretion of all 144 dairy cows in the data set. Results: Our estimate of true N digestibility equalled the standard value of 92% in the original Lucas equation, whereas our estimate of metabolic faecal N was -0.60 g/100 g DMI, with the standard value being -0.61 g/100 g DMI. Results of the model validation showed that the R2 was 0.63, the MAE was 15 g/animal/d (17% from QFNACT), and the RMSE was 20 g/animal/d (22% from QFNACT). We predicted that the total N excretion of dairy cows in Indonesia was on average 197 g/animal/d, whereas P excretion was on average 56 g/animal/d. Conclusion: The proposed models can be used with reasonable accuracy to predict N and P excretion of dairy cattle on smallholder farms in Indonesia, which can contribute to improving manure management and reduce environmental issues related to nutrient losses.

Method of Quantity Data Analysis for Building Construction Cost Estimation : Focusing on Finish Work of Public Apartment Project (공사비 예측을 위한 수량기반 데이터 분석방법 : 공공 아파트 수장공사 중심으로)

  • Ji, Sae-Hyun;Park, Moon-Seo;Lee, Hyun-Soo;Seong, Ki-Hoon;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.235-243
    • /
    • 2008
  • Construction projects have unique characteristics that these may be carried out by contractors thus, cost should be estimated before execution. The importance of cost estimation and cost check has become increasingly emphasized in all phases of construction project that would be performed numerously. It is needed that owner have to estimate reasonable budget, and contractor should predict the bid price. However, there are lack of standard cost estimation method before quantity takeoff, cost analysis method, and cost database thus, the method of area cost, such as square foot method, is as used as ever in Korea. Therefore, this research suggested standard cost database structure CUBE, and analysis method of item quantity per one household categorized by area type. Whereafter, database of all item quantity of finish work has been built with 90 building cost data, and validated it's availability. In this respect, the suggested method and the findings from this research are expected to help enhancing the efficiency and productivity of cost estimation in Korea.

An Analysis of Informal Concepts of Average Found in Fifth and Sixth Graders (5, 6학년 학생들의 대표값에 대한 비형식적 개념 분석)

  • Lee Chun-Jae;Jeon Pyung-Kook
    • The Mathematical Education
    • /
    • v.45 no.3 s.114
    • /
    • pp.319-343
    • /
    • 2006
  • The purpose of this study is to investigate how fifth and sixth graders recognize average and to find out suggestions for teaching/learning methods of average by examining which difference there is depending on the way of the word problem presentation. For the this purpose, was conducted experiment study with the way of the world problem presentation set up as experimental treatment. The conclusions drawn from the results obtained in the this study were as follows : First, since students who did not learn the regular course of average had various informal concepts already, it is needed to consider handling more various concepts of average in order to enable students to expand flexible thoughts. Second, compared with fifth and sixth graders showed a wide difference in informal concepts of average depending on the way of the word problem presentation. In expect data with given average, concepts of mean as algorithm, balance point, and mode indicated similar percentage, while in estimate average with given data, the percentage of students who showed the concept of mean was very high at 67.6%. That may be because problems related to mean in the current textbooks are items of 'estimate average with given data', so in types of 'estimate average with given data', students solve questions with mean as algorithm without considering situations of problems. This result suggests that it is necessary to diversify the way of the word problem presentation even in textbooks. Third, as a result of analyzing informal concepts of average, there was significant difference in grades. In addition, the results suggested that there would be difference in the concepts of average depending on gender or attributes of discrete quantity and continuous quantity.

  • PDF

A Study on the Simplification of Quantity Calculation of Reinforcing Bar (철근 수량산출 간소화 방안)

  • Jo, Yeong-Ho;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.6
    • /
    • pp.521-527
    • /
    • 2019
  • Quantity takeoff and cost estimates in Korea are carried out in practice without any clear standards or standards. Especially, quantity takeoff of Reinforcing bar and BoQ documentation process is very complex using 2D drawings. In this study, 10 case sites were analyzed for the status of inefficient quantity takeoff and how the statement was prepared. In order to solve this problem, this study presented a method for calculating the quantity of rebars through the ratio of concrete volume for schools, offices, and apartment buildings, and analyzed the accuracy of results. In the future, it is expected that the error range can be reduced by defining the factors affecting the results and calculating the correction value for them.

A Pilot Study for Analysis of Genetic and Environmental Factors on Final Adult Height (성장에 영향을 주는 유전적.환경적 요인 분석에 대한 예비 연구)

  • Choi, Min-Hyung;Lee, Jin-Young
    • The Journal of Pediatrics of Korean Medicine
    • /
    • v.25 no.3
    • /
    • pp.57-69
    • /
    • 2011
  • Objectives: Purpose of this study is to analyze and to estimate which and how much genetic and environmental factors have affected on growth. Also, a method of final height prediction can be developed from this study results. Methods: Correlation analysis and categorical regression analysis were conducted between genetic and environmental factors correlated with the final adult height, through survey from 171 male. Results: Mid parental height, neonatal body weight, intake frequency of beef, chicken, milk, fruits and coffee, sleep quantity and quality during the elementary school and sleep quantity during the middle school have affected on the final adult height. And a regression equation with 0.494 for coefficient of determination was obtained. Conclusions: Mid-parental-height has the most affected on the final adult height. Among environmental factors, food and sleep have significantly affected, but exercise doesn't. Among foods, meal, beef, and milk intake have remarkably affected on the final height, and chicken and fruit also have affected in some degree, but coffee has affected badly. Among sleep habits, sleep quantity during the elementary school has the most affected, sleep quality during the elementary school and sleep quantity during the middle school also have affected in some degree on final height. The younger the age is, the more sleep have affected and sleep quantity have more affected than sleep quality. Neonatal weight also has remarkably affected on the final height. Through this analysis, the final adult height can be predicted using regression equation which covers 49.4% of genetic and environmental factors.

Developing An Automatic System for Quantity Taking-off Cut and Bent Re-Bar and Making a Placing Drawing (가공철근 물량산출 및 배근시공상세도 작성시스템 개발)

  • Park, Hyeon-Yong;Lee, Seung-Hyun;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.358-363
    • /
    • 2007
  • Reinforcing steel work plays an important role in terms of its structural performance or weight of construction cost for reinforced concrete structures. Precise estimation of re-bar quantity gives a basis for managing the reinforcing steel work effectively. However, the estimation process is still performed ineffectively based upon the expert's experience or manpower in spite of the advanced technology or improvement efforts. Therefore, the purpose of this research is to develop a prototype system for taking-off the quantity of reinforcing steel bars quickly and accurately in an order consistent with the specific members identified on the drawings. An estimate algorithm considering the connection, settlement and coating thickness of re-bars was suggested regarding to their replacement conditions which places more emphasis on constructibility. Also, this system produces the shop drawings automatically with the calculation results.

  • PDF

A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance (도로포장 및 유지공사 표준품셈 개정 방법에 대한 연구)

  • Jung, Dae-Kwon;Tae, Yong-Ho;Ahn, Bang-Ryul;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.11 no.1
    • /
    • pp.85-94
    • /
    • 2009
  • In cost estimation of construction, several methods including quantity-per-unit costing, job costing, unit cost estimation and lumpsum estimation are being utilized in Korea. Among them, a Quantity-per-unit Costing Method is used as a standard of cost estimation in public and private works. This paper presents the realistic job-costing method on all road construction tasks through statistical analyses with field survey data to solve the problems induced by the existing quantity-per-unit costing method. Furthermore, it was found that the newly developed job costing method is able to produce a simple costing procedure and a more actual construction cost estimation by a case study, which was performed to compare particular construction costs produced by two different methods, existing quantity-per-unit costing and newly developed job costing. These methods is compared by Case-study about sub-base. In the case of Job costing method, the estimate is shorter than the other case about 50% and can make up for the weak point about instrument in the current Standard of cost estimation. And it can be depict by Job Costing method about progress of work for using by a plan about construction management.

  • PDF