The study of development of quantitative risk assesment program for the road tunnel (도로터널 위험도 평가프로그램 개발에 관한 연구(I))

  • Yoo, Ji-Oh;Shin, Hyun-Jun;Rie, Dong-Ho
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.460-467
    • /
    • 2006
  • Some large accidents in tunnels in recent years, such as Mont Blanc, Gotthard and Tauern tunnels, have lead to an increasing attention for tunnel safety and necessity of tool for quantitative risk assesment of road tunnel. And the purpose of this study is to develop the quantitative risk assesment tool for the application of road tunnel. The objectives of this paper are as follows : (1) analyze of traffic accident rates in tunnel, (2) make out scenario for fire accidents, (3) develop the evacuation model and FED calculation model, (4) Present the results from quantitative risk assesment for the model tunnel according with the fire heat release rates and distances of cross passage.

  • PDF

Quantitative Fire Risk Assesment for the Subway Platform Types (지하철 승강장 형식에 따른 정량적 화재 위험성 평가)

  • Rie, Dong-Ho;Kim, Ha-Young
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.6 s.78
    • /
    • pp.1-6
    • /
    • 2006
  • Subway platform is divided into Side-platform type and Center-platform type. In this study does quantitative fire risk assesment of subway platform types in numerical analysis by using CFD model. From the result of this study, 1) All exhaust mode was low-end result it seems most fire risk at Side-platform station. 2) All exhaust mode was low-end result it seems most fire risk at Center-Platform station. 3) When comparing same type exhaust mode of Side-platform and Center-platform that last thing was visible $9.1{\sim}72.34%$ low-end fire risk. Center-platform is more opera-tive than Side-platform that reduce fire risk when that was same dimension and external environment. Designer look upon a fire characteristic of subway platform types when he make smoke control air volume and platform area design.

The Quantitative Risk Assessment for Railroad-tunnel Fire Incidents by using CFD code (CFD code를 이용한 철도터널 화재 위험도 평가)

  • Kim, H.B.;Lee, D.H.;Jang, Y.J.;Jung, W.S.
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.169-172
    • /
    • 2011
  • Recently, railroad long tunnels are increasing and growing longer due to topological feathers like a lot of mountain in Korea. But fire disaster of a long tunnel cause many people to injury and death. For that reason, at the early design stage of a long tunnel, risk assessment and mitigation measure of risk for satisfying tunnel safety are required. According to the railroad facility safety standard (Korean MLTM Announcement No. 2006-395), risk assessment for railroad-tunnel fire should be performed when design stage. Therefore, various methods of risk assessment for tunnel fire have been studied and applied. In the paper, QRA(Quantitative Risk Analysis) for fire risk assessment by using CFD code is presented and the usefulness of CFD is discussed.

  • PDF

A Development on the Safety Management Information System in Building Work (빌딩공사의 안전관리정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.71-77
    • /
    • 2005
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, structure, equipment finish and etc based on accident examples and investigation on actual condition in building. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

The effect of a risk factor on quantitative risk assessment in railway tunnel (철도터널에서 위험인자가 정량적 위험도 평가에 미치는 영향)

  • Yoo, Ji-Oh;Kim, Jin-Su;Rie, Dong-Ho;Shin, Hyun-Jun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.2
    • /
    • pp.117-125
    • /
    • 2015
  • Quantitative risk assessment (QRA) of railway is to create a variety of scenario and to quantify the degree of risk by a result of the product of accident frequency and accident. Quantitative risk Assessment is affected by various factors such as tunnel specifications, characteristics of the fire, and relation of smoke control and evacuation direction. So in this study, it is conducted that how the way of smoke control and the relation of smoke control and evacuation direction affect quantitative risk assessment with variables (the tunnel length (2, 3, 4, 5, 6 km) and the slope (5, 15, 25‰)). As the result, in a train fire at the double track tunnel (Area = $97m^2$), it is most efficient to evacuate to the opposite direction of smoke control regardless of the location of train in train fire. In addition, under the same condition, index risk in mechanical ventilation up to 1/10.

A study on quantitative risk assessment for railway Tunnel fire (철도터널에서 차량화재시 정량적 위험도 평가에 관한 연구)

  • Yoo, Ji-Oh;Nam, Chang-Ho;Jo, Hyeong-Je;Kim, Jong-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.4
    • /
    • pp.307-319
    • /
    • 2010
  • As we learned in Daegu subway fire accident, fire in the railway tunnel is prone to develop to large disaster due to the limitation of smoke control and smoke exhaust. In railway tunnel, in order to ensure fire safety, fire prevention and fighting systems are installed by quantitative risk assessment results. Therefore, in this research, developed the program to establish quantitative risk assessment and suggested quantitative safety assessment method including fire scenarios in railway tunnel, fire and evacuation analysis model, fatality estimate model and societal risk criteria. Moreover, this method applys to plan preventing disaster for Honam high speed railway tunnel. As results, we presented the proper distance of escape route and societal risk criteria.

The study on interval calculation of cross passage in undersea tunnel by quantitative risk assesment method (해저철도터널(목포-제주간) 화재시 정량적 위험도 평가기법에 의한 피난연결통로 적정간격산정에 관한 연구)

  • Yoo, Ji-Oh;Kim, Jin-Su;Rie, Dong-Ho;Shin, Hyun-Jun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.249-256
    • /
    • 2015
  • Quantitative Mokpo-Jeju undersea tunnel is currently on the basis plan for reviewing validation. As for the cross section shape for express boat of 105 km line, sing track two tube is being reviewed as the Euro tunnel equipped with service tunnel. Also, 10 carriage trains have been planned to operate 76 times for one way a day. So, in this study, quantitative risk assessment method is settled, which is intended to review the optimal space between evacuation connection hall of tunnel by quantitative risk analysis method. In addition to this, optimal evacuation connection hall space is calculated by the types of cross section, which are Type 3 (double track single tube), Type 1 (sing track two tube), and Type 2 (separating double track on tube with partition). As a result, cross section of Type 2 is most efficient for securing evacuation safety, and the evacuation connection space is required for 350 m in Type 1, 400 m in Type 2, and 1,500 m in Type3 to satisfy current domestic social risk assessment standard.

A Study on Semi Quantitative Risk Analysis for Air Separation Unit using a GRA(Generic Risk Analysis) Method (GRA(Generic Risk Analysis) 기법을 이용한 공기분리시설에 대한 준 정량적 위험성 평가에 관한 연구)

  • Shin, Jung-Soo;Byun, Hun-Soo
    • Journal of the Korean Institute of Gas
    • /
    • v.17 no.1
    • /
    • pp.56-66
    • /
    • 2013
  • The gas production plants supply the inert gas to production plants for maintaining safe operation and also supply combustible, flammable, explosive and toxic gases as functions of basic materials needed for producing chemical goods. In addition, gas plants need to be safe and reliable operation because they are operated under high temperature, high pressure, cryogenic and catalytic reactions. As these plants have a complex process in operation, there has been a risk that major industrial accidents such as a fire, explosion and toxic gas released, also risks of asphyxiations by inert gases and burns caused by high temperature and cryogenic substances. This study is to carry out the semi quantitative risk assesment method which is the generic risk analysis (GRA). This method is applied to air separation unit(ASU) to identify its initial risk, safety barriers, residual risk and elements important for safety(EIS). The result of this study, suggested the management tools and procedures of implementation for EIS management.

Safety Management Information System in Bridges Construction Work (교량 건설공사의 안전관리정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.5
    • /
    • pp.73-80
    • /
    • 2011
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, pier, pier upper and etc based on accident examples and investigation on actual condition in bridges construction work. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

Safety Management Information System in Plants Construction Work (플랜트 건설공사의 안전관리 정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.23-29
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.