Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log (공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화)

  • Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.109-117
    • /
    • 2023
  • Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.

Regulations on Wheelchair Power Assist Add-ons in Korea, Europe and United States (한국, 미국, 유럽의 휠체어동력보조장치 규제 현황)

  • Ki-Won Choi;Suk-Min Lee;Inhyuk Moon;Sangsoo Park
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.2
    • /
    • pp.525-531
    • /
    • 2023
  • In Korea, which is entering a super-aged society, the number of elderly patients who have difficulty walking independently is expected to increase rapidly, and it is necessary to develop wheelchair products with various functions to improve the quality of life of people with walking disabilities. Recently, wheelchair power assist devices that provide propulsion power by being attached to a manual wheelchair has been developed and is entering the domestic and global markets. In this study, we compared and analyzed the process of obtaining medical device certification for wheelchair power assist devices in Korea, the United States, and Europe. In Korea, a Class 2 medical device certification process was developed in 2021, and in the US FDA, it corresponds to Class 2 like the existing electric wheelchair and must pass the 510k certification process. In the case of Europe, it is uniquely regulated as Class I, and the CE mark can be attached through a relatively easy self-declaration of conformity. The Korean medical device industry, which is struggling with MDR certification, a new European medical device regulation, should pay attention to the relatively easy entry into the global market for wheelchair power assist products.

A Survey of Occupational Therapists' Perceptions of Telerehabilitation Dementia Prevention Education (비대면 치매 예방 교육에 대한 작업치료사의 인식 조사)

  • Kim, Min-Ji;Shin, Won-Mi;Yang, Yeong-Ae
    • Therapeutic Science for Rehabilitation
    • /
    • v.11 no.1
    • /
    • pp.35-47
    • /
    • 2022
  • Objective : In this study, we conducted a questionnaire survey of occupational therapists to examine their perceptions on and willingness to provide telerehabilitation dementia prevention education. Methods : From March 13 to 19, 2021, a questionnaire survey targeting occupational therapists in Busan, Ulsan, and Gyeongnam was conducted. 100 questionnaires were distributed but only 70 were collected. The collected data were subjected to frequency analysis and descriptive statistics using the statistical program SPSS version 23.0. Results : The average scores by region were as follows. The average compatibility score was highest at 3.92 score, intention to providing education, doctors 3.89 score, community-centric rehabilitation awareness 3.81 score, cost saving 3.78 score, perceiver usefulness 3.75 score, accessibility 3.62 score, the quality of telerehabilitation service was in order of 3.49 score. Conclusion : All items asking whether occupational therapists participate in community-centered rehabilitation and non-face-to-face dementia prevention education programs showed high scores, indicating the willingness to participate actively. In the future, in addition to follow-up research on the implementation of telerehabilitation dementia prevention education, measures for improving accessibility within the local and national government should be discussed.

Developing Integrated Transportation Service Index for Encouraging Transit-oriented Development (TOD형 개발 촉진을 위한 통합교통서비스 지표의 개발)

  • Hwang, Kee Yeon;Shin, Sang Young;Cho, Yong Hak;Sohn, Kee Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1D
    • /
    • pp.1-10
    • /
    • 2008
  • Recently, the Seoul Metropolitan Government (SMG) has initiated several urban redevelopment projects to revitalize the downtown well equipped for transit oriented development (TOD). Since, TOD should incur higher density development in our context, it has negative impacts on travel patterns, congestion, and urban environmental quality. The purpose of this study is to develop new transportation service index which can facilitate higher density TOD. This study includes relevant foreign case studies, the development of multimodal transportation index, and the impact analysis of TOD when it is applied in the downtown Seoul. In chapter III, it developed a so-called ITLOS, new multimodal transportation service index which shows the possibility of accommodating further development by integrating roadway service index with public transportation service index. The study sets ten policy scenarios by varying densities, and run the Seoul Congestion Management Model (SECOMM) to estimate the sustainable transportation impacts of TOD in the downtown. Travel speed index that only represents the availability of road capacity for development reveal that higher density development in the downtown can deteriorate traffic congestion while improving region-wide transportation level of service in Seoul. Also, it is proved that higher density development is more feasible when using ITLOS as the index because it considers not only available road capacity but subway capacity in the analysis area.

Establishment about Service Level and Evaluation Model of Bus Stop (버스 정류장의 서비스 수준 및 평가모델 구축에 관한 연구)

  • Lee, Won Gyu;Jung, Hun Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.2D
    • /
    • pp.217-225
    • /
    • 2008
  • Bus stop is necessary to improve user-focused environment to offer convenient service because of the large number of passengers. This study is to analyze user's evaluation and establishment model of the service levels at bus stop using GAP analysis, IPA and Structural equation model and suggests improvement direction of bus stop. In the GAP analysis, on thirty-one service items of bus stop, the difference appeared highly from the items such as obstacle's facility and the information related to the using bus. In the current IPA service bus operation information, cadence facility and obstacle support facility need to be improved. And in service expectation bus operation information and th exchange facility, the obstacle support facility need to be improved continuously. The evaluation model of bus stop service due to a structure equation's was fitted well by structure equation. In overall satisfaction on bus stop, the waiting satisfaction is more affect the satisfaction of bus use facility. Satisfaction in bus use facility, the related information of bus operation, cadence facility, bus operation information and trans facility, obstacle support facility is more affect compare to other items. The lower overall satisfaction in bus stop is the higher the expectation of overall satisfaction is. Therefore, the information of bus operation and the support facility for the handicapped needs an active improvement plan than ever.

Discharge Characteristics of Indicator Microorganisms from Agricultural-Forestry Watersheds (농지-임야에서 발생하는 지표미생물 유출 특성)

  • Kim, Geonha
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1B
    • /
    • pp.153-160
    • /
    • 2008
  • To estimate microbial contaminant loading discharged from diffuse sources, rainfall runoff of six rainfall events were monitored at three study watersheds of forestry and agricultural land use. Monitored indicator microorganism constituents were total coliform (TC), fecal coliform (FC), Escherichia coli (EC), and fecal streptococcus (FS). Soil loss during elevated flow rate caused higher suspended solid concentrations. Indicator microorganism concentrations were closely related with flow rate. TC event mean concentration (EMC) from unpolluted forestry was $5.3{\times}10^3CFU/100ml$, FC EMC was $1.4{\times}10^3CFU/100ml$, EC EMC was $1.1{\times}10^3CFU/100ml$, and FS EMC was $2.9{\times}10^2CFU/100ml$. From a watershed with agricultural-forestry land use, TC EMC was $1.7{\times}10^5CFU/100ml$, FC EMC was $8.5{\times}10^4CFU/100ml$, EC EMC was $8.9{\times}10^4CFU/100ml$, and FS EMC was $3.4{\times}10^4CFU/100ml$. Mixed land use of agricultural-forestry with bigger area, TC EMC was $1.9{\times}10^5CFU/100ml$, FC EMC was $9.6{\times}10^4CFU/100ml$, EC EMC was $7.0{\times}10^4CFU/100ml$, and FS EMC was $5.1{\times}10^4CFU/100ml$.

Target Reliability Indices of Static Design Methods for Driven Steel Pipe Piles in Korea (국내 항타강관말뚝 설계법의 목표 신뢰도지수)

  • Kwak, Kiseok;Huh, Jungwon;Kim, Kyung Jun;Park, Jae Hyun;Lee, Juhyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1C
    • /
    • pp.19-29
    • /
    • 2008
  • As a part of study to develop LRFD (Load and Resistance Factor Design) codes for foundation structures in Korea, reliability analyses for driven steel pipe piles are performed and the target reliability indices are selected carefully. The 58 data sets of static load tests and soil property tests conducted in the whole domestic area were collected and analyzed to determine the representative bearing capacities of the piles. The static bearing capacity formula and the Meyerhof method using N values are applied to calculate the expected design bearing capacity of the piles. The resistance bias factors were evaluated for the two static design methods by comparing the representative bearing capacities with the design values. Reliability analysis was performed by two types of advanced methods: First Order Reliability Method (FORM), and Monte Carlo Simulation (MCS) method using resistance bias factor statistics. The static bearing capacity formula exhibited relatively small variation, whereas the Meyerhof method showed relatively high inherent conservatism in the resistance bias factors. Reliability indices for safety factors in the range of 3 to 5 were evaluated respectively as 1.50~2.89 and 1.61~2.72 for both of the static bearing capacity formula and the Meyerhof method. The target reliability indices are selected as 2.0 and 2.33 for group pile case and 2.5 for single pile case, based on the reliability level of the current design practice and considering redundancy of pile group, acceptable risk level, construction quality control, and significance of individual structure.

The Role of CM for Fast track Completion of Urgent Typhoon Recovery Construction Projects - Gangwon-Do Cases - (수해복구공사 조기착공을 위한 CM의 역할 재조명 - 강원도 사례를 중심으로 -)

  • Kim, Kyoung Nam;Choi, Jae-ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.355-362
    • /
    • 2008
  • Fast track completion of urgent typhoon damage recovery construction project is becoming crucial for the prevention of the secondary damage from the next year typhoon, prompt psychological stabilization of flood sufferers, the early recovery of damaged infrastructure condition and so forth. As the recovery learning process has been continued for last consecutive typhoons and experts suggested, the keys in attaining the goals of the project (preventative, sustainable, cleaner and fast tracking development) are found to be the early contracting and improved competencies in project management especially during the design phase. It can be presumed that the former is attainable through administrative supports in the form of government guidelines, but the latter necessitates more research efforts. In this regards, this study aims to find a way how to lift up the current level of project management capability facing ever changing project mangement environment of urgent typhoon recovery project. By comparing the current level of application of government guidelines in flooded districts and analyzing the time required for each phase from design contracting to construction starting, several reformative ideas are illustrated in association with the necessity of adopting CM method in the deign phase. It is highly expected that CM application in the design phase can be an effective alternative in overcoming current limits in improving the quality of the project and prevent the delay due to the lack of expertise and professional workers in the owner side.

A Development of Optimum Operation Models for Express-Rail Systems (급행열차 도입을 통한 최적운행방안 수립에 관한 연구 - 수도권 광역 도시철도를 중심으로 -)

  • Park, Jeong-Soo;Lee, Hoon-Hee;Won, Jai-Mu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.679-686
    • /
    • 2006
  • Recently, the city railway in the Seoul Metropolitan Area (SMA) has offered a low quality of service as a passage time, because it was operated slowly. So, the people who live in modern society are not satisfied about passage time, therefore, this study tried to make that the subway in the SMA becomes a more functional and effective wide-area-transportation-network through an express train introduction's method which examined cases from abroad and current system. and then presented how express train could be applied to current system. In a case study, We used the An-San Line and Su-In Line as a examples and developed a schedule which can minimize the delaying time of subway by using Branch & Bound Algorithm. The train operational plan was loaded to consider a railroad siding, Obtained site, and the dispatch interval(three to ten minutes) for the express and local lines and finally, We presented an alternative operational plan which made by those factors.

Exploring Delays of The Mega Construction Project: The Case of Korea High Speed Railway (대형 건설사업의 공기지연분석: 경부고속철도 건설사업을 중심으로)

  • Han, Seung Heon;Yun, Sung Min;Lee, Sang Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.839-848
    • /
    • 2006
  • Korea has become the 5th country to own and operate the high speed railroad in 2004. However, there were many difficulties until Koreans enjoy the first bullet train service with the average hourly speed of 300km. The high speed railroad requires elevated quality standards differently from the traditional railways. In addition to the technical difficulties, the construction project itself was an unpleasant case with huge delays and cost overruns mainly due to the lack of experiences, deficiency of owner$^{\circ}{\O}$s role, and increase of public resistances triggered by environmental concerns. This paper analyzes the reasons for delays on this mega-project. With respect to the characteristics of the whole project level, it is very complicated/linear project, whose total length is around 412 km with the composition of various sections in the route of the railway which have basically different conditions. For that reason, the analysis is performed in both macro and micro level. First, macroscopic analysis is performed to find critical subdivisions in the railway route that induces the significant delay in the opening due date. Then, microscopic analysis is followed to quantify the causes and effects of delays focused on these critical subdivisions in more detailed way. Finally, this paper provides lessons learned from this project to avoid the decisive delays in performing the similar large-scaled projects.