• Title/Summary/Keyword: Quality assurance systems

Search Result 303, Processing Time 0.03 seconds

Success Factors of Highway Construction Projects in Egypt: AHP Approach

  • El-Maaty, Ahmed Ebrahim Abu;El-Hamrawy, Saad;Akal, Ahmed Yousry
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.7-14
    • /
    • 2016
  • While the idea of the existence of a set of key factors for success in planning, designing and construction of projects is not new, it remains one of the most important issues in the field of construction management. This is due to project success factors are inputs to project management practice which can lead directly or indirectly to project success. This study identifies the success factors which can be used for improving the highway projects performance in Egypt during the project pre-construction and construction phases. Through a detailed literature review 35 success factors are identified. Furthermore, the AHP is adopted to prioritize the studied factors through the application of questionnaire survey. The study establishes that implementing an effective quality control and assurance systems, allow sufficient time for feasibility studies, design, drawing and tender preparation, effective cost control system and frequency of project budget updates, preparing adequate designs and drawings and determining sufficient time to implement the desired scope of work are the most important success factors for enhancing the highway projects performance in Egypt.

The Importance of Ethical Hacking Tools and Techniques in Software Development Life Cycle

  • Syed Zain ul Hassan;Saleem Zubair Ahmad
    • International Journal of Computer Science & Network Security
    • /
    • v.23 no.6
    • /
    • pp.169-175
    • /
    • 2023
  • Ethical hackers are using different tools and techniques to encounter malicious cyber-attacks generated by bad hackers. During the software development process, development teams typically bypass or ignore the security parameters of the software. Whereas, with the advent of online web-based software, security is an essential part of the software development process for implementing secure software. Security features cannot be added as additional at the end of the software deployment process, but they need to be paid attention throughout the SDLC. In that view, this paper presents a new, Ethical Hacking - Software Development Life Cycle (EH-SDLC) introducing ethical hacking processes and phases to be followed during the SDLC. Adopting these techniques in SDLC ensures that consumers find the end-product safe, secure and stable. Having a team of penetration testers as part of the SDLC process will help you avoid incurring unnecessary costs that come up after the data breach. This research work aims to discuss different operating systems and tools in order to facilitate the secure execution of the penetration tests during SDLC. Thus, it helps to improve the confidentiality, integrity, and availability of the software products.

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

Analytic Hierarchy Process for Prioritizing Radiation Safety Measures in Medical Institutions

  • Hyun Suk Kim;Heejeong Jeong;Hyungbin Moon;Sang Hyun Park
    • Journal of Radiation Protection and Research
    • /
    • v.49 no.1
    • /
    • pp.40-49
    • /
    • 2024
  • Background: This study aimed to prioritize policy measures to improve radiation safety management in medical institutions using the analytic hierarchy process. Materials and Methods: It adopted three policy options-engineering, education, and enforcement-to categorize safety management measures, the so-called Harvey's 3Es. Then, the radiation safety management measures obtained from the current system and other studies were organized into action plan categories. Using the derived model, this study surveyed 33 stakeholders of radiation safety management in medical institutions and analyzed the importance of each measure. Results and Discussion: As a result, these stakeholders generally identified enforcement as the most important factor for improving the safety management system. The study also found that radiation safety officers and medical physicists perceived different measures as important, indicating clear differences in opinions among stakeholders, especially in improving quality assurance in radiation therapy. Hence, the process of coordination and consensus is likely to be critical in improving the radiation safety management system. Conclusion: Stakeholders in the medical field consider enforcement as the most critical factor in improving their safety management systems. Specifically, the most crucial among the six specific action plans was the "reinforcement of the organization and workforce for safety management," with a relative importance of 25.7%.

Building Transparency on the Total System Performance Assessment of Radioactive Repository through the Development of the Cyber R&D Platform; Application for Development of Scenario and Input of TSPA Data through QA Procedures (Cyber R&D Platform개발을 통한 방사성폐기물 처분종합성능평가(TSPA) 투명성 증진에 관한 연구; 시나리오 도출 과정과 TSPA 데이터 입력에서의 품질보증 적용 사례)

  • Seo, Eun-Jin;Hwang, Yong-Soo;Kang, Chul-Hyung
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.4 no.1
    • /
    • pp.65-75
    • /
    • 2006
  • Transparency on the Total System Performance Assessment (TSPA) is the key issue to enhance the public acceptance for a radioactive repository. To approve it, all performances on TSPA through Quality Assurance is necessary. The integrated Cyber R&D Platform is developed by KAERI using the T2R3 principles applicable for five major steps : planning, research work, documentation, and internal & external audits in R&D's. The proposed system is implemented in the web-based system so that all participants in TSPA are able to access the system. It is composed of three sub-systems; FEAS (FEp to Assessment through Scenario development) showing systematic approach from the FEPs to Assessment methods flow chart, PAID (Performance Assessment Input Databases) being designed to easily search and review field data for TSPA and QA system containing the administrative system for QA on five key steps in R&D's in addition to approval and disapproval processes, corrective actions, and permanent record keeping. All information being recorded in QA system through T2R3 principles is integrated into Cyber R&D Platform so that every data in the system can be checked whenever necessary. Throughout the next phase R&D, Cyber R&D Platform will be connected with the assessment tool for TSPA so that it will be expected to search the whole information in one unified system.

  • PDF

The Development of Quality Assurance Program for CyberKnife (사이버나이프의 품질관리 절차서 개발)

  • Jang, Ji-Sun;Kang, Young-Nam;Shin, Dong-Oh;Kim, Moon-Chan;Yoon, Sei-Chul;Choi, Ihl-Bohng;Kim, Mi-Sook;Cho, Chul-Koo;Yoo, Seong-Yul;Kwon, Soo-Il;Lee, Dong-Han
    • Radiation Oncology Journal
    • /
    • v.24 no.3
    • /
    • pp.185-191
    • /
    • 2006
  • [ $\underline{Purpose}$ ]: Standardization quality assurance (QA) program of CyberKnife for suitable circumstances in Korea has not been established. In this research, we investigated the development of QA program for CyberKnife and evaluation of the feasibility under applications. $\underline{Materials\;and\;Methods}$: Considering the feature of constitution for systems and the therapeutic methodology of CyberKnife, the list of quality control (QC) was established and divided dependent on the each period of operations. And then all these developed QC lists were categorized into three groups such as basic QC, delivery specific QC, and patient specific QC based on the each purpose of QA. In order to verify the validity of the established QA program, this QC lists was applied to two CyberKnife centers. The acceptable tolerance was based on the undertaking inspection list from the CyberKnife manufacturer and the QC results during last three years of two CyberKnife centers in Korea. The acquired measurement results were evaluated for the analysis of the current QA status and the verification of the propriety for the developed QA program. $\underline{Results}$: The current QA status of two CyberKnife centers was evaluated from the accuracy of all measurements in relation with application of the established QA program. Each measurement result was verified having a good agreement within the acceptable tolerance limit of the developed QA program. $\underline{Conclusion}$: It is considered that the developed QA program in this research could be established the standardization of QC methods for CyberKnife and confirmed the accuracy and stability for the image-guided stereotactic radiotherapy.

Improvement of the Marine Environmental Assessment for Dredging and Ocean Disposal of Coastal Sediment in Korea (연안준설 및 준설토 해양투기 해양환경평가 개선방안)

  • Lee, Dae-In;Park, Dal-Soo;Eom, Ki-Hyuk;Kim, Gui-Young;Cho, Hyeon-Seo;Kim, Jong-Kyu;Seo, Young-Kyo;Baeck, Gun-Wook
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.3
    • /
    • pp.131-141
    • /
    • 2009
  • We studied improvement in marine environmental impact assessment and related management systems of coastal sediments that are dredged inshore but disposed offshore. After reviewing and diagnosing the existing assessment procedures and problems, we recommend to design the core assessment items and improve the reliability of assessment byenhancing the quality assurance/quality control (QA/QC) and verification processes. We proposed eco-friendly disposal plan for dredging sediment such as reuse system in land development was explored. A marine environmental database system was established to support the assessment processes. Guidelines for marine research and modelling were proposed for improving assessment of dredging and disposal of coastal sediment. Also, applying of screening and scoping for marine environmental assessment was reviewed.

Evaluation of Targeting Using Marker Seed Phantom (Maker Seed Phantom을 이용한 표적위치의 정확성 평가)

  • Jang, Eun-Sun;Jeong, Bong-Jae;Im, In-Chul;Kang, Su-Man
    • Journal of the Korean Society of Radiology
    • /
    • v.5 no.2
    • /
    • pp.67-72
    • /
    • 2011
  • Accuracy control of Linear accelerator installed in OBI is done daily and weekly and importance of accuracy multiplies exponentially at that moment. Purpose of this experiment is everyday and twice a week over a four month period (march~june) 2009 year to confirm maintenance of accuracy through Quality control of OBI. In short, measurement of exponentially multiplying accuracy of OBI and regular accuracy control was able to maintain accuracy from the center of treatment within 0.1 cm. Therefore, evaluation of exponentially multiplying accuracy using OBI accuracy control linear accelerator phantom on daily, weekly basis was confirmed.

Verification of Mechanical Leaf Gap Error and VMAT Dose Distribution on Varian VitalBeamTM Linear Accelerator

  • Kim, Myeong Soo;Choi, Chang Heon;An, Hyun Joon;Son, Jae Man;Park, So-Yeon
    • Progress in Medical Physics
    • /
    • v.29 no.2
    • /
    • pp.66-72
    • /
    • 2018
  • The proper position of a multi-leaf collimator (MLC) is essential for the quality of intensity-modulated radiation therapy (IMRT) and volumetric modulated arc radiotherapy (VMAT) dose delivery. Task Group (TG) 142 provides a quality assurance (QA) procedure for MLC position. Our study investigated the QA validation of the mechanical leaf gap measurement and the maintenance procedure. Two $VitalBeam^{TM}$ systems were evaluated to validate the acceptance of an MLC position. The dosimetric leaf gaps (DLGs) were measured for 6 MV, 6 MVFFF, 10 MV, and 15 MV photon beams. A solid water phantom was irradiated using $10{\times}10cm^2$ field size at source-to-surface distance (SSD) of 90 cm and depth of 10 cm. The portal dose image prediction (PDIP) calculation was implemented on a treatment planning system (TPS) called $Eclipse^{TM}$. A total of 20 VMAT plans were used to confirm the accuracy of dose distribution measured by an electronic portal imaging device (EPID) and those predicted by VMAT plans. The measured leaf gaps were 0.30 mm and 0.35 mm for VitalBeam 1 and 2, respectively. The DLG values decreased by an average of 6.9% and 5.9% after mechanical MLC adjustment. Although the passing rates increased slightly, by 1.5% (relative) and 1.2% (absolute) in arc 1, the average passing rates were still within the good dose delivery level (>95%). Our study shows the existence of a mechanical leaf gap error caused by a degenerated MLC motor. This can be recovered by reinitialization of MLC position on the machine control panel. Consequently, the QA procedure should be performed regularly to protect the MLC system.

The Software Reliability Evaluation of a Nuclear Controller Software Using a Fault Detection Coverage Based on the Fault Weight (가중치 기반 고장감지 커버리지 방법을 이용한 원전 제어기기 소프트웨어 신뢰도 평가)

  • Lee, Young-Jun;Lee, Jang-Soo;Kim, Young-Kuk
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.5 no.9
    • /
    • pp.275-284
    • /
    • 2016
  • The software used in the nuclear safety field has been ensured through the development, validation, safety analysis, and quality assurance activities throughout the entire process life cycle from the planning phase to the installation phase. However, this evaluation through the development and validation process needs a lot of time and money, and there are limitations to ensure that the quality is improved enough. Therefore, the effort to calculate the reliability of the software continues for a quantitative evaluation instead of a qualitative evaluation. In this paper, we propose a reliability evaluation method for the software to be used for a specific operation of the digital controller in a nuclear power plant. After injecting weighted faults in the internal space of a developed controller and calculating the ability to detect the injected faults using diagnostic software, we can evaluate the software reliability of a digital controller in a nuclear power plant.