• Title/Summary/Keyword: Quality Management Plan

Search Result 1,083, Processing Time 0.028 seconds

Rule-based Review and Automated Quality Management Process of BIM deliverables for Railway Infrastructures (철도인프라 BIM 성과물의 품질검토 절차 및 룰 기반 적용성 검토)

  • Kang, Jeon-Yong;Hasan, Syed Mobeen;Min, Ji-Sun;An, Joon-Sang;Choi, Jae-Woong
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.23-34
    • /
    • 2022
  • In the current 2D-based design, design reliability is lowered due to interference and inconsistency between plans, errors in drawings and quantities, etc. At the time of transition to BIM-based 3D design, it is necessary to expand the reliability and usability of BIM by eliminating these errors from the design stage through securing the quality of the BIM digital model. Therefore, in the railway infrastructure design stage, the quality management process and standards of the BIM digital model were defined and quality management index were developed. Based on the rule extracted from the quality management index, a pilot quality management was conducted in connection with the commercial Model-Checker rule, problems and improvement plans were derived, and a rule-based automated quality management plan was prepared.

A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works - (시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 -)

  • Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.

Sampling Plans Based on Truncated Life Test for a Generalized Inverted Exponential Distribution

  • Singh, Sukhdev;Tripathi, Yogesh Mani;Jun, Chi-Hyuck
    • Industrial Engineering and Management Systems
    • /
    • v.14 no.2
    • /
    • pp.183-195
    • /
    • 2015
  • In this paper, we propose a two-stage group acceptance sampling plan for generalized inverted exponential distribution under truncated life test. Median life is considered as a quality parameter. Design parameters are obtained to ensure that true median life is longer than a given specified life at certain level of consumer's risk and producer's risk. We also explore situations under which design parameters based on median lifetime can be used for other percentile points. Tables and specific examples are reported to explain the proposed plans. Finally a real data set is analyzed to implement the plans in practical situations and some suggestions are given.

Economic Screening Inspection Plan Under Linear Inspection Error (선형검사과오(線型檢査過誤)를 고려한 최소비용(最少費用)의 선별검사방식(選別檢査方式))

  • Kim, Gwang-Seop;Hwang, Ui-Cheol
    • Journal of Korean Society for Quality Management
    • /
    • v.16 no.2
    • /
    • pp.82-91
    • /
    • 1988
  • This study is concerned with the development of the economic sampling inspection plan when it is possible to carry out a nondestructive screening inspection for the rejected lots by substitutive characteristics closely related to the original quality characteristic. It is assumed that the probabilities of those errors depend linearly on the fraction defective of the process. The inspection policies considered are as follows: take a random sample of size n from the lot of size N and perform a destructive test on the sample. If the number of the defective items is not greater than a critical number C, accept the lot. Expected cost functions are obtained when the process average can be considered to follow a beta distribution and the way of finding the optimal values of (n, c) is to be explored.

  • PDF

Investigation and Analysis of Water Quality Environmental for Preparing a Natural Learning and Experimental Area in Bukchun and Boundary (북천지역 자연학습 체험단지 조성을 위한 수질 환경성 조사 및 분석)

  • 정종현;최석규;이종현;정덕영;이강우
    • Journal of Environmental Health Sciences
    • /
    • v.28 no.2
    • /
    • pp.11-22
    • /
    • 2002
  • This study analyzes the river system and water quality conditions of Bukchun in order to establish a basic plan for Preparing a natural learning and experimental area of environmental ecosystem in Bukchun, Gyeongju. It also tries to establish an integrated plan for water management of Bukchun stream based on water contaminants. In addition, after analysing the water quality at 13 points during the non-rainy season, the effluent of municipal wastewater was of relatively better quality with I ~ II grade, below the water quality standard of the river, except in points near Samsung apartments. However, analysing the Hyeongsangang and the effluent of Bomunho and Duckdongdam in rainy season, the water quality was II ~ III grade according to environmental standard. The water Quality of those samples was strongly dependent of non-point source.

Basic Research on Mid-to-Long-term Management Plan of Purchased Land by Evaluating Ecological Function of Waterfront Area of Geum River (금강수계 수변구역의 생태 기능 평가를 통한 매수토지 중장기 관리 방안 기초 연구)

  • Seo, Jung-young
    • Journal of Environmental Science International
    • /
    • v.28 no.3
    • /
    • pp.371-384
    • /
    • 2019
  • The purpose of this study was to propose an efficient management plan for purchased land considering the hydrological, watershed characteristics and ecological functions of the target land and surrounding area based on the result of monitoring the water quality improvement effect obtained by purchasing the land in the watershed area in the Geum river system. For this purpose, this study investigated through literature review, and examined ways to apply them to this research by deriving implications from a comprehensive analysis of previous research cases. After that, the components of assessment were derived to evaluate the ecological function of the purchase land, and the ecological function evaluation model for each land and area was proposed. In order to select purchase and restoration priorities of the land, this study analyzed the ecological status of the purchased land in main watersheds and tributaries using Arc GIS ver 10.1. Through this, a process to select restoration priorities was developed. And this study constructed the integrated management process with proposing a mid - to long - term plan by integrating the purchased land valuation and restoration priority selection process. Based on this process, this study suggested an effective management plan for purchased land through the integrated ecological management system of lands purchased. It can be used systematically in appraisal valuation, land purchase system, restoration project, and follow-up management of land purchase.

IMPROVING SOCIAL MEDIA DATA QUALITY FOR EFFECTIVE ANALYTICS: AN EMPIRICAL INVESTIGATION BASED ON E-BDMS

  • B. KARTHICK;T. MEYYAPPAN
    • Journal of applied mathematics & informatics
    • /
    • v.41 no.5
    • /
    • pp.1129-1143
    • /
    • 2023
  • Social media platforms have become an integral part of our daily lives, and they generate vast amounts of data that can be analyzed for various purposes. However, the quality of the data obtained from social media is often questionable due to factors such as noise, bias, and incompleteness. Enhancing data quality is crucial to ensure the reliability and validity of the results obtained from such data. This paper proposes an enhanced decision-making framework based on Business Decision Management Systems (BDMS) that addresses these challenges by incorporating a data quality enhancement component. The framework includes a backtracking method to improve plan failures and risk-taking abilities and a steep optimized strategy to enhance training plan and resource management, all of which contribute to improving the quality of the data. We examine the efficacy of the proposed framework through research data, which provides evidence of its ability to increase the level of effectiveness and performance by enhancing data quality. Additionally, we demonstrate the reliability of the proposed framework through simulation analysis, which includes true positive analysis, performance analysis, error analysis, and accuracy analysis. This research contributes to the field of business intelligence by providing a framework that addresses critical data quality challenges faced by organizations in decision-making environments.

The Establishment of Roles and Titles of Quality Control Personnel for Construction Project Quality Assurance (건설공사 품질확보를 위한 품질관리 관련자의 역할 및 호칭 정립)

  • Lee, Chang-Hyo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.5
    • /
    • pp.871-878
    • /
    • 2017
  • The quality control personnel of the construction work shall establish and execute the quality control plan or the quality test plan and check the qualification of the used materials according to the process, the management of the test and inspection equipment, the quality education, the own quality inspection and measures. Management and quality test of Korea and plays an important role in preventing accidents. However, related organizations did not explicitly disclose their roles in quality testing and quality control tasks while changing the names of quality control personnel to test personnel and quality managers when revising related laws and regulations and the application of labor costs. Therefore, a research of this is needed to improve conflicting situation. In this study, the ambiguous title relation to the quality control persons is improved to meet the requirements of the construction work based on related laws and regulations, and each role and title is classified as 'quality tester' and 'quality manager'. In other words, the person who carries out the quality test of the "Construction Quality Test Standard" specified in the Guideline for Quality Management of Construction Projects shall be the "Quality Tester" and the person who performs the quality control plan establishment and execution work specified in the Enforcement Rule of the Construction Technology Promotion Act shall be referred to as the 'Quality Manager'.

A Study on Mega-Y Project Innovation Activities (대형 혁신과제 추진방법에 대한 연구)

  • Sung, Su-Gyeong;Kim, Joon-Seok;Byun, Jai-Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.38 no.4
    • /
    • pp.531-539
    • /
    • 2010
  • Mega-Y project is very important for a company to gain a competitive advantage in markets or to achieve drastic change in the internal processes. It stems from the company strategy and annual management goals or key performance measures, and is proceeded by the cross-functional team. This paper presents the success factors and implementation process of the Mega-Y projects. The implementation process is presented in 5 steps, including project selection, cross-functional team building, establishment of the master plan, development and execution of sub-projects, and project completion. A case study on the cost reduction project of aircraft development is presented to help for the practitioners to deploy the implementation process introduced in this paper.

A Case Study on System Introduction Plan for Policy Quality Control of Local Government (지방자치단체 정책품질관리(PQC) 시스템도입 방안에 관한 사례연구)

  • Lee, Hong-Hee;Lee, Seung-Hee;Noh, Kyu-Sung;Cho, Jae-Wan
    • Journal of Digital Convergence
    • /
    • v.7 no.2
    • /
    • pp.13-20
    • /
    • 2009
  • Most recently, development and publication of the ordinance and the manual of policy quality management is spreading the recognition of quality control in the public sector. The purpose of this study is to introduce the system of quality control for local government's policy. So we suggested lessons drew from the case study(Daegu metropolitan city, Gumi city) on current introduction. To successfully introduce the system of quality control for local government, we have to gain agrement for the new system, of introduction, secondly prepare the new system, lastly manage PQM with flexibility.

  • PDF