• 제목/요약/키워드: Quality Improvement Action Plan

검색결과 22건 처리시간 0.019초

서비스품질을 고려한 경영혁신 지원 솔루션의 개발 (Developing a Management Improvement Supporting Solution in Consideration of Service Quality)

  • 박창순;안선응;신완선;유진성;박재우;우문규
    • 산업경영시스템학회지
    • /
    • 제31권2호
    • /
    • pp.28-35
    • /
    • 2008
  • Most organizations have recently put more emphasis on the improvement in service quality. This phenomenon could come from the recognition that service quality plays an essential role in enhancing organization's business performance. Hence this paper presents a framework for improving such service quality. The presented framework involves the methodology for (i) developing service quality indices, (ii) measuring and evaluating service quality, (iii) analyzing the level of service quality, (iv) constructing the quality improvement road map, (v) determining the quality improvement action plan. This methodology is intended to create self-sustaining improvement in service quality from the entire organization's perspective. An illustration is also given.

경남 김해지역의 대기환경개선 실천계획 수립 전후의 대기질 평가에 관한 연구 (Study on the Assessment of Air Quality Before and After Action Plan of Atmospheric Environment Improvement Establish at Gimhae, Gyeongnam Province)

  • 박종길;정우식;김석철;김은별
    • 한국환경과학회지
    • /
    • 제17권10호
    • /
    • pp.1111-1120
    • /
    • 2008
  • In order to study the degree of improved air quality as an outcome of the action plan of Atmospheric Environment Improvement in Gimhae, Gyeongnam Province, we investigated the status and trends of air pollutant before and after the plan. Nitrogen dioxide and ozone, both classified as hazardous substances, were closely monitored with particular attention. The level of sulfur dioxide, nitrogen dioxide, fine particles and ozone (but for carbon monoxide) was decreased after the plan was implemented. The number of days on which ozone exceeded the National Ambient Air Quality Standard has decreased, but the level was still often exceeded. The level of nitrogen dioxide did not surpass until the 2006 standard, but when the revised 2007 standard was implemented, it exceeded 80% of some standards. The yearly level of ozone has decreased since the plan was introduced. The concentration of nitrogen dioxide, however, has reduced in high order area while increased in low order area.

의료기관 내 자살사건의 근본원인분석과 개선전략 (Root cause analys is and improving strategy of suicidal sentinel events)

  • 임헌선;김홍순;염호기
    • 한국의료질향상학회지
    • /
    • 제19권2호
    • /
    • pp.50-64
    • /
    • 2013
  • Objectives : Suicide is a serious sentinel event in healthcare organization. Suicide and suicidal attempt are fatal and long lasting mental and physical damage to themselves, family, and medical staffs. To develope the system to prevent suicidal accident in hospital, we reviewed and analysed one case of suicidal sentinel event. Methods: The risks of suicidal sentinel event were evaluated and analysed through the root cause analysis and failure mode effects analysis. Result: We found several root causes such as initial assessment of oldest patient and security issues. Couple of action plans to fix the problems were done immediately. According to failure mode, we evaluate the risk priority number to modify the action plans. Conclusion: To reduce the risk of sentinel events, we reviewed the suicidal event and established the new system and action plan to prevent sentinel events.

건설공사(建設工事) 실무분석(實務分析)을 통한 조직관리(組織管理) 개선방안(改善方案) (The Improvement Plan of Organization Management Through the Survey of Actual Condition in Construction Work)

  • 최병주;최현;최석우;김옥규
    • 한국건축시공학회지
    • /
    • 제8권2호
    • /
    • pp.121-129
    • /
    • 2008
  • Domestic exoteric construction market by opening of world construction market with recent FTA of rapidly change. On these time, need quality increase of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of good quality. Therefore, must establish direction to inspects and must advance forward formation government official's present actual conditions for building company's QI. This study is as following if summarize studying result of formation government official to improve quality in construction spot. First, formation's CEO will for QI need side improvement the formation government official enemy by important thing. Second, at checking activity and systematic action that participate of responsible persons cooperation enterprise space-time by complete charge department organization should be achieved. Third, complete charge department for quality control operation large size construction firm substantially formation Organizational well operate, but heavy hydrogen building company was construed by greatly unprepared misgovernment. AHP analysis result complete charge department is serious necessity, and the CEO under direct control organizational structure was construed by thing which can bring excellent effect in operation management side of quality business side and formation. Therefore, heavy hydrogen building company should does to occupy competitive power high position with tissue at active quality complete charge deputy.

PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구 (A Case Study on the Quality Management of Construction Site through PDCA Cycle)

  • 백인희
    • 한국건축시공학회지
    • /
    • 제8권1호
    • /
    • pp.49-56
    • /
    • 2008
  • According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.

집합주거에 설정되는 매개영역의 계획수법에 관한 연구 (A Study on the design method of the intermediate-zone of the mu1ti-family housing)

  • 김길순;이현희
    • 한국실내디자인학회논문집
    • /
    • 제23호
    • /
    • pp.124-131
    • /
    • 2000
  • In the nowadays years our city's housing environment which progresses rapidly social-economical development is posited the role in the nowadays multi-family housing brings about the individualism of the nowadays city, and makes muddy neighborhood meaning, and the quality of the nowadays city dwelling house environment becoming worse. This study was started with the cognition of the need of intermediate-space, in the our life in the neighborhood city. Intermediate-spaces, has same meaning to come into the action of consciousness of the neighborhood. For the improvement of the quality of city housing, we should cleary recognized the individual territory after we set the proper in intermediate-zone in the multi-family housing. Therefore, this study inquires ito the meaning of intermediate-zone, and catches the formation technique of intermediate-zone and the method of plan through the investigation of the use cases of the multi-family housing which is established intermediate-territory. and then I analyze the role of the formative space by this method. By this method, I grope for the effect of the use through the alternative plan of the design method of the intermediate-zone. If the methods of play use the role in the nowadays multi-family housing, high quality will build up.

  • PDF

건설공사 실태분석을 통한 품질 및 조직관리 개선방안 (The Improvement Plan of Quality and Organization Management through the Survey of Actual Condition in Construction Work)

  • 최병주;최석우;김옥규
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.213-218
    • /
    • 2007
  • 최근 FTA체결 등 세계건설 시장의 개방으로 인한 국내외적인 주변 건설환경의 급속한 변화속에서 국제경쟁력을 갖추기 위해서는 건설업체의 품질향상을 위한 품질 및 조직관리가 중요하게 대두되고 있다. 그러므로 이에 대한 실태분석을 통하여 개선방안을 마련, 양질의 건축물을 소비자에게 제공함으로써 고객만족을 이룩할 수 있는 품질 및 조직관리 측면에서 연구가 필요하여 실시한 것이다. 품질관리를 위한 전담부서의 조직은 중소건설업체가 크게 미비함으로 인하여 전담부서가 절실히 필요한것으로 나타나 이를 개선하기 위하여 AHP분석을 통한 CEO 직속의 품질전담부서의 조직구조형태가 유지관리측면에서 비용절감효과 등 품질과 조직의 운영이 뛰어난 효과를 가져올 수 있는 것으로 분석되어, 중소건설업체에 품질전담부서를 조직하여 품질개선과 함께 경쟁력 우위를 점해야 할 것으로 사료되어 실시하였다.

  • PDF

Implementation of Real-time Integrated Platform for Producing Food Packaging Container

  • Kim, Chigon;Park, Jong-Youel;Park, Dea-Woo
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제13권1호
    • /
    • pp.194-200
    • /
    • 2021
  • This study proposes a plan to construct an integrated platform that reduces manufacturing costs and efficiently produce by integrating the systems of main producers, production subcontractors, and raw material subcontractors for the production of food packaging containers. The production plan of food packaging containers and raw materials is established in real time between the main producers, production subcontractors, and raw material subcontractors in consideration of the demand characteristics of each product. It establishes basic information that all processes from the production planning stage to the forwarding stage of the product are linked to each other. The progress of each producer of interlinked processes is shared in real-time to improve productivity and quality of food packaging containers and raw materials and reduce manufacturing costs. By monitoring the system of the main producer and the production subcontractor in real time, the production of food packaging containers is performed in a timely manner, thereby improving productivity. The application of the plan-do-check-action (PDCA) process, which includes planning, execution, evaluation and improvement in the production operation processes of the main producer, production subcontractor and raw material subcontractor, enables improved production compliance rate. The contents of the main producers, production subcontractors, and raw material subcontractors are managed in real time, then a converged production management system is established through the platform proposed in this study to ensure timely supply and demand of raw materials without delay in ordering.

Dosimetric and Radiobiological Evaluation of Dose Volume Optimizer (DVO) and Progressive Resolution Optimizer (PRO) Algorithm against Photon Optimizer on IMRT and VMAT Plan for Prostate Cancer

  • Kim, Yon-Lae;Chung, Jin-Beom;Kang, Seong-Hee;Eom, Keun-Yong;Song, Changhoon;Kim, In-Ah;Kim, Jae-Sung;Lee, Jeong-Woo
    • 한국의학물리학회지:의학물리
    • /
    • 제29권4호
    • /
    • pp.106-114
    • /
    • 2018
  • This study aimed to compare the performance of previous optimization algorithms against new a photon optimizer (PO) algorithm for intensity-modulated radiation therapy (IMRT) and volumetric modulated arc therapy (VMAT) plans for prostate cancer. Eighteen patients with prostate cancer were retrospectively selected and planned to receive 78 Gy in 39 fractions of the planning target volume (PTV). All plans for each patient optimized with the dose volume optimizer (DVO) and progressive resolution optimizer (PRO) algorithms for IMRT and VMAT were compared against plans optimized with the PO within Eclipse version 13.7. No interactive action was performed during optimization. Dosimetric and radiobiological indices for the PTV and organs at risk were analyzed. The monitor units (MU) per plan were recorded. Based on the plan quality for the target coverage, prostate IMRT and VMAT plans using the PO showed an improvement over DVO and PRO. In addition, the PO generally showed improvement in the tumor control probability for the PTV and normal tissue control probability for the rectum. From a technical perspective, the PO generated IMRT treatment plans with fewer MUs than DVO, whereas it produced slightly more MUs in the VMAT plan, compared with PRO. The PO showed over potentiality of DVO and PRO whenever available, although it led to more MUs in VMAT than PRO. Therefore, the PO has become the preferred choice for planning prostate IMRT and VMAT at our institution.

A Study on Quality Management and Assessment Model for System-Integration Organization

  • Lee, Byung Yong;Jung, Soo Il
    • 산업경영시스템학회지
    • /
    • 제24권68호
    • /
    • pp.85-94
    • /
    • 2001
  • Most of customers want to know how to develop the computer system they want to get to use according to the their requirements. This study presents a Computer Integration management System for Quality (CISQ) model for system-integration organizations, which need to demonstrate their capability to consistently provide computer integrated system that meets customer satisfaction and applicable regulatory requirements. The Plan.Do.Check.Act(PDCA) cycle called by Doming wheel expresses the basic concept of continuous improvement action in order to emphasize on achieving business goal. It is useful for providing full competence of a system-integration organization to integrate management systems based on the international management system, and to take an advantage in its market. This study specifies International Certification Network Business Excellence Concept(IBEC) approach to ensure a harmonized integration of the variety of management systems and thereby produce synergy effect. The end part of this study specifies a Assessment Model including an assessment concept adding to the compliance audit according to the CISQ for the continuous improvement. A simple application on Failure Modes and Effects Analysis(FMEA) in testing phase in project life cycle has been done.

  • PDF