갈신양수장 관개지구의 관개효율과 관개패턴분석 (Analysis of Irrigation Efficiency and Pattern in Galshin Pumping District)

  • 류범희;박승기
    • 농촌계획
    • /
    • 제26권3호
    • /
    • pp.91-102
    • /
    • 2020
  • The purpose of study was analyze the pumping characteristics, Irrigation Efficiency(IE), and irrigation pattern by period of rice growing stage with based on the performance of design irrigation water requirement and operational Galshin Pumping(GP) station in GP irrigation district constructed under rural water development project master plan. GP station was located in Yedang reservoir, Yesan-gun, Chungcheongnam-do and has been supplying irrigation water since 2006. The research data are the Irrigation Water Requirement(IWR) and the Pumping Water Amount(PWA) from 2006 to 2015 at the GP station, which is the supplied amount. The IWR were calculated using the Blaney-Criddle formula of the HOMWRS program, Hydrological Operation Model for Water Resource System, developed by Korea Rural Community Corporation. The Blaney-Criddle formula was used to calculate design irrigation water requirement of Galshin rural water development project master plan. During 2006-2015, the study period, the annual average IWR is 763.2(±149.1)mm, the annual PWA of the GP station is 397.4mm to 1,056.9mm, and those average annual PWA is 643.4(±208.4)mm. The annual IE of GP station 96.5% to 169.0%, and the average annual IE is 124.3%, which is higher than the research results conducted in other pumping stations. Analyzing the irrigation patterns of the GP irrigation district, the IWR Ratio per 10days(IWRR) and the PWA Ratio per 10days(PWAR) of the G P station were obtained. The IWRR is the percentage of IWR for each 10 days of a month to total IWR per year, and the PWAR is the percentage of PWA for each 10 days of a month to total PWA per year. The Kolmogorov- Smirnov(K-S) test results of IWRR and PWAR showed the characteristics classification by rice growing stage and stable normal distribution characteristics. Average IWRR(AIWRR) and Average PWAR(APWAR) are presented as irrigation patterns. Irrigation pattern analysis will be able to standardize comparison, analysis and probability calculation of the pumping station characteristics of different pumping stations and apply to objective evaluation of the pumping station district.

Flowra를 이용한 P신도시 지역난방 주 배관망 및 펌프장 예비 설계 및 경제성 검토 (PRELIMINARY DESIGN AND ECONOMICS CONSIDERATION OF P-NEW-CITY DISTRICT HEATING MAIN PIPES AND PUMPIG STATION)

  • 김진권
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2010년 춘계학술대회논문집
    • /
    • pp.127-128
    • /
    • 2010
  • As P-new-city is planned and constructed, district eating utilizing an existing near-by power plant's waste heat is considered as an economic and environment friendly way of providing heating to the new city. Many pipeline diameters and pumping station location and capacity were assumed, investigated and optimized, to satisfy the customers' heat demand considering common district heating pipe-network design and construction practice, and also and construction, pumping station land price and construction and the pumping energy cost during lifetime of DH systems.

  • PDF

소프트웨어 개발 방법론에 따른 양배수장 디지털 트윈 시스템 개발과정 고찰 (Exploration of Water Pumping Station Digital Twin System Development Process According to Software Development Methodologies)

  • 이병준;김난영;윤성수
    • 한국농공학회논문집
    • /
    • 제66권3호
    • /
    • pp.53-62
    • /
    • 2024
  • The purpose of this study is to examine the methodology for applying digital twin technology to pumping station, identify the factors to be determined at each stage, and present its applicability. When analyzing the requirements for developing a digital twin for pumping station, they were categorized into service requirements, IoT device requirements, and gateway requirements, with a total of 39 requirements established. In system design, it was structured according to the principles of modularity, abstraction, stepwise decomposition, and information hiding, allowing the implementation of planned items for diagnosis and operational management. There are difficulties in setting communication-related protocols and applying them in the field due to the complexity of overseeing the entire system with data. Therefore, it is necessary to clarify the purpose of the system, and there are challenges in identifying the characteristics of individual facilities, such as pumps in pumping station, and fully incorporating them into the system process. Thus, the framework of the initial design is crucial for implementing a digital twin.

JSP 공법의 시공 사례 (An Example of JSP Method)

  • 구본충
    • 기술사
    • /
    • 제37권3호
    • /
    • pp.50-53
    • /
    • 2004
  • JSP(Jumbo Super Pile) method is a foundation treatment of mixing in depth, one of the soft ground improvement methods through which settlement and deformation of ground foundation is prevented. An example of this method which is applied for the foundation design of a new drainage pumping station is Introduced, and another applied example for an existing pumping station which is built on soft foundation is also introduced.

  • PDF

서변 가압장에서 수격현상 완화에 대한 연구 (Simulation of Water Hammer Mitigation at Seobyun Pumping Station)

  • 김상현;박남식;정봉석;이동훈
    • 상하수도학회지
    • /
    • 제13권2호
    • /
    • pp.95-104
    • /
    • 1999
  • A simulation of water hammer, introduced by abruptly varied motion of a pumping machine, was performed at a one of typical pumping station in Korea. Impact of hydraulic structure such as check valve, pressure relief valve and air valve in mitigating water hammer effect was estimated gradually. Method of characteristic was employed for the effective calculation of discharge and head. The relationship between various hydraulic structures and flow was properly integrated on the base of the method of characteristic. The methodology in this approach can provide significant contribution in decision making procedure for the design of hydraulic structure at a typical pumping station in Korea.

  • PDF

직결식 변속펌프의 운전 방안에 대한 연구 (A Study on the Operating Characteristics of Variable Speed Pump for In-Line Booster Pumping Station)

  • 박종문;최성일;노형운;서상호;김상균
    • 유체기계공업학회:학술대회논문집
    • /
    • 유체기계공업학회 2001년도 유체기계 연구개발 발표회 논문집
    • /
    • pp.191-196
    • /
    • 2001
  • In the systems with largely pipe head loss, variable speed pumps are generally used because substantial energy saving can be expected from such systems by controlling pump speed and also they offer simpler maintenance and operational ease even in conditions where abrupt changes In flow rate and head can occur. The invertor or the fluid coupling system are mainly adopted to control the rotating speed. In this paper, operating conditions at Migum pressing pump station(5 stage), where the fluid coupling system was the first installed for KOWACO, are investigated and analysed so that information thus gained can be usefully employed in the efficient operation of variable speed pump in new installations of in-line booster pumping station.

  • PDF

일제하 양배수장형 수리조합에서의 양수기술과 단위용·배수량의 변천 (리뷰 논문) (Transition of Pumping Technology, Irrigation Water Requirement, and Unit Area Drainage Discharge at Pumping Station-based Irrigation Associations in South Korea during Japanese Colonial Period (in Review))

  • 김진수
    • 한국농공학회논문집
    • /
    • 제63권3호
    • /
    • pp.59-73
    • /
    • 2021
  • The purpose of this study is to investigate transition of pumping technology, irrigation water requirement, and unit area drainage discharge at the Pumping station-based Irrigation Associations (PIAs) in South Korea during Japanese colonial period (1910-1945). The PIAs established pumping stations and embankments along rivers for the purpose of irrigation, drainage and flood prevention until the mid-1920s. From the late 1920s after major river improvement projects, newly established PIAs did not include the flood prevention in their purpose of establishment. The design criteria of the irrigation and drainage projects, such as irrigation water requirements, design rainfall, and allowable ponding duration were decided according to the circumstances of PIAs. The gross irrigation water requirement of paddy fields increased from the 1920s to the 1940s, and reached the level of 0.0020 m3/s/ha (19 mm/d) in the 1940s for the fairly good irrigation status in the drought. The great floods of 1930, 1933, and 1934 triggered the increase in drainage discharge in the late 1930s, leading to the unit area drainage discharge of 0.9-2.6 m3/s/km2 for natural drainage and 0.3-1.1 m3/s/km2 for pump drainage. Therefore, several PIAs near the major rivers could avoid repetitive floods damage.

첨두강우강도를 고려한 우수관로 및 빗물펌프장의 설계용량 검토 (Study on Design Capacity of Stormwater Pipe and Pumping Station considering Peak Rainfall Intensity)

  • 정건희;심규범;김응석
    • 한국수자원학회논문집
    • /
    • 제47권9호
    • /
    • pp.777-787
    • /
    • 2014
  • 불투수지역이 대부분인 도시유역의 경우, 우수관을 통한 우수의 배제가 유출시스템의 대부분을 차지한다. 도시지역의 우수관로 및 빗물펌프장의 용량을 설계하기 위해서는 일반적으로 강우빈도해석을 통해 계산된 빈도별 강우를 Huff시간분포 등을 사용하여 일괄적으로 시간 분포시켜 유출을 계산한다. 그러나 이러한 설계는 기후변화 등으로 인해 게릴라성 호우 등이 빈번히 발생하고, 평균적인 강우강도가 증가하고 있는 현실의 불확실성을 제대로 반영하지 못한다. 그러므로 본 연구에서는 설계강우사상의 첨두강우강도가 가지는 불확실성을 분석하기 위해, 설계강우사상을 시간 분포시키는 대표적인 방법이며, 실제 본 연구의 적용지역인 가산1빗물펌프장의 설계에 사용된 Huff 2분위 방법과 과거 발생한 실제 강우사상들을 이용한 유출해석을 실시하였다. 그 결과, 유역 내 지체효과가 거의 없는 도시지역의 경우에는 총강우량보다는 첨두강우강도에 의해 유역 내 홍수가 유발된다는 것을 확인하였고, 이를 입증하기 위해 회귀분석을 수행하였다. 즉, 총강우량이 같다고 하더라도, 첨두강우강도에 따라 상류 우수관의 범람이 야기될 수 있으며, 이러한 현상은 같은 빈도의 설계강우량이라고 해도 지속시간이 짧은 경우에 더 큰 첨두강우강도를 가지므로 더욱 두드러졌다. 이것을 본 연구에서는 설계강우사상를 시간분포시킴에 의해 야기되는 첨두강우강도의 불확실성이라고 정의하고, 이에 대한 정량화 및 고려가 도시지역의 유출시스템 설계 시 고려되어야 함을 제안하였다.

기후변화 대응을 위한 양수장의 농업가뭄 취약성 실태 평가 (Assessing Vulnerability to Agricultural Drought of Pumping Stations for Preparing Climate Change)

  • 장민원;김수진;배승종;유승환;정경훈;황세운
    • 한국농공학회논문집
    • /
    • 제61권6호
    • /
    • pp.31-40
    • /
    • 2019
  • In order to implement practical alternatives to proactively cope with the agricultural drought, the potential vulnerability of irrigation pumping stations to agricultural drought was quantitatively evaluated. Data for the 124 pumping stations which are correlatable to the three proxy variables, i.e. exposure, sensitivity, and adaptive capacity was collected by the Korea Rural Community Corporation, and then standardized considering distribution of each data set. Finally, the vulnerability index was calculated by multiplying the weights determined by the expert survey. The results showed that the vulnerability index ranged from 0.709 to 0.331 and the most vulnerable pumping stations such as Judam, Wongoo and Jinahn were mostly located in Gyeongbuk province likely because of the climatological characteristics with high temperature and low rainfall around this area. In addition, it was found that the adaptive capacity was a dominant factor comparing to exposure or sensitivity proxy variables in contributing to the vulnerability. It is therefore recommended that more practical alternatives should be employed to effectively reduce the vulnerability of an individual pumping station to agricultural drought. Furthermore, the corresponding data related to adaptive capacity should be systematically organized and managed at a field level to design reliable adaptation strategies.

배수펌프장의 효율적인 운영을 위한 퍼지모형의 적용 (Application of the Fuzzy Models for the Efficient Operation of Pumping Station)

  • 김윤태;심재현;정재학;안재찬
    • 한국방재학회 논문집
    • /
    • 제4권3호
    • /
    • pp.51-60
    • /
    • 2004
  • 최근 도시지역의 수해요인은 내수침수불량에 기인하기 때문에 유수지 및 배수펌프장을 신설하여 유수지로 유입되는 유출량을 하천으로 강제배수하게 된다. 그러나 하수관거의 용량이 부족하여 유수지로 미처 유입되기 전에 하수관거의 역류로 침수피해가 자주 발생하고 있다. 따라서 본 연구에서는 도시 내배수 체계의 조사방법을 제시, 하수관거의 위험도를 평가하고 개선할 수 있는 방안을 제시하였다. 또한 배수펌프의 가동대수를 단순한 수위기준에서 변화시켜 실무에서 전문가가 아니더라도 사용할 수 있는 전산모형 8개를 개발하여 제시하였고, 지속기간, 설계빈도, 시간분포 등을 변화시켜 유수지 수위의 적정 조절여부를 검토하였다. 그리고 강제적인 배수에 의해 하류부의 수위영향이 예견되기 때문에 해당 유역의 수위를 안전하게 유지하면서도 하류부에 수위영향을 최소화할 수 있는 방안에 대해서도 검토하였다. 연구결과 Fuzzy 모형이 기존의 운영방법보다 더 효과적으로 유수지의 수위를 저하시킬 수 있었으며, 하류부 수위는 약 8cm 정도 감소시킬 수 있었다.