• Title/Summary/Keyword: Pump Selection

Search Result 77, Processing Time 0.023 seconds

Performance Prediction of Single(Double) Suction Centrifugal Pumps (단 (양) 흡입형 원심 펌프의 성능 예측)

  • 오형우;정명균
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.5 no.6
    • /
    • pp.103-110
    • /
    • 1997
  • A performance prediction method is presented for single(double) suction centrifugal pumps with a review of loss correlations given in the previous open literature. Most of the loss analyses mentioned in the present study are one dimensional and this paper investigates several modeling schemes and shows that a fairly good prediction can be achieved by a proper selection of the most important flow parameters resulting from a mean streamline analysis. Predictions of the trends of total head- capacity and pump efficiency-capacity curves agree well with the experimental data in almost the full range of operating conditions. The prediction method developed through this study can serve as a tool to ensure good matching between parts and it can assist the understanding of the operational characteristics of general purpose centrifugal pumps.

  • PDF

Fluid-Dynamic Study for the Chemical Cleaning of Young-Heung Thermal Power Plant Boiler Pipelines (영흥화력발전소 보일러배관 화학세정을 위한 유동검토)

  • Kim, Jin-Kwon;Kang, Shin-Hyoung
    • 유체기계공업학회:학술대회논문집
    • /
    • 2004.12a
    • /
    • pp.665-672
    • /
    • 2004
  • Chemical cleaning of boiler pipelines is necessary before the commissioning of thermal power plant after many years of construction. Fluid-Dynamic study for the chemical cleaning of boiler piplelines in Young-Heung thermal power plant is carried out. First, flow velocity necessary to sustain and exhaust solid particles in the vertical pipelines is calculated. Second, the flowrate necessary to make the calculated velocities in each vertical pipelines is calculated. Third, all the pipelines are analyzed with the Piping Systems Fluid Flow software to calculated the pressure loss in the pipelines. Finally, the operating point of the applied pump is calculated with the help of the same software.

  • PDF

An Analysis for the Effect of ESP/gas Lift Hybrid System on Oil Productivity (전기공저펌프/가스리프트 혼합시스템이 오일 생산성에 미치는 영향 분석)

  • Lee, Hyesoo;Iranzi, Joseph;Wang, Jihoon;Son, Hanam
    • Journal of the Korean Institute of Gas
    • /
    • v.26 no.5
    • /
    • pp.1-9
    • /
    • 2022
  • Selection of a suitable artificial lift is important in terms of efficient operation and economics for oil production. In general, process of well design includes the selection of artificial lift, but the oil recovery could be enhanced by use of hybrid system combined with two types of artificial lift method according to reservoir condition for oil production. Electric submersible pump (ESP), as a presentative artificial lift method, is a manner for supplying the pressure in the lower part of oil well by using of a multi-stage centrifugal pump with an electric energy. However, there is a disadvantage that has a limit to the application period because of mechanical defection on ESP. Accordingly, it is possible to reduce the shutdown time of production well by applying the ESP/Gas lift hybrid system, which is to switch to a gas lift when an ESP is defective. This study describes the effect of ESP/gas lift hybrid system compared with ESP method for a onshore horizontal well locating in the of Permian basin, USA. As a result of study, ESP/gas lift hybrid system could make more effective productivity than ESP method. Also, we quantitatively predicted how much economic benefit would be obtained when the hybrid system was applied in the production well.

A Study on the Pump System Design Optimization for Regional Water Supply Facilities (광역상수도용 펌프의 규격 최적결정방법에 관한 연구)

  • Roh, Hyung-woon;Suh, Sang-Ho;Kim, Kyung-Yup;Kim, Sung-Won;Kim, Il-Soo;Park, Jong-Moon;Park, HeeKyung;Park, No-Suk;Lee, Bong-Joo;Lee, Jeung-Woo;Lee, Young-Bum;Lee, Young-Ho;Kim, Sang-Gyun
    • 유체기계공업학회:학술대회논문집
    • /
    • 2001.11a
    • /
    • pp.159-164
    • /
    • 2001
  • An extensive range of pumping facilities are employed in the regional water supply system in metropolitan areas, and optimization and the systematic combination of the pump facilities have direct bearing on the stability and economy of the water supply system concerned. These systems must be able to guarantee stability, efficiency and offer high reliability. Preparation of metropolitan area regional water supply system construction project must include a basic plan which takes into account the suitability of pumping facilities to be used, the environment in which facilities will be installed, man-power requirements and basic operational and management policies. This paper contains over-all analysis of the management of metropolitan area regional water supply systems and highlights the cause of Inefficiency and energy waste and puts forward a remedial plan of action. In addition, pump/motor specification programs were developed using Visual Basic to assist selection of the same.

  • PDF

Picosecond Mid-Infrared 3.8 ㎛ MgO:PPLN Optical Parametric Oscillator Laser with High Peak Power

  • Chen, Bing-Yan;Wang, Yu-Heng;Yu, Yong-Ji;Jin, Guang-Yong
    • Current Optics and Photonics
    • /
    • v.5 no.2
    • /
    • pp.186-190
    • /
    • 2021
  • In this study, a compact, picosecond, mid-infrared 3.8 ㎛ MgO:PPLN optical parametric oscillator (OPO) laser output with high peak power is realized using a master oscillator power amplifier (MOPA) 1 ㎛ solid-state laser seeded by a picosecond fiber laser as the pump source. The pump source was a 50 MHz and 10 ps fiber seed source. After AOM pulse selection and two-stage solid-state amplification, a 1,064 nm laser output with a repetition frequency of 1-2 MHz, pulse width of 9.5 ps, and a maximum average power of 20 W was achieved. Furthermore, a compact short cavity with a unsynchronized pump is adopted through the design of an OPO cavity structure. When the injection pump power was 15 W and the repetition frequency was 1 MHz, the average output power of idler light was 1.19 W, and the corresponding peak power was 119 kW. The optical conversion efficiency was 7.93%. When the repetition frequency was increased to 2 MHz, the average output power of idler light was 1.63 W, the corresponding peak power was 81.5 kW, and the optical conversion efficiency was 10.87%. At the same time, the output wavelength was measured at 3,806 nm, and the beam quality was MX2 = 3.21 and MY2 = 3.34.

Graft Strategy for Coronary Artery Bypass Grafting in Patients with Severe Left Ventricular Dysfunction

  • Hong, Tae Hee;Ha, You Jin;Jeong, Dong Seop;Kim, Wook Sung;Lee, Young Tak
    • Journal of Chest Surgery
    • /
    • v.52 no.1
    • /
    • pp.16-24
    • /
    • 2019
  • Background: Optimal graft selection for coronary artery bypass grafting (CABG) in patients with severe left ventricular (LV) dysfunction remains debatable. We report an analysis of our experiences of isolated CABG in patients with severe LV dysfunction and the impact of graft strategy on long-term outcomes. Methods: We analyzed 209 patients with severe LV dysfunction (ejection fraction [EF] <30%) who underwent primary isolated CABG. Of these, 169 were revascularized with a bilateral internal thoracic arterial (ITA) graft (BITA group) and 40 were revascularized with a single ITA graft (SITA group). The mean follow-up duration was $22{\pm}32$ months. Results: There were 18 early deaths (8.6%). Overall survival at 5 years was 66.7%. The rate of freedom from cardiac-related death at 5 years was 74.1%, and was significantly higher in patients who underwent off-pump CABG (p=0.005) and in the BITA group (p=0.023). Multivariate analysis demonstrated that old age (hazard ratio [HR], 2.548; 95% confidence interval [CI], 1.134-5.762; p=0.024), off-pump CABG (HR, 0.245; 95% CI, 0.090-0.661; p=0.006), and BITA grafts (HR, 0.333; 95% CI, 0.146-0.757; p=0.009) were correlated with cardiac mortality. Conclusion: CABG in patients with severe LV dysfunction (EF <30%) showed reasonable long-term outcomes. The rate of freedom from cardiac-related death was significantly higher in patients who underwent off-pump CABG and in the BITA group. Off-pump BITA grafting strategies can be accepted as a viable primary option in patients with severe LV dysfunction if performed by an experienced surgeon.

Patient-Controlled Sedation for Dental Treatment (치과치료를 위한 진정자가조절법)

  • Seo, Kwang-Suk
    • Journal of The Korean Dental Society of Anesthesiology
    • /
    • v.13 no.3
    • /
    • pp.81-87
    • /
    • 2013
  • This article discusses the issues of benefit and possibility of application of patient-controlled sedation (PCS) for the dental treatment. The purpose of administering PCS for patients is to diminish anxiety and to provide cooperative and effective dental treatment. But there are a lot of barriers to application of PCS such as knowledge about pharmacokinetics of sedatives, expensive high speed and patient-controllable syringe pump, and well educated sedationist. And there could be risk of deep sedation, airway obstruction and hypoxic brain damages, etc. In order to decrease incidence of complication, appropriate drug selection, selection of right bolus dose, lock-out time is much important.

A Study on the Transition & Expectation through Survey for Existing Building and Engineer's Opinion (기존 사무소 건물 및 설비전문가 조사를 통한 설비시스템의 변화와 전망에 대한 연구)

  • Lee, Gwan-Ho;Kim, Nam-Gyu;Park, Jin-Chul;Rhee, Eon-Ku
    • Journal of the Korean Solar Energy Society
    • /
    • v.25 no.2
    • /
    • pp.63-69
    • /
    • 2005
  • This study is the survey of a transition procedure of building services systems(heat source, HVAC, water supply) through the survey of existing office buildings, building design documents. The preference & major consideration of system selection is the engineer's opinions. The results of this survey can be used in selection of building services system design. In this survey, "Hot & cold water generator system" and "single duct CAV+FCU system", "Elevated water tank system" are selected. The most important consideration in system selection is the energy saving in heat source system, and comfort in HVAC system, and water pressure in water supply system. They prefer "steam boiler+absorption chiller system" for heat source system, "steam boiler+ice thermal storage system", "hot & cold water generator system", "district heating+absorption chiller system" : "single duct CAV+FCU system" and "single duct VAV+convector system" for HVAC system: and "booster pump system" for water supply system.

The Economic Comparison of EHP and GHP for Medium Capacity Air-conditioning (중용량 공조에서 EHP와 GHP의 경제성 비교)

  • Kim, Young-Il
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.20 no.3
    • /
    • pp.167-174
    • /
    • 2008
  • Cost related to building equipment accounts for about 85% of the life cycle cost of buildings. Therefore proper selection of air-conditioning system is important for reducing the overall cost of buildings. In this study, medium capacity EHP and GHP for air-conditioning a building with a floor area of 1,200 $m^2$ are compared economically. To consider all the factors of initial and operation costs effectively, an annual equal payment method is proposed. For the initial cost, cost of equipment, construction, installation, electric facility, financial subsidy and tax cut is considered. Cost of basic electricity, energy(electricity and gas), space charge, labor, insurance and repair is considered for the operation cost. Under the assumptions made in this study, overall cost of EHP is less than that of GHP, but this is not absolute and different outcome may result if different assumptions are made. This study is useful for those who are interested in choosing an air-conditioning system that costs less for mid-size buildings with simple calculations.

A method for Application of Hybrid Geothermal Cooling-Heating System in Multi Family Apartment (공동주택용 하이브리드 지열 냉난방 시스템의 적용추진 전략)

  • Park, Yong-Boo;Park, Jong-Bae;Kim, Gil-Tae
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1447-1454
    • /
    • 2009
  • Currently, geothermal heat pump systems are being installed in new official and commercial building, welfare facilities, and school but there are a few cases for the housing heat sink in Korea. The reason is that there are no progressive taxes for the household electrical use, no actual output for the application of geothermal technology, high initial investment. For the overall use in multi family apartment such as the Green Home etc, technology development and building of the relevant research team need to be done through preliminary study. Core subjects for overall use include cooling heating load estimation for the multi family apartment, economical efficiency of the geothermal cooling and heating system, design and construction technology of the geothermal cooling and heating system for the multi family apartment, commercialization plan, and state of the art analysis. Selection of the detailed subjects with respect to core subject, driving schedule and commercialization plan, driving system, presentation of the utilization plan.

  • PDF