• 제목/요약/키워드: Pump/Turbine and Generator /Motor

검색결과 5건 처리시간 0.019초

양수발전소용 펌프수차${\cdot}$발전기 전동기 축계의 진동해석 (Vibration Analysis of Pump/Turbine and Generator/Motor Rotor System for Pumped Storage Power Stations)

  • 양보석;최병근;김용한;하현천
    • 한국유체기계학회 논문집
    • /
    • 제2권2호
    • /
    • pp.39-45
    • /
    • 1999
  • Pumped-storage power plants pumps the water from the lower reservoir to the upper reservoir using the extra electric power at night and generates electric power in the daytime. Currently it tends to be a high-head large-capacity machine. In this paper, we developed the computer programs for vibration analysis of the pump/turbine and generator/motor rotor system considering electromagnetic force, hydrodynamic unbalance force, dynamic characteristics of guide bearings and add mass of water. This program was verified by applying it to the real model and calculating the critical speed, natural mode and unbalance response.

  • PDF

순간 정전시 펌프 구동용 유도전동기의 발전 동작에 관한 연구 (Study on the Generating Operations of the Induction Motor for Driving the Pump During Instantaneous Power Interruption)

  • 김종겸
    • 조명전기설비학회논문지
    • /
    • 제30권2호
    • /
    • pp.65-70
    • /
    • 2016
  • Power interruption is a phenomenon that no voltage is displayed over a short time or long time. Most devices will not operate normally when the supply voltage is low or does not exist. However, the device can also be operated with a different power which is ensured by a separate power generation. Recently, power interruption has been reduced gradually by the improvement of electricity quality, its duration also has been very short. Induction motors are widely used for the pumping in the water and sewage facilities and power plant applications. The pump is used as a machine for moving the fluid in the high place from a low location. So pump equipment always have a potential energy. If a momentary interruption occurs, the potential energy of the pump is reversed as that of water turbine and motor is operated as generator. This study is an analysis for the voltage variation, current, torque and power flow by the generating operation of the induction motor before and after the change of momentary interruption.

50kW급 로켓 엔진용 전기펌프 모터의 개념 설계 (Conceptual Design of Electric-Pump Motor for 50kW Rocket Engine)

  • 김홍교;곽현덕;최창호;김정
    • 한국항공우주학회지
    • /
    • 제46권2호
    • /
    • pp.175-181
    • /
    • 2018
  • 전기펌프시스템은 기존 터보펌프의 가스발생기, 구동기 및 터빈이 필요 없는 매우 간결한 구조를 갖고 있어 저가 소형 위성 발사체의 차세대 추진기관으로써 최근 주목받고 있다. 그래서 본 논문에서는 로켓엔진용 전기펌프 시스템의 가장 중요한 핵심부품인 영구자석 동기모터(PMSM)의 개발 및 발사체로의 적용 가능성을 파악하기 위하여 50 kW, 50,000 RPM의 성능을 가지는 전기모터에 대한 개념설계안을 도출하였다. 요구되는 전기모터의 성능을 만족시키기 위해서 전자기장해석을 수행하여 모터의 전체 외경과 회전자의 내경을 결정하였으며, 회전자는 4,000 가우스의 Sm2Co17 원통형 자석을 이용하여 Inconel 718 재료의 캔으로 체결하였다. 또한, 엔진구동시 모터 운전 영역에서의 회전 동역학적 안정성을 검증하기 위해서 회전체 동역학해석을 수행하였으며, Campbell 선도를 통하여 설계한 모터의 단품운전 뿐만 아니라 성능확인을 위한 Dynamo meter 운전 시에도 공진현상이 발생하지 않음을 해석적으로 확인할 수 있었다.

웨스팅하우스형 원전의 보조급수계통 설계변경 영향 평가 (A Safety Improvement for the Design Change of Westinghouse 2 Loop Auxiliary Feedwater System)

  • 나장환;배연경;이은찬
    • 한국압력기기공학회 논문집
    • /
    • 제9권1호
    • /
    • pp.15-19
    • /
    • 2013
  • The auxiliary feedwater is an important to remove the heat from the reactor core when the main feedwater system is unavailable. In most initiating events in Probabilistic Safety Assessment(PSA), the operaton of this system is required to mitigate the accidents. For one of domestic nuclear power plants, a design change of a turbine-driven auxiliary feedwater pump(TD-AFWP), pipe, and valves in the auxiliary system is implemented due to the aging related deterioration by long time operation. This change includes the replacement of the TD-AFWP, the relocation of some valves for improving the system availability, a new cross-tie line, and the installation of manual valves for maintenance. The design modification affects the PSA because the system is critical to mitigate the accidents. In this paper, the safety effect of the change of the auxiliary feedwater system is assessed with regard to the PSA view point. The results demonstrate that this change can supply the auxiliary feedwater from the TD-AFWP in the accident with the motor-driven auxiliary feedwater pump(MD-AFWP) unavailable due to test or maintenance. In addition, the change of MOV's normal position from "close" to "open" can deliver the water to steam generator in the loss of offsite power(LOOP) event. Therefore, it is confirmed that the design change of the auxiliary feedwater system reduces the total core damage frequency(CDF).

발전소 사업장의 안전교육 효과성 향상을 위한 QR Code 활용방안 연구 (A Study on the Utilization of QR Code for Improving the Effectiveness of Safety Education in Power Plant Workplaces)

  • 오명근;김영국;정경옥
    • 대한안전경영과학회지
    • /
    • 제24권2호
    • /
    • pp.33-39
    • /
    • 2022
  • In order to improve the implementation of safety and health education at the site for industrial accident prevention activities, research was conducted to minimize inconvenience and increase utilization by redesigning and developing existing education methods. To date, occupational safety and health education has been conducted without considering the general work characteristics and functional facilities (mechanical, electrical, instrumentation, chemical) of workers (mechanical: turbine, valve, pump, hydraulic system, electrical: generator, breaker, motor, etc.). In particular, plant facilities were classified as mechanical and electrical facilities to improve the methodology for industrial safety and health education for plant maintenance workers. In addition, the "One Page Education Plan" was announced as a learning case because the spread of COVID-19 infectious diseases made it impossible to reduce or control the number of people in all groups and groups. The improvement of this training method will play a major role in improving the effectiveness of safety education in power plant workplaces.