Currently, small scale sewage works are getting increase in Chung Nam Province and it is strongly required for those plants to get the information of optimized procedures and technologies. Most processes for sewage works in Korea were designed for large scale plants, so many difficulties are observed in small scale sewage works. This study was conducted to evaluate the propriety of O&M and construction cost for sewage treatment plants in Chung Nam Province. The treatment results and process stability of 32 public sewage treatment plants were also investigated. It is expected to provide optimum O&M and construction cost for future small scale sewage works and improving projects of existing plants by these results. Pollution problems caused by small scale plants are usually restricted to small areas; however, in view of the high cost per unit population, treatment requirements and alternatives have to be studied carefully. In comparison to larger plants, more pronounced and different boundary conditions such as unstable influent load, per capita costs and a large variety of feasible treatment and disposal systems were considered.
As sewerage works has become one of the major public works in Korea, the employment of advanced and more appropriate sewerage technology has become essential to improve the efficiency of sewerage works. During last 10 years, the Korean Government has made tremendous amount of investment on sewerage works so that treatment plants in 58 cities have treatment capacity which is equivalent to 52.8% of total daily sewage generation in Korea. This remarkable development, however, has heavily depended on one technology, the conventional activated sludge process as more than 95% of the existing plants employ this process, Recently, the Korean Government and local authorities have plans to introduce more appropriate sewage treatment technologies and research and development in this area has become very active. To encourage employing new and appropriate technologies, however, the proper technology evaluation and verification program for new process is needed. The public sector should play a key role in this program since the sewerage works is one of the major public works. In this paper, the technology evaluation and verification programs related with sewerage facilities in the US and Japan are briefly reviewed. The Innovatived and Alternative Technology programs which was operated by US EPA until recently and Environmental Technology Verification(ETV) program which was commenced in 1995 are introduced. The technology verification programs operated in Japan and also in Korea are also reviewed in this paper to propose a future direction for development of the appropriate evaluation and verification system.
Total organic carbon (TOC) will replace chemical oxygen demand ($COD_{Mn}$) as an effluent water quality standard in public sewage treatment works (PSTWs) from 2021 in Korea. To ensure effective control of TOC in the effluent, investigation was carried out into TOC levels and sewage treatment operation factors in five target PSTWs using anaerobic-anoxic-aerobic ($A_2O$) processes, media, membrane, and sequencing batch reactor (SBR) technologies. TOC removal efficiencies appeared to be 93-96% on average. As a fraction of TOC, biodegradable dissolved organic carbon (BDOC) was reduced from 64% in the influent to 9% in the effluent in these PSTWs. During the investigation, biological treatment processes were applied flexibly for operation factors such as HRT, SRT, MLSS, F/M ratios and BOD volume loads, based on the influent characteristics and design conditions. As a result, we suggest efficient operating conditions in PSTWs by evaluating relationships between TOC removal and operation factors.
In this study, we investigated influent and effluent water pollutants in 53 Public Sewage Treatment Works (PSTWs) where industrial wastewater or landfill leachate is combined four times for two years from 2014 to 2015. Also, we analyzed the characteristics of heavy metals and volatile organic carbons at influent and effluent of these PSTWs caused by sewage treatment combined with industrial wastewater or landfill leachate. As a result, six heavy metals such as barium, copper, iron, manganese, nickel and zinc, and four volatile organic carbons (VOCs) including phenols, di(2-)ethylhexyl phthalate (DEHP), formaldehyde and toluene were observed above detection limits in most of PSTWs. Also, it was revealed that six heavy metals such as hexavalent chromium, mercury, cadmium, chromium, nickel and selenium, and four VOCs including 1,1-dichloroethylene, vinyl chloride, naphthalene, and epichlorohydrin were observed more frequently according to precipitation. As a result of reviewing the monitoring data on "Water Quality Monitoring Networks" in lower watersheds of PSTWs, both heavy metals and VOCs were below detection limits, indicating that the effluent water had little influence on the watershed. Nevertheless for the better management of influent and effluent pollutants in PSTWs, it is necessary to establish the advanced management plans for water pollutants in PSTWs, which include a list of priority substances management, monitoring plans, and guidelines for industrial wastewater and landfill leachate combined in PSTWs.
Jeong, Dong-Hwan;Choi, In-Cheol;Cho, Yangseok;Ahn, Kyunghee;Chung, Hyen-Mi;Kwon, Ohsang;Park, Hoowon;Shin, Hyunsang;Hur, Jin
Journal of Korean Society of Water and Wastewater
/
v.28
no.6
/
pp.657-668
/
2014
Under Korea's Enforcement Decree of the Framework Act on Environmental Policy amended in 2013, total organic carbon (TOC) is newly added as water quality parameter to assess organic pollution in water and aquatic ecosystem. To meet the TOC requirement and improve quality of effluent discharged into public watershed, it is also necessary to develop standards for TOC in effluent from public sewage treatment works (PSTWs). In this study, we reviewed the characteristics and removal efficiency of TOC in influent and effluent of PSTWs. The study found that phosphorus treatment process removed not only soluble phosphorus but also a portion of TOC remaining after the secondary treatment process. TOC concentration in effluent from PSTWs operated in tandem with industrial wastewater treatment work was higher due to influx of insoluble substances from the industrial wastewater treatment work. In order to lay a foundation for the management of TOC from PSTWs, it is necessary to carry out research on TOC from different perspectives. For example, studies on the generation mechanism of TOC and the impact of TOC on drinking water resources, assessment of effluent qualities through monitoring, and development of measures to control TOC for the preservation of aquatic ecosystem are needed.
In accordance with the Watershed Sewer System Maintenance Plan enforced on February 2, 2013, the different compliance concentration of effluent limit be applied to effluent discharged from public sewage treatment works(PSTWs) in each watershed on the basis of water quality thereof. With the introduction of watershed sewer system, it is necessary to set the compliance concentration of effluent limit for PSTWs situated in the watershed, by region and PSTW size, to achieve water quality criteria for regional watersheds or target water quality under TMDL program. Watershed Environmental Agencies establish the Watershed Sewer System Maintenance Plan and set the compliance concentrations of effluent limit for PSTWs under the plan. The agencies plan to apply tougher effluent BOD concentration limits in Class I to IV areas. Effluent BOD concentration limits will be toughened from 5~10 mg/L to 3 mg/L in class II~III areas, from 10mg/L to 5mg/L in class IV areas. Uniform application of effluent BOD concentration limits to PSTWs in the watershed sewer system need to be complemented considering type of sewage treatment technology employed and watershed characteristics. Therefore, this study presents method to determine the compliance concentration of effluent limit from PSTWs in the watershed.
This year the Ministry of Environment(MOE) made a fifth amendment to the Sewerage Act, which was enacted in August 1966. The first objective of this amendment is to introduce small public sewerage system that is designed to treat wastewater produced in rural areas. Before small public sewerage system was introduced to the Act through this amendment, only urban areas were covered by public sewerage system. Because small sewerage system was introduced, wastewater generated in urban areas as well as rural areas can now be treated by public sewage treatment plants. In addition to this, some authorities on sewerage affairs were moved from the MOE to local governments by this amendment in order to enhance the power and responsibility of local governments in relation to sewerage affairs. Also, this amendment enabled local governments to entrust the authority to establish and manage sewage treatment plants to private companies, and enabled the MOE to organize an advisory committee on sewerage to review economic and technical aspects ofsewage treatment plants. This amendment went into effect September 8, 1997.
Various kinds of processes are used in the Public Sewage Treatment Works(PSTWs) in order to achieve water quality criteria and TMDL in the watershed. The performance of the existing processes at PSTWs depends on influent characteristics, effluent quality target, amount of sludge production, power cost and other factors. In present, the Selection Guideline for the Available Treatment Process of PSTWs is used for a process decision in the country. But there are some problems regarding redundancy of assessment factors and complexity of assessment procedure in the guideline. In this study, we did a test application of AHP for process selection of PSTWs, which propose is to simplify assessment factors such as pollutant removal amount, sludge generation, electricity consumption, stability of operation, convenience of maintenance, easiness of existing process application, installation cost, and operating cost concerning of environmental factors, technical factors and economical factors. According to the study, the PSTWs selection procedure guideline can be improved using application of AHP method.
In order to assess sewage treatment technology necessary to achieve water quality criteria in the watershed and to ensure best treatment technology is applied in building and expanding PSTWs when establishing the Watershed Sewer System Maintenance Plan, it is necessary to develop assessment guidelines to determinate the best treatment technologies applicable to the public sewage treatment works(PSTWs). Sewage treatment technologies such as anaerobic-anoxic-aerobic treatment process are employed at PSTWs, and treatment efficiency varies due to many factors such as how the PSTWs are operated. Therefore, analyzing assessment guideline of best available technology(BAT) using currently in USA and EU, this study presents assessment parameters for the assessment guidelines to be used in determining the best treatment technologies applicable to PSTWs. We have a plan to implement pilot assessment in preparation for the final assessment guidelines based on the results of professionals survey and to determine weighted factors and assessment parameters using analytic hierarchy process (AHP).
When abnormal taste and odor were detected in the tap water of the North-Han river watershed during the dry season in late 2011, excessive nutrients with algal growth in the Lake Uiam and weather factors were considered to be among its causes. The nutrients, in particular, originated from domestic sewage in the Chuncheon area. This study was conducted to investigate relations between the algal growth in the Lake Uiam and the contribution of nutrients from public sewage treatment works (PSTWs) in Chuncheon city, and based on this to analyze the environmental impact. Nutrients in the Lake Uiam have already been accumulated to the level of eutrophication. Even in winter, the conditions in the lake such as retention time and water temperature were favorable to boost algal growth. After phosphorus treatment processes were introduced, the PSTWs in the Lake Uiam watershed were able to reduce the total phosphorus loads by 43%. The algal concentrations in the Lake Uiam also dropped by about 7%. The nitrogen treatment efficiencies in the PSTWs, on the other hand, remained almost the same after the introduction of the phosphorus treatment processes. To solve these problems more efficiently, it is necessary to develop management strategies for the upstream area of the Lake Uiam and set plans to improve nitrogen treatment operation and management for the PSTWs in Chuncheon.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.