Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

Whole Life Performance Bid Evaluation in the Korean Public Sector

  • Park, Kenneth Sungho;Lim, Hyoung-Chul
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.682-700
    • /
    • 2012
  • Over the last several years, Korea has increasingly adopted design-build for public construction projects. There is a much greater awareness of the need to change to a system based on 'Value for Money', which is high on the government's agenda. A whole life performance bid evaluation model is proposed to aid decision makers in the selection of a design-builder. This is based on the integration of a framework using an analytic hierarchy process, as the bid awarding system is being changed from one based on the lowest price to one based on best value over the life-cycle. Key criteria such as whole life cost, service life planning and design quality are important through the key stages of the evaluation process. The model uses a systematic and holistic approach, which enables the public sector client to make better decisions in design-builder selection, which will deliver whole life benefits based on long-term cost-effectiveness.

공공부문 설계시공일괄사업의 설계VE 인센티브 적용방안 (Application of Incentive on Design VE to Public Design-Build Projects)

  • 이헌우;정재훈;김해곤;구교진;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.284-288
    • /
    • 2006
  • 건설교통부에서는 설계시공일관사업을 포함한 총공사비 100억원 이상인 모든 공사에 설계VE 적용을 의무화하고 있다. 현행 설계시공일관사업에서는 입찰을 통해 확정된 총액금액으로 설계가 진행되어 실시설계단계에서 VE의 실시 명분이 미흡한 상태이다. 그러므로 설계시공일관사업에서 설계VE을 활성화하기 위해서는 설계VE 적용 결과에 따른 절감액의 배분이 이루어져야 한다. 이에 본 연구에서는 현행 설계시공일관방식의 특성과 설계VE 적용의 문제점을 파악하고, 설계시공일관사업에서 설계VE 적용의 효과를 극대화할 수 있는 인센티브의 활용방법을 제안한다.

  • PDF

학교시설 민자 사업의 효율화 방안 -공공서비스 시설의 복합화 중심으로- (Programs for Higher Efficiency of Private Sector Investment in Educational Facilities -With Focus on Combining of Public Service Facilities-)

  • 강현빈;이재림
    • 교육녹색환경연구
    • /
    • 제8권1호
    • /
    • pp.11-22
    • /
    • 2009
  • School is a basic and the most fundamental facility of city planning just like other basic public facilities including the village office. Every plan is established on the basis of school. However, the problems such as the population reduction resulting from the nuclear family-zation and low birth rate, employment and welfare of the aged people resulting from "the old aged society", and the infant nursing and education resulting from a rapid increase of the working couples become notable and accordingly more requirements are being made. Reflecting this trend, the concept and operation system should be changed. Up to now, the BTL projects of the educational facilities are gaining a reputation of being efficient in terms of national budget running, but at the same time receiving negative reputation in terms of budget saving under the civil creativity and efficiency. Through upgrading the private sector investment projects into the BTO+BTL system and further into the BTO(Build Transfer Operate), we can accomplish the original goals of the private sector investment projects, and can make the education budget operation more efficient, and can greatly improve the education environments. However, we should not underestimate in this process that these facilities should not negatively affect the education environments. In any situation, the owners of schools are students.

  • PDF

THE KEY SUCCESS VEHICLES FOR FAST-TRACK IN PUBLIC DESIGNBUILD PROJECTS

  • Kyu-Man Cho;Kyo-Jin Koo;Chang-Taek Hyun
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1094-1099
    • /
    • 2005
  • Nowadays the Design-Build Delivery Method in public sector has been remarkably grown up in applying owing to its merits such as shortening construction duration. The Fast-Track is the wide-using method for accelerating schedule at Design-Build projects. But the public agency is in trouble to execute Fast-Track because of the lack of guideline for its process. As a result, in some cases applying Fast-Track methods, cost and construction duration are increased more than cases of non-Fast-Track projects. In this study, through the questionnaire surveys to professionals having actual implementation experiences as a construction manager, owner or general contractor, key success vehicles of Fast-Track are induced.

  • PDF

국내 설계시공일괄입찰방식 개선방안 (Improvement of the Design-Build Bidding in the Domestic Construction Industry)

  • 김수현;전민정;구교진;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.410-413
    • /
    • 2003
  • 건설시장에서 경쟁력을 강화하고 국제정책에 대응하기 위하여 설계업체와 시공업체의 협력을 장려하는 설계시공 일관입찰방식이 대두되었다. 설계시공일괄입찰방식은 공기단축, 사업비 절약, 품질 향상을 위한 전도 유망한 입찰방식이지만 국내 건설산업에서는 제도의 미비, 관계자들의 경험 및 인식부족 등으로 이러한 장점을 살리지 못하고 있다. 이에 따라 본 연구에서는 국내 공공공사 설계시공일괄입찰방식에서의 문제점을 사업비, 품질, 사업기간의 측면에서 분석하여 개선방안을 제안하고자 한다.

  • PDF

현장여건상이로 인한 클레임의 예방에 관한 연구 -공공부문의 설계$\cdot$시공일괄공사를 중심으로- (A Study on the Prevention for Differing Site Conditions Claims - Focused on Design-Build Project in Public Sector -)

  • 정명우;이화영;서용칠;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.46-53
    • /
    • 2001
  • 정부의 지속적인 사회간접시설의 건설로 많은 대형공공공사가 발주되고 있으며, 이에 따라 많은 건설 클레임이 발생되고 있으며, 그 .중에서도 현장여건상이 클레임은 발생가능성이 높은 부분이다. 특히 현장여건상이 클레임은 여타 클레임과 달리 공사 초기에 발생하여 여타의 클레임보다 큰 손실을 초래할 수 있으므로 이에 대한 예방방안의 필요성이 증대되고 있다. 본 연구는 국내의 대형공공공사 중 일괄공사계약으로 발주된 공사에서 발생한 현장여건상이 클레임의 원인을 분석하고, 향후 이러한 클레임을 예방할 수 있는 예방방안을 제시하였다. 본 연구에서 제시하고 있는 예방방안으로는 첫째 수급자의 입찰관행 개선, 둘째 수급자의 현장조사 책임한계 정립, 셋째 발주자의 면책조항 재검토 그리고 마지막으로 계약금액 조정의 유연성을 확보하기 위한 방안 등을 제시하고 있다. 또한 상기의 예방방안에 대한 단·장기적 대안도 제시했다. 이러한 예방방안들은 발주자와 수급자 사이에서 현장여건상이 클레임의 해결에 사용될 수 있을 것으로 판단된다.

  • PDF

발주방식에 따른 성능수준 평가에 관한 연구 (Evaluation on Performance Level of Design-Build and Design-Bid-Build (Focused on Bridge Construction Projects))

  • 조규만;김희욱;현창택;구교진
    • 한국건설관리학회논문집
    • /
    • 제8권2호
    • /
    • pp.75-83
    • /
    • 2007
  • 최근 국내의 설계시공일괄방식(이하, 일괄방식)은 설계시공분리방식(이하, 기타방식)에 비해 높은 초기투자비용으로 인하여, 효용성에 대한 의문이 지속되고 있다 한편 발주방식별 성능을 평가한 기존의 연구를 살펴보면, 일괄방식은 공기측면과 품질측면에서 기타방식에 비해 우수한 것으로 보고되고 있다. 비교적 정량적 평가가 가능한 공기측면의 성과와 달리, 품질 측면의 성능은 해당 시설물의 발주자와의 면담을 통하여 만족도 수준을 평가하는 정성적인 평가가 대부분이다. 따라서 이 연구에서는 기존의 연구와는 달리, 2000년 이후 일괄방식과 기타방식으로 발주된 교량계획에 대한 성능수준을 평가하기 위하여, 설계도서 중심으로 계획성, 시공성, 유지관리성 등의 측면에서 평가해 보고자 한다. 이를 통하여 실제로 발주방식별 품질 등의 성능 측면에서 발주방식별 성능수준의 차이를 도출하였다.

USE OF OUTPUT SPECIFICATIONS IN PFI HOUSING PROJECTS

  • Patrick T.I. Lam ;Albert P. C. Chan ; Akintola Akintoye ;Arshad Ali Javed
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.389-394
    • /
    • 2011
  • In many parts of the world, low cost housing used to be built and maintained by the governments, based on designs and detail specifications prepared by the public sector with construction carried out by contractors. Results vary due to differences in design standards, workmanship and property management, depending also on the neighbourhood's care of the estates and their pattern of usage. In the UK, where Private Finance Initiative (PFI) has been used for infrastructure projects, there have been successful cases of city estate being transformed by PFI. These PFI housing schemes involve new-build, refurbishment as well as facility management. Unlike traditional construction, which is based on prescriptive specifications, PFI housing is based on output specifications. A study has been undertaken to compare the two specification approaches as they are applied to housing estate. Results are enlightening and serve as good reference to cities such as Hong Kong SAR and Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.

  • PDF

설계${\cdot}$시공일괄 사업의 실시설계단계 VE적용 방안에 관한 연구 (An Application of Value Engineering to Design-Build Projects at Design Development Phase)

  • 정재진;김재현;구교진;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.294-298
    • /
    • 2003
  • 최근의 공공건설공사는 정부의 건설기술진흥기본계획에 따라 설계${\cdot}$발주가 증가되고 있는 경향이며 공사규모가 대형화, 복잡화, 다양화 되어가고 있다. 발주자의 요구조건이 점차 다양해지고 있는 것과, 설계적격 심의에 대비하여 기본설계가 과설계되어 제안되는 것은 예산낭비의 요소를 내포하고 있다. 따라서 발주자는 사업의 예산절감을 위하여 실시설계단계에서의 경제성 검토를 요구하고 있으나 현행 설계${\cdot}$시공일괄공사에서는 총액계약의 특성에 따른 계약당사자간의 입장차이고 당초 기대했던 VE적용의 효과를 거두지 못하고 있는 실정이다. 본 연구의 목적은 일괄공사에서 기본설계의 과설계 등에 대한 문제점을 해결하기 위하여 실시설계단계에서 효율적으로 VE를 적용할 수 있는 방안을 제시하는 것에 있다. 이를 위하여 일괄공사에서의 VE적용사례를 조사${\cdot}$분석하여 적용방안을 설정하였고, 설문조사에 의한 유용성검증을 통하여 VE제도 및 계약적 측면, 사업참여주체별 측면, 설계VE운용적 측면에서의 적용방안을 제안하였다.

  • PDF