• Title/Summary/Keyword: Public Projects

Search Result 1,503, Processing Time 0.026 seconds

Guidelines for Provisional Sum in Public Construction Projects (국내공공공사의 잠정금액(Provisional Sum) 집행기준)

  • Lee, Jae-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.157-165
    • /
    • 2005
  • Recently, the term 'Provisional Sum(PS)' has been used in domestic public construction projects especially for civil works. Nevertheless, the guideline for PS has not been clearly stipulated in contract documents or construction-related laws. Due to these ambiguous contract situations, disputes between owners and contractors are surely expected to settle down PS in construction projects. This paper focused on suggesting a guideline to settle down PS in these ambiguous contract situations. The guideline suggested in the paper is expected to be used as a reasonable method to settle down PS avoiding nonproductive disputes about PS in construction projects

A Study on Institutional Types of Residents Support Project for the Vitalization of Locating Locally Unwanted Land Uses in the Metropolitan Area

  • Choi, Jae-sil;Kim, Jeong-lae
    • International journal of advanced smart convergence
    • /
    • v.5 no.2
    • /
    • pp.47-52
    • /
    • 2016
  • In this study there was the analysis of government incentives and resident support of public crematoriums, typically identified in Korea as a locally unwanted land use (LULUs), in the metropolitan area. The study looked at what government programs would be potential incentives for allowing the crematoriums to exist in metropolitan communities. Such programs were diverse, with projects focused on: enhancing resident welfare, increasing resident income, funeral facilities and management consignment, community oriented programs, education, funding, and others. Among them, it was found that residents were most in support of programs for enhancing resident welfare and increasing income among residents. In order to resolve the complexities of community support for LULUs and government incentives to shift public perception of cremation, three main policies are proposed. First, it would be necessary to compliment additional project support policies which provide medical services, resident prefered projects, and improvement of substandard housing. Second, it would be important to establish ordinances concretely identifying residential support projects based on community needs assessment. Lastly, it would be of the government's best interest to build policies for resident supported projects that reflect local conditions and the residents' demands for allowing non-preferred facilities to be built, and then to analyze the economic feasibility of these demands.

Cases of Disputes and Patterns of Dispute Resolution in the Area of Public-Private Partnership(PPP) in India (인도의 민관협력사업(PPP): 분쟁사례와 분쟁해결유형)

  • Chung, Yongkyun
    • Journal of Arbitration Studies
    • /
    • v.31 no.2
    • /
    • pp.47-76
    • /
    • 2021
  • India is one of the fast growing country in the world. For the acceleration of economic growth of India, it is indispensable for Indian government to construct infrastructure, such as railroad, airport, harbor, power plant, and water management system. For example, Modi, prime minister of federal government of India proclaimed that Indian government plans to construct 100 smart cities in 2015. In recent times, India is expected to be the largest recipient of Public-Private Partnership(PPP) type projects in the world. Owing to PPP, it is possible for India to pursue her objective to transform the whole economy into digital economy beyond agricultural society. One of major problem related with implementation of PPP type projects is the growth of disputes concomitant to the rising phenomena of PPP type projects in order to build infrastructure in India. Because of this, non-negligible number of projects has been cancelled during last two decades. This study investigates seven failure cases of PPP in India. Those include Nabi mumbai airport, Dabhol power plant, Munbai water project, and Kolkata subway project. Main types of dispute resolution are mediation or conciliation, dispute review board, arbitration, expert adjudication in PPP.

Identification of Critical Success Factors (CSFs) for Public-Private Partnerships Across Infrastructure Sectors

  • Shrestha, Bandana;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.83-90
    • /
    • 2022
  • Public-private partnerships (PPP) projects are becoming popular in both developed and developing countries due to their ability to access new financing sources and transfer certain project risks to the private sector. PPP has been an active research area where the concept of Critical Success Factors (CSF) is often discussed by researchers. This study aims to identify the CSFs for various PPP infrastructure projects that have been explored in previous CSF studies. This article reviewed the literature about CSF in PPP projects from the years 2002 to 2021, compared the findings of studies regarding the identified CSFs, and consolidated the CSFs that can be applied to various PPP infrastructure projects. The results showed that dominant research focused on general infrastructure, where CSFs can be applied to all infrastructure sectors rather than any specific sector. The most identified CSFs from the study are favorable and efficient legal frameworks, appropriate risk allocation and sharing, a robust and reliable private consortium, a competitive and transparent procurement process, and political support and stability. The findings from the study can provide an overview of CSFs that are relevant to specific PPP infrastructure sectors like building infrastructure, transportation, water, etc. as well as for general infrastructure. In addition, the results can also be used for further empirical analysis.

  • PDF

Renewal Methods of Public Space Using Abandoned sites in Works of 'European Prize for Urban Public Space' ('European Prize for Urban Public Space'의 참가작에서 나타나는 유휴지 활용 공공공간 재생방식)

  • Oh, Joon-Gul;Choi, Soon-Sub
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.55-62
    • /
    • 2012
  • Recently, public concerns about renewal of abandoned sites centered in Industrial Heritage are increasing in Korea. For this reason, the purpose of this study was to analyze characteristics of renewal methods of public space using abandoned sites. To achieve the proposed goal, the first part of this study focused on showing public properties involved in the fundamental reasons for the birth and life(persistence) of abandoned sites, which testified that they should be regenerated into public spaces to maximize the potentiality of abandoned sites. Upon preliminary analysis, main values of public space renewal were drawn through the analysis of the selection criteria, type of information about selected works, and classification system in 'The European Prize for Urban Public Space' hosted by the CCCB(Centre of Contemporary Culture of Barcelona). Then, 427 projects participating in this prize from 2000 to 2010 were analyzed to identify characteristics of each level (site-program, process and space). Although this study was limited to the analysis of European projects, it proved that citizens' lives and activities should be involved in projecting-practicing-designing of renewal project using abandoned sites to create a successful public space.

Case study of Civil Engineering BIM Projects: Perspective of Korean Public Owners (토목분야 BIM 적용 사례 분석을 통한 발주자 관점에서의 BIM 발전 전략)

  • Kim, Changyoon;Moon, Hyoun-Seok;Nah, Heu-Suk;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7430-7437
    • /
    • 2014
  • Owing to the increase in large and complex construction projects, the design paradigm of architecture and civil engineering projects has changed from 2D CAD to 3D CAD. For this reason, to meet the strong requirements of project contractors, various efforts have been made to adopt a Building Information Modeling (BIM) technology for effective construction management. On the other hand, compared to architectural projects, only a few civil engineering project cases have been conducted in the perspective of public contractors. This is because the characteristics of civil project contractors and the negative pursuit of adopting BIM technology due to the lack of a current BIM system and technologies. Recently, positive changes in adopting BIM technology for public projects were anticipated by public owners, such as the Public Procurement Service and the Ministry of Land, Infrastructure and Transport. In this regard, this study analyzed the current BIM technology status of public owners in Korea to adopt the BIM policies and guidelines of the Korean government. Strategies for adopting BIM technologies for Korean public owners are also discussed based on an analysis of civil engineering BIM project cases.

An Analysis of Heath-Related Research and Development Registered at the National Technical Information Services (과학기술지식정보서비스의 보건의료 분야 연구·개발과제: 분포와 연구비용 비중 분석)

  • Goh, Young-Gon;Jung, Tae Young;Chung, Hae Joo;Che, Xian Hua;Yu, Sarah;Jo, Min Jin;Cha, Su Jin;Moon, Da Seul;Suh, Ji Young;Cho, Ku Jin
    • Health Policy and Management
    • /
    • v.25 no.2
    • /
    • pp.71-79
    • /
    • 2015
  • With the growth of aging population in Korea, a better care of chronic and other degenerative illnesses is urgently needed. Evidences suggest that this can be achieved through incorporating a wide range of care options, expanding beyond medical interventions. The aim of this study is to analyze the distribution of publically funded research to understand if the Korean research and development funding system matches various approaches and purposes to successfully tackle the chronic care needs of an aging society. We complied the list of funded projects to be analyzed by searching the National Technical Information Service database with key words such as aging society/senescence, chronic diseases, disability, and health promotion. Most projects were based on the biomedical approach with the purpose of establishing the etiology and clinical (treatment) interventions. Health promotion projects showed a distinctive distribution with more percentage of projects based on psycho-behavioral approaches while research on chronic diseases predominantly biomedical. It would be necessary to diversify publically-funded research projects to develop effective and efficient care technologies for the future.

An Empirical Study on the Development Propensity and Quality of the Public Software Project (공공소프트웨어 사업의 개발 성향과 품질에 대한 실증적 연구)

  • Kim Yong Kyong;Kim Pyung Kee
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.4
    • /
    • pp.147-167
    • /
    • 2004
  • This study was empirically performed to demonstrate the development propensity and quality of the public software projects in Korea. Tile sample employed in this study contains 168 auditing reports on 107 public software projects which were carried out in the period of 1998 to 2003. The important findings of this study can be summarized as follows. The quality issue in the development process is getting more important with the lapse of time. In addition, the importance of end users' conveniency increases from year to year. Although the Pareto Principle(20 : 80 principle) is not applied strictly, most problems are caused by a few items. Finally, we find evidence that the overall Quality of public softwares is positively influenced by the information system auditing.

  • PDF

A Study on the Development of Construction Budget Estimating Model for Public Office Buildings based on Artificial Neural Network (인공신경망 기반의 공공청사 공사비 예산 예측모델 개발 연구)

  • Kim, Hyeon Jin;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.22-34
    • /
    • 2023
  • Predicting accurately the construction cost budget in the early stages of construction projects is crucial to support the client's decision-making and achieve the objectives of the construction project. This holds true for public construction projects as well. However, the current methods for predicting construction cost budgets in the early stages of public construction projects are not sophisticated enough in terms of accuracy and reliability, indicating a need for improvement. The objective of this study is to develop a construction cost budget prediction model that can be utilized in the early stages of public building projects using an artificial neural network (ANN). In this study, an artificial neural network model was developed using the SPSS Statistics program and the data provided by the Public Procurement Service. The level of construction cost budget prediction was analyzed, and the accuracy of the model was validated through additional testing. The validation results demonstrated that the developed artificial neural network model exhibited an error range for estimates that can be utilized in the early stages of projects, indicating the potential to predict construction cost budgets more accurately by incorporating various project conditions.

A Design Study of the 'Pathways' According to the Characteristics of the Deteriorated Residential Area (노후주거지의 특성에 따른 '길'의 디자인 연구)

  • Park, Su-Kyoung;Moon, Jeong-Min
    • Journal of the Korean housing association
    • /
    • v.26 no.2
    • /
    • pp.39-46
    • /
    • 2015
  • The 'pathways' in the Deteriorated Residential Area is the valuable place which represents the history of the community. The 'pathways' is the physical boundary which connects individual environment of private residential area to public environment and which has value as a medium for the definite site for regeneration of Deteriorated Residential Area. Thus, the 'pathways' is considered as the perfect material for the public design for spatial culture to regenerate the Deteriorated Residential Area. However, the most of the public design projects utilize the 'pathways' fragmentarily, there are few systematic studies based on the attribute of the Deteriorated Residential Area. The purpose of this study is the consideration on the attributes of the 'pathways', the detection of the spatial characteristics to find application of the 'pathways', and the cultivation of the baseline data for further research for the spatial nature of the Deteriorated Residential Area. For this study, theoretical consideration is practiced in advance to analyze the meaning of the 'pathways' and Deteriorated Residential Area, the case research is performed using design elements as the analytic frame, and the approach is inferred for systematic public design based on the above result. The objects of case research were chosen among the latest projects implemented in the Deteriorated Residential Area whose subject was 'pathways' and which showed successful result. The characteristics of them were investigated and the details were examined through the homepages of the projects, the reports related to the projects, research material, and interview with the people involved. And to conclude, 'pathways' represents the composition of contents, the space of movement, the formation of community, the landscape design, and the participatory design in the Deteriorated Residential Area. The 'pathways' also finds the proper secondary cultural material for the spatial characteristics and can create the space for the various movements, stay, and communication using the characteristics of movements. The narrow and closed space should be utilized actively to be altered into beautiful space and the Deteriorated Residential Area should be regenerated into coexistent design where people share their lives through sharing spaces.