• Title/Summary/Keyword: Public Projects

Search Result 1,503, Processing Time 0.028 seconds

A Study on Selection of Media to Communicate Information for Raising Awareness of Soil Erosion Control Projects (사방사업 인지도 확산을 위한 정보전달 매체 선정 연구)

  • Ryu, Yoon-Jin;Cho, Dong-Gil;Youn, Ho-Jung;Lee, Chang-Woo;Lee, Ji-Hyun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.2
    • /
    • pp.1-11
    • /
    • 2018
  • As a result of climate change, mountain sediment disasters due to localized heavy rain and mountain development are occuring more frequently, thus, increasing social attention to and demand for soil erosion control projects. However, since 2011 Seoul Wumyeon Mountain landslide, the public is expressing increasing anxiety as well as negative perception regarding defective project results. Therefore, this study investigated promotional terms and information media related to soil erosion control projects according to the consumer in order to increase awareness of soil erosion control projects. In this study, the information consumers were divided into experts and the general public and conducted a survey related to promotional terms and media for communicating relevant information. In the result, the experts chose landslide prevention and recovery projects (41.8%) as an appropriate promotional term for soil erosion control projects. The general public, however, chose mountain sediment disaster prevention projects (32.5%) as the appropriate promotional term. However, the analysis showed that it would be necessary to develop an promotional term that can encompass the concept of 'disaster prevention' including forest and soil disaster as the word 'landslide' can suggest soil erosion control is limited to landslides only. In the survey regarding the media for communicating information related to soil erosion control projects according to the consumer type, the experts preferred radio and TV as media to communicate the relevant information, while, among the general public, the youths preferred social media such as Facebook and Twitter (22.22%) and adults radio and TV (34.07%), As for the most effective way to promote soil erosion control projects, the experts chose traditional promotinal media such as newspaper, radio, and TV (0.172) whereas the adults and youths preferred the internet and Facebook (0.089). It appears that using the preferred media for communicating information related to soil erosion control projects according to the consumer type will be effective way to promote soil erosion control projects.

A Study on Improvement Measures for the Design Documents Delivery System in Public Road Construction Projects (공공 도로건설사업에서의 설계도서 납품체계 개선방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin;Kim, Tae-Hak;Ju, Ki-Bum
    • International Journal of Highway Engineering
    • /
    • v.20 no.2
    • /
    • pp.45-55
    • /
    • 2018
  • PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.

Competency Development in Urban Local Bodies for Implementing Public Private Partnership Projects in India

  • Devkar, Ganesh A.;Kalidindi, Satyanarayana N.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.2
    • /
    • pp.35-48
    • /
    • 2013
  • Weak competencies in urban local bodies (ULBs) for implementing public private partnership (PPP) projects has been recognized as a major hurdle in uptake of PPP model in India. In this context, a questionnaire survey was conducted to evaluate perception of urban PPP experts and ULB representatives on three aspects related to competency development, including, critical competencies for implementing urban PPP projects, approaches for competency development in ULBs and constraints faced by ULBs in development of competencies. The five critical competencies identified are project identification, project conceptualization, transaction design, PPP process management and contract management. The approach of training programs for municipal staff and elected representatives, and capacity building oriented technical assistance for implementing urban PPP projects have been preferred by survey respondents for competency development. The frequent transfer of municipal decision makers and low motivation among municipal staff have been identified as the most significant constraints for development of competencies.

Construction of Time - Cost Model for Building Projects in Vietnam

  • Long, Le-Hoai;Lee, Young-Dai;Cho, Jeong-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.130-138
    • /
    • 2009
  • Bromilow's time-cost (BTC) relationship was examined for building projects in Vietnam using actual construction time and total construction cost. Data set was collected from 77 historical building construction projects completed between 1999 and 2005 which were adjusted by consumer price index (CPI) to 2000 price. Time-cost equations were specified respected to two sectors, public and private, in Vietnamese construction industry and all cases. It is shown that a public funded building project has the longer construction duration than a similar budget private funded project. The resulting models are statistically significant. The adjusted R-square coefficients of all cases, public and private projects models are respectively 0.403, 0.436 and 0.377 mean that the BTC regression lines moderately fit the data set.

Government's Roles in Public Private Partnership Toll Road Projects

  • Rohman, Mohammad Arif;Doloi, Hemanta;Heywood, Christopher
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.381-385
    • /
    • 2015
  • This research aims to investigate critical factors of the government's role in achieving success in Public Private Partnership (PPP) toll road projects in Indonesia according to government and private sectors' perceptions. A preliminary interview Subsequently a questionnaire survey was also conducted involving 143 respondents across the two sectors from eight operating toll were five critical factors of the government's roles in achieving success in PPP toll road projects, namely; "Active involvement in overall project stage activities", "Establishment of good bureaucracy", "Provision of conducive environment", "Appropriate project planning and competitive tendering" and "Provision of appropriate government support and supervision". This research finding is expected to assist the government in defining clear roles and underlying responsibilities in development of PPP toll roads in Indonesia.

  • PDF

A MODEL FOR SELECTION, AWARDING, AND MONITORING OF PPP PROJECTS IN DEVELOPING COUNTRIES; HEALTH CARE FACILITIES IN COLOMBIA

  • Henry Arboleda-Mantilla;Carlos A. Arboleda
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.344-351
    • /
    • 2013
  • Private participation on public infrastructures projects is being promoted by governments of several developing countries, among them Colombia. As a result, several advantages such as service delivery efficiency, technology application and faster execution of the projects have been recognized. Hence, the Colombian Government is looking for schemes that allow the private investment in projects like hospitals, schools, prisons and public edification. In this paper, experiences in PPP from other countries were analyzed and adjusted to the Colombian environment. As a result, a model adapted to Colombia is presented, based on a well-developed case from Spain. The awarding process is defined by economic criteria, previous compliance of minimum technical exigencies. Once the infrastructure is operating, contractual periodical payments will be done, based on the performance of the facility.

  • PDF

The Public-Private Partnerships and the Fiscal Soundness of Local Governments in Korea

  • LEE, HOJUN
    • KDI Journal of Economic Policy
    • /
    • v.39 no.1
    • /
    • pp.41-82
    • /
    • 2017
  • This paper studies the risks associated with local finance in Korea by identifying the financial status of each local government, including the financial burdens of PPP projects, and examined governmental future burdens related to PPP projects. We reviewed all fiscal burdens associated with projects, such as, for BTL (Build-Transfer-Lease) types of projects, facility lease and operating expenses, and, for the BTO (Build-Transfer-Operate) types of projects, construction subsidies that are paid at the construction stage, MRG (Minimum Revenue Guarantee) payments and the government's share of payment. Furthermore, we compared the annual expenditures of local governments on PPP projects against their annual budgets and checked if the 2% ceiling rule could be applied.

Improvement Factors of Promoter Selection Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects (BTL사업의 사업시행자 평가기준 개선 요인 분석)

  • Shin, Hyun-In;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.310-316
    • /
    • 2006
  • Since 'Act on Private Participation in Infrastructure' were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation in Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of Promoter. However, score for cost is likely to influence selecting Promoter to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for selecting Promoter in BTL projects, and proposed improvement factors by doing questionnaire over specialists of each field.

  • PDF

A Proposal for Risk Management according to Organizational Tendency for the Overseas EPC Projects of Public Company (공기업 해외발전 EPC 사업 진출 시 조직성향에 따른 위험관리 방안에 관한 연구)

  • Jang, Hyung Sik;Koo, Il Seob
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.2
    • /
    • pp.67-76
    • /
    • 2022
  • Power generation construction projects involving large amounts of capital can affect the survival of a company along with huge economic losses in the event of a business failure. In general, private companies are organizations with challenging risk taking tendencies while public companies have a risk averse tendency to avoid risk, so these differences in organizational tendencies make it difficult to respond to risk. In particular, public companies are more likely to fail than private companies because they choose the contradiction of risk picking to enter overseas markets with high uncertainty despite their tendency to risk averse due to the nature of the organization. Therefore, these organizations need risk management techniques that reflect a risk-averse strategy. Accordingly, this paper analyzes the risk management research papers of the existing overseas development EPC business in order to find the risk management techniques related to the organizational tendencies of public companies and proposes "establishing a performance audit system for risk management of the organizational tendencies of public companies" as a way to extract the risk factors through the examples of overseas development projects of public companies and to manage the organizational tendencies of public companies that affect them.

Critical Success Factors of Public and Private Partnership Projects in Domestic Smart Cities Focusing on the Leading District Projects of the National Pilot Smart Cities (국내 스마트시티 민관합동사업 핵심성공요인 도출 - 국가시범도시 선도지구 발주사업을 중심으로 -)

  • Hyun, Kilyong;Wang, Jihwan;Jin, Chengquan;Lee, Sanghoon;Hyun, Changtaek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.116-127
    • /
    • 2022
  • Recently, the smart city market based on the 4th industrial revolution is rapidly expanding worldwide and is being promoted in various ways. Korea has promoted various smart city public and private partnership projects, but there were limits to the activation of smart city public and private partnership projects due to insufficient enactment and revision of laws, public-oriented ordering method, and lack of private execution capacity. Therefore, this study intends to suggest key success factors for each stage of smart city public and private partnership projects through the analysis of the order status of the smart city national pilot city and the analysis of previous research. Through this, it is expected that it will be possible to eliminate various types of risks that may occur in the domestic smart city public and private partnership projects and contribute to revitalizing the smart city public and private partnership projects.