Purpose: This study was to identify activities and related problems on health promotion of public health nurses, and to investigate basic data proposed to revise strategies of Health Promotion Nurse Specialists (HPNS). Method: The subjects of this study were 787 public health nurses sampled by clustering of the entire nation of Korea. Data were collected by focus group studies and cross-sectional survey during April to October of 1999. Results: 13.3% of public health nurses took responsibility for health promotion projects and 45.9% were involved in health promotion work with in home care or other routine activities. Also, the factors public health nurses perceived as barriers to implement activities for health promotion were time limitation, lack of ability for planning projects, insufficient time for specialties, inadequate understanding about health promotion project. Conclusion: According to the study, they need to have special education and further technical support. These results have important implications for the establishment for the role of Health Promotion Nurse Specialist. Also, in developing systems and curriculums for Health Promotion Nurse Specialist, the major factors described above need to be considered carefully.
Since the village maintenance type public housing project was introduced in 2015, the resident needs for regional revitalization and pleasant living conditions are not being met due to the poor performance of the public housing complexes that reflect the surrounding area maintenance plan (village plan) and regional characteristics. The purpose of this study is to suggest a plan to revitalize the village maintenance type public housing project in consideration of regional characteristics as a result of analyzing the needs of local residents through the problems of the village maintenance type public housing project being promoted so far and resident satisfaction. As a result of the analysis based on the public housing project implementation status analysis and resident satisfaction, the plans to activate the village maintenance type public housing project are as follows. First, in order to secure the effectiveness of the village plan, it is desirable to promote the public housing project and the village plan at the same time. It is necessary to secure a budget according to the selection of public offering projects in the village plan, such as promoting public housing projects without setbacks by prioritizing land purchases for public housing sites and establishing specialized strategies considering regional characteristics. Second, a public housing project that responds to local demand is required. The evaluation factors such as continuous promotion of the urban architecture integration plan and strengthening of regional linkage plans such as specialization of regionally tailored designs should be supplemented so that regional resources and village plans are linked with the public housing specialization plan. Third, surrounding area maintenance plan (village plan) should be secured by the strengthen of the legal status or establishing related provisions. It is also necessary to promote system improvement for area maintenance plan (village plan) when selecting a publicly funded public project.
Journal of the Korean Professional Engineers Association
/
v.42
no.5
/
pp.23-28
/
2009
BIM technology has been introduced in various fields of the construction industry recently. The owners of the public construction projects are already interested in BIM technology and they started to apply BIM technology in their projects. This paper introduces the successful BIM cases of overseas and domestics projects and shows how to introduce and apply BIM technology in the architectural design firms and construction companies and how to train their engineers with BIM technology.
Concept of conflict management system and necessity of introducing it into the executing process of public projects have been subjects of any previous studies. Those systems are, however, not practically applicable to rail projects given the unique nature of rail industry. In this context, the author presented cases of conflicts emerged during the process of the Gyung bu High Speed Rail Construction Project and mapped out realistic case study applicable to construction sites.
Recently, many regional governments and national organizations have propelled public art projects as a part of city regeneration project for improvement of living environment and cultural welfare of neglected regions. It is necessary to think of meaning of the public art project in a context of city regeneration, not only in public art discourse. This paper starts from the question if recent public art projects performed in city of Busan during last 5 year was successful in terms of place marketing. This paper tried to revoke to consider public art project in terms of place marketing because it should be utilized ultimately to activate regional economy for the habitants. First, we reviewed theoretical background regarding definition of public art and place marketing, intended effects of public art project, and place marketing strategy. we elicited an analytical framework and analyzed representative 6 cases of recent public art projects performed in city of Busan in terms of requirements of public art project and viability of place marketing. Discussion of the analysis result suggested implications for the future public art project to direct.
Suncheon City Regeneration Project is known as the concept of cultural residents. Through the previous projects, the residents' capabilities have been improved, and the projects have been carried out according to their strategies. For this reason, participants in urban regeneration projects are important. The purpose of this study is to actually identify the 'rescue center' and 'direct relationship' with the analysis utilizing the characteristics of social networks NetMiner solution of the participants, who led the project, Suncheon. Surveys and interviews were conducted for participants, and the characteristics of social networks were analyzed in time series to quantify and visualize the results. As a result of the analysis, social networks were changed among the participants before and after the urban regeneration project. Initially, loose networks were denser over time, and initially networks formed only around participants were expanded over time. Network analysis has revealed that the system is strengthening with urban regeneration projects in the form of public and public-private cooperation. This highlights the need for a city-centered urban regeneration strategy centered on people and shows that a dense network of participants can be a success factor.
The purpose of this study is to introduce the web database for healthy city Wonju that contains healthy city indicators and materials. It has provided diverse information to public officers who are working on healthy city projects and citizens for monitoring and evaluating the projects, effectively. The web database was made on 2006 and was updated on 2009. The new Web database system was designed for supporting that the staffs of healthy city can manage all data update by themselves. The new Web database encompasses more recent information about health city projects. After identifying users' needs and reasons for modifying the fields of data, we added new indicators to the Web database. Some redundant indicators were deleted based on users' requests. The Web database quality evaluations were performed by using 13 quality evaluations constructs. Through all 13 constructs, less than 20% of study subjects felt that it did not satisfy their needs or expectations. Well developed and verified contents of the Web database for healthy city are very essential and important. The database makes healthy city projects alive by managing and sharing healthy city related data and indicators effectively.
Restructuring of electricity industry is going on for the purpose of introducing competition and after separation of generation and retail business and introduction of competition, substantial change is expected in overall electric power system. In other words, DSM projects are divided with public projects and private projects. Particularly for public project, it is essential to evaluate the DSM volumes by program. This paper tries to derive the ways for achieving the necessary DSM goal in the electricity industry in Korea. First of all, by analyzing the load in Korea, we forecast the standard demand and estimate the technological potentials of each program in considering DSM technological indicators. Moreover, by using economic analysis by program, we estimate economic potentials and finally, we estimate the potentials by program in considering the DSM policy. We estimate the potentials by using random method because application methodology and procedures by program are not established until now, which leads to not obtaining transparency for implementation effect by program. Therefore, this paper estimates the future potentials of DSM projects by using the logical and systematic analytic method and establishing database for DSM basic indicator. The DSM goals estimated by this method will be reflected to mid/long term nation-wide resource planning, which will mitigate anticipated power supply shortage and be applied to derive desirable energy demand/supply structure.
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.2
/
pp.471-480
/
2015
The market of public-private partnership (PPP) projects has reduced from 9.4 trillion won in 2007 to 4.5 trillion won in 2012. However, the need of PPP projects is brought up by a massive down scale of government financial business. Previous studies regarding PPP projects mostly evaluate profitability from the financial perspective or analyze risk factors as a whole. Although PPP projects generally have complex structure involving diverse stakeholders, such as contractor, financial investor, and special purpose company (SPC) operators, existing studies have rarely considered the different viewpoints of PPP project stakeholders. Therefore, purpose of this study is to develop a structural equation model (SEM) considering the diverse stakeholders of PPP projects. To this end, the authors first reviewed the organizational structure of PPP projects. Next, the identification of the factors affecting project profitability are done via comprehensive literature reviews. After that, we conducted in-depth interviews and questionnaire surveys to reflect stakeholders' perspectives (contractors, financial investors, and SPC operators). As a result, a SEM model is developed to analyze direct and indirect effect on the PPP project performances. Finally, using the analysis results, relevant implications and directions for improvements are discussed. The prediction of the business performance of contractor, financial investor, and SPC operator is expect to be possible through the model developed and supports the strategy deduction that is appropriate for the participants.
Proceedings of the National Institute of Ecology of the Republic of Korea
/
v.2
no.4
/
pp.247-258
/
2021
To understand restoration and conservation projects conducted in Korea for endangered freshwater fishes and amphibians/reptiles, information about Request for Protocols-related studies on restoration, breeding, and release were collected. Trends of studies were visualized via word clouds and VOSviewer program using a text mining technique. Analysis of restoration projects for endangered freshwater fishes elucidated that most research studies conducted to date were focused on genetics and release through captive breeding that could be classified into captive breeding and habitat environments. As for research projects related to amphibians/reptiles, monitoring projects had the highest number, followed by genetic, translocation, and monitoring studies. In addition, restoration projects for amphibians/reptiles included a large number of post-capture translocation projects. Thus, many projects were confirmed by public institutions rather than by the Ministry of Environment. Network analysis revealed that it was largely classified into capture, translocation, and Kaloula borealis. Based on these results, limitations, achievements, and challenges associated with projects conducted thus far are highlighted. Research directions for future restoration and conservation of endangered freshwater fishes and amphibians/reptiles in South Korea are also suggested.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.