• 제목/요약/키워드: Public Projects

검색결과 1,503건 처리시간 0.023초

공공디자인사업 수행 프로세스의 구조적 특성에 관한 연구 (The Structural Characteristics of Work Processes in Public Design Projects)

  • 박수경;문정민
    • 한국실내디자인학회논문집
    • /
    • 제22권3호
    • /
    • pp.145-153
    • /
    • 2013
  • Since a government design department office was set up in 2007, active design projects have been implemented. With this opportunity, each local self-governing organization has improved its administration and institutions, and are planning intensive research on public design for efficient execution of public design projects. However, recent public design projects have caused many problems due to unspecialized design processes, a lack of cooperation with relevant organizations, and unsatisfactory management systems after projects. Therefore, to overcome such problems in the execution of public design projects, a procedure-centered model should be developed. This study aims to analyse the process structures for the strategic execution of public design projects, and the methods and content of the execution process. For this purpose, this study looked into the process structures of public design projects based on design management strategies in order to draw suggestions needed for the execution process through advanced cases. The study is summed up as follows: First, when the process of public design projects was examined in terms of management strategies and design management strategies, it included two dimensions: the management structure of general projects and the design of development projects. Secondly, through the analysis of public design cases, this study discovered useful methodologies and the main programs used and drew suggestions needed for each step in public design projects. It is expected that the results of this study will be helpful for the development of a process model appropriate for national public design projects based on the current status of the project execution and to make a contribution to systematic development in national public design.

AN ANALYSIS ON FACTORS AFFECTING SCHEDULE PERFORMANCE OF PUBLIC HOUSING PROJECTS: CASE OF SINGAPORE

  • Bon-Gang Hwang;Xianbo Zhao;Si Yi Ng
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.412-418
    • /
    • 2013
  • With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.

  • PDF

국내 공공미술 사업의 건축적 경향 - 국내 건축가가 단체로 참여한 2000년 이후의 사업을 중심으로 - (Architectural Tendencies of Public Art Projects in Korea - Focused on Those in Which Korean Architects Participated in Group after 2000 -)

  • 박슬기;김란수
    • 한국실내디자인학회논문집
    • /
    • 제24권1호
    • /
    • pp.133-143
    • /
    • 2015
  • This study tried to inquire architectural tendencies in public art projects by analyzing projects and public art works designed by Korean architects. First, it described not only the background and the objectives of this study but also the scope and the methods of it. Second, it gave an overview of public art by explaining the concept, the institutions, and the history of it in Korea. Third, it investigated the contents of public art projects in Korea, in which more than two architectural teams participated, analyzing the tendencies of public art works designed by architects. In order to find the architectural tendencies of public art projects, it analyzed the intentions, the contents and the expressions of architects' art works. In conclusion, this study regarded the architectural tendencies as site-specific, space-experiencing, sheltering, multi-purposeful, contextual, recycling, and eco-friendly.

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

주요개발사업의 환경영향평가서 분석을 통한 사회경제항목평가의 문제점과 개선방안 (Analysis of Problems and Improvement of Environmental Impact Assessment in Social-Economic Items Based on 19 Major Large Scale Development Projects)

  • 이상돈
    • 환경영향평가
    • /
    • 제13권4호
    • /
    • pp.165-185
    • /
    • 2004
  • Assessment in Socio-economic items should be used to estimate social influence when policies and projects were introduced. To estimate current situation of socio-economic items 19 Environmental Impact Statement (EIS) of large scale projects were analyzed. The projects were selected based on magnitude of social impact when the projects were implemented. Environmental Impact Statement was categorized into line projects(road construction, railroad construction, stream development, etc), and surface projects(energy development, wetland reclamation, recreation and sport development, and housing and residential development, etc) thus being chosen for 19 projects in each categories. This report was based on the analysis of 7 items in socio-economic environmental items(i.e., population, residents, industry, public facilities, education, transport and historical monument). Most EIS did not follow the regulation suggested by Ministry of Environment, and only current circumstances were briefly described. Indifference of in-depth analysis of socioeconomic environmental items would influence the process of social and environment impact negatively in the midst of construction of National Projects such as Outer Circle Seoul Highways, Saemankeum Reclamation Projects, etc. This abrupt halt of construction was mostly based on a lack of public hearing or public participation. Socio-economic items are also very much lacking in quantitative method and strengthening socio-economic environmental items is needed via checklist or matrix that brings decision-makers better ideas objectively.

지방자치단체의 재정확충 제고방안에 대한 사례별 조사연구 -경기도 경영수익사업을 중심으로- (A Case Study on the Method of Public finance expansion for Local Government : - Focus on Kyonggi province profit-oriented public projects -)

  • 정종기;최락인
    • 한국컴퓨터정보학회논문지
    • /
    • 제5권3호
    • /
    • pp.159-170
    • /
    • 2000
  • 본 연구는 현재 지방자치단체의 재정확충의 일환으로 시행되고 있는 경영수익사업의 문제점을 경기도의 사례를 중심으로 파악하고 이에 대한 개선방안을 제시하고자 한다. 지방자치단체가 실시하고 있는 경영수익사업의 문제점으로는 대상사업에 대한 설정문제, 계획수립 단계에서 안고있는 문제, 사업을 운영하는 데서 나타나는 문제점으로 구분할 수 있다. 이러한 문제점에 대한 제고방안으로는 수익성이 있더라도 공공성이 낮은 사업은 자제해야 하고 민간부문에 맡겨야 하며, 경쟁성이 높은 사업은 가능한 한 추진하지 말아야 한다. 또한 민간부문의 진입이 여러 가지 장애로 인하여 어려운 경우 지방자치단체에서 추진하는 것이 바람직하다. 그리고 현재 시행하고 있는 사업에 대해서도 관련제도의 개선, 또는 보다 신축성 있는 운영, 경영수익사업을 전담하는 부서를 신설하여야 하며, 공무원의 경영마인드의 제고가 필요하다.

  • PDF

A COST DATA-BASED ESTIMATING MODEL FOR FINISHES IN THE KOREAN PUBLIC OFFICE BUILDING PROJECTS

  • Joon-Oh Seo;Sang H.Park;Choong-Wan Koo;Jong-Hoon Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.685-691
    • /
    • 2009
  • Recently, public office building projects are being recognized by many construction engineers and researchers, as the critical projects in the construction industry. The project budgets have sometimes exceeded due to the lack of core knowledge, experiences, skills and experts concerned in cost planning and estimating in the pre-construction stage. It has been highlighted that planning and estimating effectively the cost of public office building projects as critical in the design stage. Within this context, some cost data books and systems, such as RSMeans cost data systems and Spon's price book, have been systematically developed and used by many construction cost managers and organizations in order to effectively estimate and use their project budgets. As a result of this research, a cost estimating model for finishes has been developed, considering the cost data used in public office building projects.

  • PDF

Critical Factors Affecting No-dispute Performance: A Case of Ethiopian Public Construction Projects

  • Sinesilassie, Ephrem Girma;Tabish, Syed Zafar Shahid;Jha, Kumar Neeraj
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권4호
    • /
    • pp.24-34
    • /
    • 2016
  • Disputes seem to be synonymous with large-scale construction projects in Ethiopia. The purpose of this study is to determine the factors responsible for impacting the performance of Ethiopian public construction projects. To this end, 35 success and failure attributes responsible for impacting the performance of the projects were identified and presented to Ethiopian construction professionals in the form of a structured questionnaire, and responses were collected. The factor analysis conducted on the success and failure attributes influencing no-dispute performance separately resulted in six success factors and five failure factors. Further analysis using stepwise multiple regression indicates that owner competence and interaction among project participants have a positive impact on no-dispute performance. However, conflict among project participants has a negative impact on the no-dispute performance of Ethiopian public construction projects. Although Ethiopia-specific, the results reflect construction management problems common to both developed and developing countries. The findings are expected to help researchers and practitioners gain a better understanding of critical success and failure factors and to help them take proactive measures to avoid disputes in public construction projects.

진술선호방법을 이용한 공공 데이터의 가치 평가: 농업토양정보 데이터베이스 사례 (Valuation of Public Data Using Stated Preference Method: The Case of Agriculture Soil Database)

  • 이상호;하성호;정기호
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제27권4호
    • /
    • pp.149-165
    • /
    • 2018
  • Purpose As Korean economy has been sluggish in recent years, firms' interest in publicly financed projects has increased due to the relatively increasing proportion in the economy. Since 1999, publicly financed projects in Korea need to undergo preliminary feasibility study to evaluate economic efficiency and policy quality if they are larger than a certain scale. The benefits of public projects are one of the most important factors in the preliminary feasibility study but are difficult to estimate due to their nature. Design/methodology/approach This study estimates the benefits of the agricultural soil information database, a public database in Korea. The method used in the study is the stated preference method which is formally used in Korea's preliminary feasibility study. Data are collected through surveys and a logit model is constructed to be estimated by the maximum likelihood estimation method. Findings As the first study evaluating a public database, this study can be used as a baseline in all public database projects developed in the future. In addition, this study can contribute to improving the understanding of both private companies and public organizations who are interested in the cost-benefit analysis and estimation procedure for the publicly financed projects.

공공부문 정보화사업평가 - 지식경영 측면의 접근 (An Evaluation of Information Systems Services in the Public Sector: Knowledge Management Approach)

  • 임준형;명성준;김재영
    • 지식경영연구
    • /
    • 제18권3호
    • /
    • pp.231-246
    • /
    • 2017
  • As an interest in the efficiency of public sector expenditures has spread across the world, Korea has operated a self-evaluation system for government projects as a part of the performance-based budget system. However, an evaluation system for public information technology project has been criticized for its lack of validity, which stems from the uniformity of performance management. This study draws insight from knowledge management literature in an attempt to address the problems with the extant performance evaluation system in public agencies. To realize benefits from IT investment, an agency needs to develop its own performance management model for information systems projects, with a focus on the interaction of IT and organizational system. The knowledge management-based framework for IT projects was verified through a case study, with which we discussed the applicability of knowledge management to the evaluation of public information systems projects.