• Title/Summary/Keyword: Public Procurements

Search Result 7, Processing Time 0.082 seconds

DEVELOPMENT OF THE ANTI-CORRUPTION OPERATING SYSTEM ON CONSTRUCTION CONTRACTS AND PROCUREMENTS IN KOREA

  • Jee-Hye Kim;Kwang-Seop Lee;Kyung-Rai Kim;Hee-Sung Cha;Dong-Woo Shin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1106-1111
    • /
    • 2005
  • The present Korean laws related to anti-corruption are not effective in preventing corruptions[1]. In this context, the purpose of this study is to build the proactive anti-corruption operating system that has the function to prevent corruptions from occurring in the contract and procurement sector of Korean public construction projects. The proactive anticorruption operating system consists of four parts ; developing integrity performance manual(IPM), making integrity performance plan(IPP), practicing IPP, and integrity performance evaluation(IPE). By analyzing various kinds of audits and relevant laws and interviewing with government officials and staff in construction companies, the causes and stereotypes of corruptions and the concept, role, and guide of IPM, IPP, and IPE are provided in this paper.

  • PDF

A Study on the Possibility of E-Government Procurement in China

  • Lee, Seoung-Taek
    • Journal of Korea Trade
    • /
    • v.23 no.6
    • /
    • pp.52-65
    • /
    • 2019
  • Purpose - This paper aims to study what is impacting the development of e-Government Procurement in China, the current strategies of developing Chinese Governmental e-Procurement, and to present some measures by which Korea's exporting industry could enter the Chinese procurement market. Design/methodology - This study is to provide a systematic literatures review on what is impacting the development of e-Government Procurement in China. Hence, based on western research, Chinese literiatures are used for this study. Findings - To penetrate the e-procurement of the Chinese government, the acquisition of government procurement certification is necessary. Secondly, the qualification of "Made in China" is one way to join the market. And finally for Korean companies to enter the procurement, it is necessary to provide products to the public institutions such as universities, hospitals and social organizations and to the state-owned enterprises. Originality/value - This paper aims to study what is impacting the development of the e-Government Procurement in China, the current strategies of developing Chinese Governmental e-Procurements, and to present some measures by which Korea's exporting industry could enter the Chinese procurement market. These originalities can be expected to give understanding of Chinese e-govenment procurement and insight for strategy for both Korean enterprise and relavant academic circles.

A Study on Building up Integrated Information System & Assistance System to Increase UN Procurement Market Access (UN조달시장 진출 활성화를 위한 종합정보시스템 및 지원체계 구축방안)

  • Bae, Jung-Han;Kim, Gwi-Ok
    • International Commerce and Information Review
    • /
    • v.6 no.3
    • /
    • pp.269-296
    • /
    • 2004
  • International Procurement refers to the actions governments and public institutions worldwide buy goods and services. With the WTO agreement on government procurement, most procurements are realized by bidding, which accelerates the opening-up of International procurement. Today International procurement has drawn the world's attention. The scale of international procurement market has been developing fast, reaching about US$ 5.55 trillion this year, In our country, however, due to the difficulty in initial market access to local procurement, the participation in taking international procurement is quite inactive, especially when compared with our exporting scale. The UN procurement market has procurement rules that countries which make contributions to UN and developing countries are favorably treated, and non-discriminatory and public competition in bidding and the optimum purchase are kept, and so on. It has its own head office and many subsidiary agencies. Actually the international procurement market offers an international marketplace for suppliers of all tangible goods and services. Therefore, UN and international procurement markets are great significant foreign markets to our country. But our country lagges behind in international procurement as it has not reached to our monetary contribution to UN. Therefore, it's essential to stimulate our company's participations in the UN procurement market. To fulfil this purpose, first of all, this study analyzes the current status of UN procurement market and Korea's current participation status. Then it investigates the procurement information system of UN and Korea's international procurement market information system as well as assistance system. Based on the above, by studying on the actual spots of the interview investigations on the registered firms in UNPD, this thesis discloses the problems with the Korea's national information system and assistance system on UN procurement market. Finally, this study raises the efficient plan for the integrated international procurement information system & assistance system.

  • PDF

BRIBERY INTENTION IN CONSTRUCTION INDUSTRY : AN APPLICATION OF THE THEORY OF PLANNED BEHAVIOR

  • Chung-Fah Huang;Kuen-Lung Lo;Shiau-Ju Shiue;Hsin-Chian Tseng
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.318-323
    • /
    • 2011
  • Illegal and unethical behaviors of the construction industry affect people's lives and health more than the same problems of the other industries. Among these behaviors, the construction industry is mostly criticized for bribery scandals. According to the survey of the Ministry of Justice in Taiwan over the past years, bribery cases involving public engineering projects and governmental procurements account for a rather large portion of the indicted corruption cases. Transparency International's "Bribe Payer Index" indicates people in construction-related industries are the most likely to pay bribes. Poor construction quality directly and indirectly caused by bribery poses a great threat to public safety, organizational reputation and economic development. However, there is a limited number of existing research on the bribery problem of the construction industry. This study is an empirical attempt to explore bribery intention and its affecting factors among the construction organizations in Taiwan by conducting a questionnaire survey. The theory of planned behavior was used in this study to build its research model (covering elements of attitude, subjective norm, perceived behavior control, and intention). Totally 431 valid samples were returned. To explore the factors affecting bribery intention, this study adopted Pearson's correlation analysis to discuss about the connections among the questionnaire respondents' attitudes to bribery, subjective norms, perceived behavior control, and bribery intention. A multi-regression analysis was then conducted to test if the planned behavior theory can effectively predict bribery intention. The research found (1) according to the results of Pearson's correlation analysis, the respondents' bribery intention, attitudes, subjective norms, and perceived behavior control are positively correlated with one another; (2) according to the results of the multi-regression analysis, bribery intention can be explained through attitudes, subjective norms, and perceived behavior control with an adjusted R2 value of 0.591, meaning 59.1% of the bribery intention's variances can be explained through the three dimensions. In addition, each of the three dimensions has a significant influence on the respondents' behavior intentions.

  • PDF

A Study on the Wooden Procurement in the Diary of Yeonggun during the Construction of Gyeongbokgung Palace in King Gojong's reign (고종대 경복궁 중건 시 영건일기에 나타난 목재 조달 고찰)

  • Kim, Bue-Dyel;Cho, Jeong-Sik
    • Journal of architectural history
    • /
    • v.29 no.6
    • /
    • pp.101-112
    • /
    • 2020
  • This study focuses on the construction of Gyeongbokgung Palace in the second year of King Gojong's reign, which has been spotlighted for political and economic history. The author analyzed the contents of wood procurement with the Yeonggeon Diary, which records each day of construction site. The results are as follows: First, the 2nd year of King Gojong's reign, Yeonggeon of Gyeongbokgung Palace, was a new building that reflected the old system and 270 years of changed environment on the existing site. Despite the poor economic conditions, it began with years of effort and voluntary volunteer work and dedication. Second, the priority of timber transport was recruiting people in the whole process and the supply and demand of transportation tools. Carrying lumber from the mountains to the riverside and floating it at the right time were all a matter of manpower. Soldiers and carts were used to carry timber that arrived in Hangang River to the construction site. The cart was a consumable product, so it was necessary to continuously use the wood to make cart at the site. Third, fire and flood were the biggest obstacles to the Yeonggeon schedule of Gyeongbokgung Palace. Especially the fire was fatal. It was difficult to extinguish the fire in temporary structure, where was the storage for wood to construct. These disasters greatly affected the construction cost and construction period. Wood procurements of Gyeongbokgung Palace were based on public offerings. At the same time, recycled materials from other palace wood and nearby houses, nationwide buying of private mountain wood, the logging of royal tombs and some of the buildings of Gyeonghui Palace and Changgyeong Palace were relocated.

A Study on the Improvement Direction through the Analysis of the Legal System and Current Process of KONEPS (국가종합전자조달시스템의 제도 및 프로세스 고찰을 통한 개선 방향 연구)

  • Kim, Sang-Min;Lee, Hyun-Soo
    • Journal of Digital Convergence
    • /
    • v.15 no.11
    • /
    • pp.23-35
    • /
    • 2017
  • Since the beginning of 2002, KONEPS(Korea ON-line E-Procurement System) which is known with GePS(Government e-Procurement Service), has become a significant role in Korea public procurement service. This paper focuses on the amendments of the related laws and the practical improvement of inconveniences and inefficiencies in user's' position during the use of KONEPS. We analyzed the case of government procurement by major countries, the detailed process and function of KONEPS, and confirmed the revised procurement laws since the commencement of KONEPS. When a user of KONEPS makes an online purchase at the g2b shopping mall to purchase procurement goods, we analyzed focused on the inconvenience of option selection, user feedback after purchasing, unification of the purchase procedure, compared with general online shopping purchase. This paper suggests practical ways to improve the inconveniences and inefficiencies that arise in the process of procurement and use from KONEPS. It is necessary to study on the construction contracts and the empirical studies based on the questionnaire on the functions of procurement law and research model for the cases used in this study in the future.

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the time of System Transition, from Responsibility Supervision to Construction Management (II) - Focused on CM Terminology & ICEC Coordination - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(II) - CM 용어와 ICEC 조정을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1357-1366
    • /
    • 2015
  • This study (II) aims to draw up the future-oriented construction policy recommendations based on the outcomes as a result of a broad research and conducting questionnaire surveys on the arguable issues raised by construction engineers for roads and bridges in the course of previous study (I) implementation. As for the question of "The term 'Construction Management (CM)' which currently is defined in two (2) ways", 45% of respondents have answered that two (2) different types of CM should be unified into one (1) CM type as is the case in most advanced countries. About the question of "The ways to educate the CM professionals", many respondents have preferred to acquire CM professional certificate after receiving education for a certain period of time from private CM training institutions. As for the question of The revised draft that the ICEC grade of special engineers for design, construction and quality control areas shall be "more than 78 points from a more than 75 points by the original draft." 52% of respondents preferred to maintain the original draft. About the question of "The reason why the CM system has not been working well yet." 62% of respondents have answered that the staff members who are in charge of handling public project procurements are concerned about the fact that their roles (or activities) might be deprived as a result of CM adoption. In order for the CM system to be activated, based on the notion that the construction projects must be out soured, the reshuffle of the headquarter organization of Ministry of Land, Infrastructure and Transportation (MLIT) should be preceded.