• 제목/요약/키워드: Public Procurement of Software

검색결과 11건 처리시간 0.031초

기업 규제의 다층적 효과 연구 : 공공 소프트웨어 사업 대기업참여제한제도를 중심으로 (A Study on the Multi-Layer Effect of Regulation : Focusing on the Restriction on Conglomerate Firms' Participation in Public Software Procurement)

  • 유호석;박강민;김준연;이삼열
    • 한국IT서비스학회지
    • /
    • 제18권4호
    • /
    • pp.39-53
    • /
    • 2019
  • This article analyzes the effects of regulation that restrict the conglomerate firms to participate in the public procurement of software. The regulation was implemented in 2013, and this article analyzes five years of firm performance before and after 2013 through DID (difference-in-difference method). In particular, this article analyzes how restrictions on conglomerate firms' participation in public software procurement affect middle and small firms performance. As a result, small-size firms achieve relatively positive results in private sector revenues compared to mid-size firms. However, there was no significant difference between the mid-size and small-size firms in profit margin. This study implies that the new policy is needed to improve the small and medium-size firms revenues on the private market by leveraging the public procurement market which restricted the conglomerate firms to participate. This can be done by complementing the regulation in line with servitization paradigm.

조달청 OPEN API 빅데이터를 활용한 공공 소프트웨어 산업의 SNA 패턴 분석 (SNA Pattern Analysis on the Public Software Industry based on Open API Big Data from Korea Public Procurement Service)

  • 김소정;심선영;서용원
    • 정보화정책
    • /
    • 제24권3호
    • /
    • pp.42-66
    • /
    • 2017
  • 본 연구는 우리나라를 대표하는 개방 데이터인 조달청의 빅데이터를 활용하여, 최근 사회과학 연구에서 활발하게 사용되는 사회관계망 분석을 통해 정부의 특정 정책(소프트웨어 대기업 참여 상한제) 전후의 산업 네트워크 구조를 비교 분석함으로써 소프트웨어 시장의 생태계 변화를 조망하고 공공데이터 개방의 시사점을 살펴보는 것을 목적으로 한다. 2013년에서 2015년까지 3년에 걸쳐 공공 소프트웨어 시장의 정보화 사업에 대한 발주 및 수주 계약 데이터를 분석해 본 결과, 첫째 공공 소프트웨어 시장에서 Power Law현상이 관찰되고 있으며, 이 현상은 규제 등의 외부적 충격과 상관없이 지속되고 있음을 알 수 있었다. 둘째, 이 시장에서 Power Law현상은 지속되고 있었지만 생태계의 구성은 년도별로 유의미한 차이를 보임도 확인하였다. 이러한 결과를 바탕으로, 공공 소프트웨어 시장의 생태계 구성 및 변화에 대한 시사점을 도출하고, 근본적으로 이러한 분석을 가능케 하는 공공 빅 데이터 개방의 장점에 대해 논의하였다.

공공정보화사업 제안요청서 품질분석 : 시스템 운영 개념을 중심으로 (Quality Analysis of the Request for Proposals of Public Information Systems Project : System Operational Concept)

  • 박상휘;김병초
    • 한국IT서비스학회지
    • /
    • 제18권2호
    • /
    • pp.37-54
    • /
    • 2019
  • The purpose of this study is to present an evaluation model to measure the clarification level of stakeholder requirements of public sector software projects in the Republic of Korea. We tried to grasp the quality of proposal request through evaluation model. It also examines the impact of the level of stakeholder requirements on the level of system requirements. To do this, we analyzed existing research models and related standards related to business requirements and stakeholder requirements, and constructed evaluation models for the system operation concept documents in the ISO/IEC/IEEE 29148. The system operation concept document is a document prepared by organizing the requirements of stakeholders in the organization and sharing the intention of the organization. The evaluation model proposed in this study focuses on evaluating whether the contents related to the system operation concept are faithfully written in the request for proposal. The evaluation items consisted of three items: 'organization status', 'desired changes', and 'operational constraints'. The sample extracted 217 RFPs in the national procurement system. As a result of the analysis, the evaluation model proved to be valid and the internal consistency was maintained. The level of system operation concept was very low, and it was also found to affect the quality of system requirements. It is more important to clearly write stakeholders' requirements than the functional requirements. we propose a news classification methods for sentiment analysis that is effective for bankruptcy prediction model.

사이버안보 강화를 위한 소프트웨어 공급망 보안 정책 연구: SBOM 정책 추진 사례를 중심으로 (A Study on the Software Supply Chain Security Policy for the Strengthening of Cybersecurity: Based on SBOM Policy Cases)

  • 손효현;김동희;김소정
    • 디지털융복합연구
    • /
    • 제20권2호
    • /
    • pp.9-20
    • /
    • 2022
  • 공급망 공격은 주요기반시설을 타겟하여 피해 규모가 크고 공공 안전 및 국가안보를 위협하는 요소로 진화하고 있다. 이에 사이버안보 전략 및 정책 수립 시 공급망 위험관리를 명시하여 보안성을 제고하고 있으며, 2021년 미(美) 바이든 행정부가 발표한 국가 사이버안보 강화를 위한 행정명령에서는 소프트웨어 공급망 보안 강화를 위한 지침 중 일부로 SBOM을 언급하였다. 정부 차원에서 SBOM을 의무화하여 공급망 보안 검증 도구로 활용한다면, 향후 국내 조달체계에도 영향을 받을 수 있으며 정책 시행 경과에 따라 국내 공급망 보안 체계 수립 시에도 참고 가능할 것으로 보인다. 이에 따라 본 논문에서는 소프트웨어 공급망 보안 강화 방안으로써 SBOM 정책을 추진 중인 국가를 선정하여 관련 사례를 중점으로 분석하였다. 또한, 국외 SBOM 정책 동향의 비교·분석을 통하여 국내 SBOM 도입 시 기술, 정책, 법률측면에서의 활용 방안을 고찰하였다. 향후 공급망 무결성·투명성 검증 도구로 SBOM의 활용 가치가 기대되는바 SBOM에 대한 국제적 표준화 정립 및 정책 개발에 관한 지속적인 동향 파악과 표준 형식 개발 연구가 요구된다.

IFC 기반의 공정정보 축적을 위한 기초연구 (A Basic Study for Accumulation of IFC-based Schedule Information)

  • 송종관;최원식;원지선;김남곤
    • 한국산학기술학회논문지
    • /
    • 제14권11호
    • /
    • pp.5890-5896
    • /
    • 2013
  • 본 연구는 BIM 기반의 납품체계에서 IFC 파일의 공정정보를 축적하고 활용하기 위한 방안을 제시하였다. 이를 위해 첫 번째로, 공정정보의 활용방안에 대하여 기존연구를 분석하였고, IFC 표준을 고찰하였다. 두 번째로, 공정요소를 도출하기 위해 공정계획 수립절차를 분석하였으며, 공정프로세스와 상용소프트웨어를 분석하여 공정정보항목을 도출하였다. 또한 도출된 공정정보항목을 기반으로 IFC 스키마를 분석하여 IFC의 공정요소를 도출하였다. 마지막으로 IFC 납품파일의 축적을 위해 조달청의 시설사업 BIM 적용 기본 지침서를 분석하여 개념적인 BIM 모델의 납품프로세스를 통한 축적방법과 활용방안을 제시하였다. 본 연구는 국가적으로 진행되고 있는 BIM 도입과정에서 BIM모델의 정보를 축적하는데 기여할 것으로 기대된다.

Improvement of ITSM IT Service Efficiency in Military Electronic Service

  • Woo, Hanchul;Jeong, Suk-Jae;Huh, Jun-Ho
    • Journal of Information Processing Systems
    • /
    • 제16권2호
    • /
    • pp.246-260
    • /
    • 2020
  • IT Service Management (ITSM) achieves consolidated management for the IT services supporting the acquisition system, and no outside connections can be established with such ITSM. Issues pertaining to the D2B can be addressed to System Q&A or a Call Center for problem-solving. In other words, internal staff can take the necessary measures for problems by directly connecting with ITSM. Currently, diverse innovative technologies are being used in electronics and ubiquitous computing environments. This allows us to create a better world by providing the backbone for remarkable development in our human society in the fields of electronics, devices, computer science, and engineering. Following the expansion of IT services in the military acquisition sector such as Defense Electronic Procurement, military export/import support system, etc., customers' dependence on IT for conducting business with the military or related companies is increasing, including the military's dependence on the same technology for services to the public. Nonetheless, issues pertaining to the simplified/integrated management of complex IT service management systems, including slow system recovery, lack of integrated customer service window, and insufficient information sharing, have become the priority problems that IT managers are required to solve. Therefore, this study conducted research on the integrated management of IT services provided by Korea's national defense acquisition system, which was developed based on the existing system IT Infrastructure Library (ITIL) v2, and investigated the level of satisfaction with services with focus on ensuring that it can be used for understanding the necessity of the system and its advancement in the future.

유지보수 및 자산관리를 위한 시공단계 정보 활용에 관한 연구 (A Study on Establishing Facility and Asset Information from Construction Phase)

  • 배영민;곽길종;김수정;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.529-532
    • /
    • 2003
  • 유지보수 단계는 설계단계에서 계획되고 시공단계에서 확보된 자산적 가치를 지속하는 건물수명주기상의 한 단계이다. 건물의 대형화 및 기능의 복합화 추세가 확대되면서 유지보수 단계의 중요성은 성능관리, 안전관리, 자산관리 등의 다양한 관점에서 더욱 증대되고 있다. 최근 들어 체계적인 시설물의 정보관리 및 정보기술의 적용을 통해 이러한 관리 목적의 달성과 유지보수에 관련한 제반 운영활동 및 비용의 효율성을 확보하려는 노력이 전개되고 있다. 건물의 유지 보수에 있어서 핵심이 되는 기본정보는 준공된 시설물을 구성하는 세부요소에 대한 정보로, 설계 및 시공단계에서 생성된 정보를 적절히 변환함으로써 구축될 수 있다. 그러나 현재 유지보수 단계에서 활용되는 정보시스템에서는 건물 및 시설에 대한 정보가 선행단계와는 단절되어 새로이 생성, 구축될 수 있다. 또한 자산관리 관점에서 볼 때 시설물자산을 구성하는 구조체, 설비 등의 자산내역은 그 가치의 변동이 상이하므로, 이를 합리적으로 반영하기 위해서는 시공단계의 비용 또는 가격을 정확하게 배부, 반영하여 자산내역의 최초 가액을 산정할 필요가 있다. 본 연구는 자산관리의 측면 및 수명주기에 따른 정보의 연계성 확보측면에서 시공 단계에서 발생하는 시설물의 세부요소 및 비용정보를 유지 보수 단계에서 활용할 수 있는 정보모델을 개발, 제시하고자 한다.

  • PDF

생성형 인공지능 시대 지방정부의 역할에 대한 연구: 경기도, 서울시, 뉴욕시 사례연구를 바탕으로 (A Study on the Role of Local Governments in the Era of Generative Artificial Intelligence: Based on Case Studies in Gyeonggi-do Province, Seoul City, and New York City)

  • 이수재;김종배
    • 문화기술의 융합
    • /
    • 제10권3호
    • /
    • pp.809-818
    • /
    • 2024
  • 본 논문은 공공영역에서의 인공지능 기술 적용 사례분석을 통해 지방정부가 사전에 고려해야 할 실천방안을 제안한다. 공공영역에 인공지능 기술을 적용한 사례분석을 위해 국내에는 경기도와 서울시, 그리고 국외에는 미국의 뉴욕시를 대상으로 분석하였다. 본 논문에서 인공지능 기술 적용에 따른 실천방안 분석을 위해 AI Localism 분석 도구를 사용한다. AI Localism 분석도구는 인공지능 기술을 공공영역에 적용 및 확산함에 있어 사전에 지방정부가 인공지능 기술의 적용 원칙 및 권리, 공공조달, 참여, 법률과 정책, 책임과 감독, 투명성, 그리고 문해력의 7개 영역에 대해 정책적으로 분석하는 도구이다. 본 논문에서는 각각의 영역에서 지방정부가 시행하고 있는 인공지능 기술 적용사례를 분석하고, 사례분석을 바탕으로 지방정부가 생성형 인공지능 시대를 주도하기 위해 보완하거나 마련해야 할사항들을 법·제도와 정책, 공공조달, 상호협력, 시민참여 분야로 나누어서 실천방안을 제안한다. 제안한 공공영역에 실천방안들을 통해 생성형 인공지능 시대에서 지방정부가 대국민 공공영역에 적용함으로써 신뢰하고 선도할 수 있는 지방공공 행정서비스 제공이 가능할 것이다

활용성을 고려한 BIM 설계 오류 검증시스템 개발 (Development of an Verification System for Enhancing BIM Design Base on Usability)

  • 양동석
    • 토지주택연구
    • /
    • 제8권1호
    • /
    • pp.23-29
    • /
    • 2017
  • The BIM design is expected to expand to the domestic and overseas construction industries, depending on the effect of construction productivity and quality improvement. However, with the obligation of Public Procurement Service to design the BIM design, it includes a design error and the problem of utilization of 3D design by choosing a simple 2D to 3D remodelling method that can not be modelled in 3D modeling or use of the construction and maintenance phases. The results reviewed by BIM design results were largely underutilized and were not even performed with the verification of the error. In order to resolve this, one must develop the check system that secures the quality of BIM design and ensure that the reliability of BIM results are available. In this study, it is designed to develop a program that can automatically verify the design of the BIM design results such as violation of the rules of the BIM design, design flaws, and improve the usability of the BIM design. In particular, this programs were developed not only to identify programmes that were not commercially available, but also to validate drawings in low-light computer environments. The developed program(LH-BIM) store the information of attribute extracted from the Revit file(ArchiCAD, IFC file included) in the integrated DB. This provides the ability to freely lookup the features and properties of drawings delivered exclusively by the LH-BIM Program without using the Revit tools. By doing so, it was possible to resolve the difficulties of using traditional commercial programs and to ensure that they operate only with traditional PC performance. Further, the results of the various BIM software can be readily validated, which can be solved the conversion process error of IFC in the case of SMC. Additionally, the developed program has the ability to automatically check the error and design criteria of the drawings, as well as the ability to calculate the area estimation. These functions allow businesses to apply simple and easy tasks to operate tasks of BIM modelling. The developed system(LH-BIM) carried out a verification test by reviewing the review of the BIM Design model of the Korea Land & Housing Corporation. It is hoped that the verification system will not only be able to achieve the Quality of BIM design, but also contribute to the expansion of BIM and future construction BIM.

BIM기반 건축물 수선교체비 산정 프로세스 (BIM-based Repair&Replacement (R&R) Cost Estimating Process)

  • 박지은;유정호
    • 한국건설관리학회논문집
    • /
    • 제17권2호
    • /
    • pp.31-38
    • /
    • 2016
  • 건설사업비 중 건축물의 유지관리비용이 차지하는 비중이 초기투자비만큼이나 상당하며 국내의 경우 건설공사의 생애주기비용(LCC)관점에서 설계VE검토 업무를 시행하고 있다. 건설산업의 정보화와 고도화 급속히 진행됨에 따라 BIM에 대한 관심이 고조되고 있다. 2012년부터 조달청은 500억원 이상인 공공공사에 BIM적용을 의무화를 시작으로 2016년부터 조달청이 발주하는 모든 공공공사에 BIM적용이 의무화된다. 건축설계의 패러다임이 2D방식에서 3D, 데이터관리 관점의 BIM으로의 전환이 정책적으로 이루어지고 있는 환경에서, LCC측면에서의 BIM활용에 대한 연구는 미흡한 실정이다. 특히, LCC분석 요소 중 하나인 수선교체비 산정을 위한 BIM 소프트웨어는 부재하며 상용화된 BIM저작도구에서 수선교체비 산정을 위한 정보의 전달이 부족하다. 따라서 본 연구에서는 데이터 표준 포맷인 IFC기반 수선교체비 산정을 위한 프로세스를 제안한다. 먼저, 현재 존재하는 수선교체 기준을 분석하고 BIM기반 수선교체비 산정 요구정보를 정의한다. 정의된 요구정보는 각 정보에 해당하는 IFC를 통해 추출되고, BIM기반 수선교체비 산정 요구정보 DB에 저장된다. 이는 외부 DB인 수선교체기준DB와 단가DB와 연계하여 수선교체비를 산정한다. 본 연구가 제시하는 프로세스를 통해 BIM환경에 대응하여 BIM모델을 활용한 수선교체비 산정의 효율화를 기대하며 수선교체비 뿐만 아니라 초기공사비, 에너지비용, 유지관리비용에 이르기까지 향후 LCC분석 요소에 확장하여 적용이 가능할 것이며 BIM기반 LCC분석의 표준화에 기여할 수 있다.