The Effect of Project Managers' Competences on Performance in Public S/W (공공 S/W 분야에서 프로젝트 관리자의 역량이 성과에 미치는 영향)

  • Oh, Minjeong;Ju, Hyoungjun;Lee, Minho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.230-239
    • /
    • 2021
  • There is a growing interest in project management knowledge, project management information systems, and process improvement to systematically project execution in public sectors, achieve high performance and value, and increase the effectiveness of the overall industry. In particular, the software industry is a knowledge-intensive industry centered on professional manpower. This study examines the effect of the project managers' competences of regional SW promotion agencies on and project performance and the moderating effect of the level of project management maturity. We collected data using a questionnaire to the project managers of regional SW promotion agencies. In this study, a structural equation model was used to analyze the relationship between project managers' competences and performance. In addition, a multi-group structural equation model was used to analyze the moderating effect according to the high and low project maturity. As a result of the analysis, it was found that only contextual competence among the competences of the project manager had a positive effect on project performance. It was found that technical and behavioral competence did not have a positive effect on management and completion performance. It was found that the moderating effect according to the maturity of business management of local institutions was not significant.

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

The Study for Cloud-native Application of Public Sector Information System on Considerations during Project Execution (공공부문 정보시스템의 클라우드 네이티브 적용을 위한 적합성 검토방안 및 사업진행 시 고려사항에 대한 연구)

  • Jin Won Choi;Eun Suk Lee
    • Journal of Information Technology Services
    • /
    • v.23 no.1
    • /
    • pp.27-35
    • /
    • 2024
  • In accordance with the cloud conversion of public sector information systems and the implementation of cloud native introduction policies, review items were presented to review the cloud native of information systems for stable and efficient cloud native deployment. By presenting cloud native considerations when promoting a project, we propose a plan to flexibly respond to policy and business changes and improve development quality and productivity to operate cloud services stably. In order for information project managers to switch to a cloud-native-based information system in order to efficiently utilize the cloud as a cloud, they must decide whether to introduce cloud-native through suitability review questions and sufficiently review development and operation costs and efficiency to promote the project. As a result of conducting a focus group interview (FGI) with a council of cloud native experts, there was an opinion that information systems can be operated in a cloud-native manner even with a monolithic structure. By fully considering the circumstances of each system, development quality and productivity, we expect to be able to operate improved to provide a stable cloud service.

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF

Structural Equation Model for Information Technologization Success Index(ITSI) of Small and Medium Enterprise (구조방정식 모델을 이용한 중소기업의 IT화 성공지수(ITSI) 개발 연구)

  • Kim, Jung-Geon;Moon, Tae-Hee;Sohn, So-Young
    • IE interfaces
    • /
    • v.17 no.3
    • /
    • pp.338-348
    • /
    • 2004
  • OECD countries including Korea positively adopt performance-based budget systems which convert an input-centered system to an output-centered system to solve two baffling problems: public expense retrenchment and efficiency recovery of government management. Output management of IT project propelled in public sector becomes a prominent figure influenced by these keynote of policy. However, it is placed in difficult circumstances to develop a performance index and the methodology to cover characteristics of IT project, measuring the goal achievement of business and the customer contentment according to the phases of business progress. Existing studies of IT project accomplishment measurement have been fulfilled on the subject of business targeting on IT technology application, administrative information network business and national base of information network construction. Most of the studies have been executed using BSC or AHP to reflect synthetically business specifics of IT project from a methodological point of view. In this study, we propose a structural equation model (SEM) to develop a performance index which measures the outcome of IT project according to the phases of business progress, avoiding a simple presentation of project outcome or conceptual frame. The proposed SEM is applied to the survey results of "IT support project for Small and medium business". Based on the fitted model, we apply ACSI concept to develop an Information Technologization Success Index (ITSI). This index allows us comparison of several IT vendors as well as feedback information for further improvement.

Prediction of the Shelter Dog Outcome using Machine Learning Models (머신러닝을 이용한 유기견 안락사 예측)

  • Lee, Ye-Seol;Lee, Se-Hoon;Keane, John
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2020.07a
    • /
    • pp.301-302
    • /
    • 2020
  • The number of abandoned dogs were increasing every year in South Korea. However, many dogs are euthanized in the shelter because of the lack of budget. This project predicts euthanasia of abandoned dogs using machine learning algorithm. It collects data from the public data portal where Korea government provides a public dataset as a form of open API. This project uses recent three-year data 2017 to 2019 and 263371 cases were founded. This project implements random forest and logistic regression models. This project attained an average 72% of prediction accuracy.

  • PDF

INTRODUCTION OF THE SIMC PROJECT

  • Chae, Gee-Ju;Cho, Seong-Ik;Park, Jong-Hyun;Jo, Kwan-Bok
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.356-359
    • /
    • 2006
  • The high prices and lack of information for satellite images prevent researchers from studying remote sensing and most non-professional people can't have the simple and easy solutions for the manipulation of satellite images. 'Satellite Imagery Information Management Center'(SIMC) project which is promoted by ETRI (Electronics and Telecommunications Research Institute) from 2002 to 2005 in Korea have the purpose to provide the satellite images freely to the public domain and the solutions for the above mentioned problems. Our project have the following five systems; Data Acquisition System, Data Preservation System, Integrated Solution System, Technology Development System, Operation Plan System. Data Acquisition System collects the satellite images such as LANDSAT, IKONOS, etc. Data Preservation System consists of database which registers the diverse satellite images. Integrated Solution System gives the user of public domain for the web service which search, order and transfer the satellite images. Technology Development System has the many processing technologies for the satellite images. Finally, the Operation Plan system has the role to plan the future of our SIMC project. In this paper, we will give the result of SIMC Project for each five systems during the fast four years from 2002 to 2005.

  • PDF

A Case Study on the Cost-Effectiveness Analysis for the Feasibility Study of Public Project Related to Personal Information Protection (개인정보보호 관련 공공사업의 타당성 조사를 위한 비용효과분석 사례 연구)

  • Jo, Illhyung;Kim, Jin;Yoo, Jinho
    • Knowledge Management Research
    • /
    • v.20 no.3
    • /
    • pp.91-106
    • /
    • 2019
  • In the era of the 4th Industrial Revolution, the importance of information protection is increasing day by day with the advent of the 'hyper-connection society', and related government financial investment is also increasing. The source of the government's fiscal investment projects is taxpayers' money. Therefore, the government needs to evaluate the effectiveness and feasibility of the project by comparing the public benefits created by the financial investment projects with the costs required for it. At present, preliminary feasibility study system which evaluates the feasibility of government financial investment projects in Korea has been implemented since 1994, but most of them have been actively carried out only in some fields such as large SOC projects. In this study, we discuss the feasibility evaluation of public projects for the purpose of information security. we introduce the case study of the personal information protection program of Korean public institutions and propose a cost-effectiveness analysis method that can be applied to the feasibility study of the information protection field. Finally, we presented the feasibility study and criteria applicable in the field of information security.

A Study on the Characteristics of "Early Contractor Involvement Method" in Public Project in Japan

  • Tamura, Atsushi
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.42-49
    • /
    • 2022
  • In recent years, Owner, Architects, and Contractor are increasingly collaborating with each other from pre construction phase in construction projects, which is called Early Contractor Involvement (ECI). In Japan, the ECI method has been introduced in several public building projects since 2015. The purpose of this study is mainly to clarify the characteristics of the ECI method in Japan and to compare the contract clauses of the ECI method in the UK and the USA. The results of the survey are as follows. (1) the ECI method was supposed to make it possible to achieve appropriate quality, cost, and construction period by reflecting Contractor's technology and know-how in the design documents and specifications. (2) According to the database, there were 27 cases of the ECI method in Japan from 2015 to 2021, of which 13 cases for which bidding information could be obtained had a variety of technical proposals, mainly VE proposals, depending on the project characteristics. (3), Japan's ECI method has very much in common with SBC + PCSA in the UK. On the other hand, ECI Method in Japan differs from in the UK in that Owner, Architect, and Contractor enter into a partnership agreement, which is similar to ConsensusDocs CD541 in the USA. (4) The ECI method in Japan has the following problems: Owner depends on Contractor for cost control, the division of roles among project members is complicated, and more work from Owner than the DBB method are required.

  • PDF

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.