• Title/Summary/Keyword: Public Construction

Search Result 2,512, Processing Time 0.027 seconds

Ripple Effect Analysis of Construction Standard Unit Price in Public Construction (공공건설공사 표준시장단가 적용 파급효과 분석)

  • Jin, Zheng-Xun;Baek, Seung-Ho;Lee, Ju-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_3
    • /
    • pp.1207-1219
    • /
    • 2022
  • 「Act On Contracts To Which The State Is A Party」 stipulates that the "Construction Standard Production Rate" and "Construction Standard Unit Price" be used as the criteria for determining the estimated price of construction works performed by public institutions. In this regard, issues such as the application scope of the Construction Standard Unit Price, and the effect of budget reduction continue. However, due to the lack of quantitative data on the actual application of Construction Standard Unit Price, it is difficult to objectively evaluate various issues. In order to prepare data for objective evaluation of the Construction Standard Unit Price, this study analyzed the ripple effect of applying the Construction Standard Unit Price based on the bill of quantity. As a result of the analysis, the Construction Standard Unit Price ripple effect in the civil engineering part was 9.2%, and it was analyzed that there was a ripple effect of about 1.9% based on the civil engineering direct cost. In the construction part, the ripple effect was analyzed to be relatively high at 17%, but it was found to have a ripple effect of about 3% in the construction direct cost. Based on the total direct cost, the ripple effect was calculated as 2.2%. Based on the analysis results, it is possible to evaluate the effect of applying the Standard Market Unit Price, and it is expected to be used as basic data to solve issues. As a future study, it is necessary to additionally analyze the ripple effect by Standard Market Unit Price application range (over 10 billion, over 20 billion won, etc.) and delivery system type (comprehensive evaluation, qualification examination, technical bidding, etc.). In addition, it is necessary to study the appropriate ripple effect of the Standard Market Unit Price.

A Study on the Plan of Construction of Cooperating Crime Prevention System between Public Police and Private Security of Korea (공경비와 민간경비의 협력방범체제 구축방안)

  • Lee, Sang-Won
    • Korean Security Journal
    • /
    • no.6
    • /
    • pp.67-101
    • /
    • 2003
  • This study presents a plan of construction for cooperating crime prevention system between public police and private security to provide positive safety, and crime prevention activity for clients. A method of this study, this paper used statistics analysis and literature study. This study, an introduction is at the chapter I , a role of public police and private security at the Chapter II, the realities of private security industry of korea at the Chapter III, the police service relating with private security and operating realities at the ChapterIV, the problems and a plan of construction for co-operating crime prevention system at the ChapterV, and conclusion at the ChapterVI. In conclusion, It is needed a public information strategy, partnership between the police and guard, establishment of special office for private security, and the improvement of the quality in security corporation.

  • PDF

Enhancing Value of Public Construction Projects by Improving Contract Review Process

  • Song, Sang-Hoon;Bang, Jong-Dae;Cho, Gun-Hee;Sohn, Jeong-Rak;Jung, Sang-Ho
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.479-489
    • /
    • 2011
  • This study aims to suggest the method to enhance the value of public construction project during contract review process considering budget reduction for project profit and public interest enhancement simultaneously. The main results of this study are as follows: (1) Current method are considered to be improved from the point that cost reduction through current method could influence performance of the object of contract without conforming to user requirements or facilities' function. (2) In order to supplement current process, the method to evaluate the variation of performance and value was established based on facility type, participants on each phase, and their requirement. (3) Case study was conducted to verify suggested method, and showed the successful application in enhancing the value of construction projects on public sector.

Analyzing the Engagement of Professional Construction Managers in Construction Management firm and Its Improvement Measures (CM 전문회사 단장 활용실태 및 개선방안)

  • Son, Chang-Baek;Huh, Young-Ki;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.87-95
    • /
    • 2013
  • The number of construction management firms has been increased as construction management delivery system has been active in Korean construction market. the capability of leading construction management professional, who is responsible for managing project administration, is important for commissioning construction management contracts. The quality of project proposal and the capability of leading construction management professional, which are assessed by the board of contract awarding committee, are the major contributors for commissioning the public construction management projects administered by the Korean public procurement service for contracting. Therefore, employing a very competent leading construction management professional is the critical strategy for awarding contract to the construction management firms' part. That is why the firms should secure a fixed number of leading construction management professional in a waiting list to proceed the contract commissioning process for expectant candidate projects, even if there is no project assignable to the leading construction management professionals. However, a measure that makes effectively use of the leading construction management professional in a waiting list has not been systematically implemented in the firms. In turn, the firm suffers considerable loss in a project personnel supply and demand plan. Expert opinions were obtained by the survey questionaries administered to top management of the construction management firms which are engaged in the construction management contracts for commissioning the public construction management projects administered by the Korean public procurement service either as principal or co-principal deliverer. This paper presents the findings obtained by investigating the actual employment state of the leading construction management professional in the waiting list and by analyzing the issues involved in mobilizing and demobilizing them. It contributes to implement a practical guide for searching effective solutions to the issues.

A Research for Clustering of Conflict in Public Construction Project (군집분석을 통한 공공 건설사업 갈등 유형화 연구)

  • Lee, Jiseop;Kim, Doyun;Lee, Changjun;Lee, Jeonghun;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.61-72
    • /
    • 2018
  • Conflicts in public construction projects lead to increase social costs as well as construction costs and schedule delay. Therefore, it is important to evaluate the conflict in construction project and find appropriate solutions based on previous cases. In this research, the conflict factors and criteria for evaluating conflict are derived and 30 cases are evaluated by 11 conflict experts. Using k-means clustering, the cases are clustered by three clusters. The cases were analyzed according to the characteristics of each cluster and labeled as 'NIMBY and harmful facility conflict cluster', 'environmental and pollution conflict cluster', and 'PIMFY and small conflicts'. In the future, when conflict occurs in the public construction projects, the conflict can be evaluated using this clustering and the characteristics of the conflicts can be found. As a result, it will be helpful to mitigate the conflict quickly and effectively by looking for previous cases that are suitable for resolving the conflict through appropriate clusters.

The Application Technology of Korean-style R&D in Verification for deploying the Neo-Korean Style Public Building - Focused on the positivistic case R&D Technologies in Neo-Korean Style Public building

  • Kim, Young-Hoon;Peck, Yoo-Jung;Park, Joon-Young
    • KIEAE Journal
    • /
    • v.17 no.1
    • /
    • pp.5-13
    • /
    • 2017
  • Purpose: This study, by comprehensively the characteristics of new Hanok application techniques with the proposed site application technology in the course of the design changes that have been accumulated through Hanok technology development the second stage business, by analyzing the range of reflection, new Considering the direction reflects the efficiency of the new Hanok application techniques. Method: new Hanok application technology, it was been established through research and development of large 1 new Hanok technology it has been proposed through the "site-specific application techniques" and 2 builders and designers "space-time proposed technique" Analysis of the case, at the center of the design changes, the land the body of laws and regulations, the requirements of the public buildings, compared to the construction method and the like for the reduction of construction costs, new Hanok applied technology in the process of change by it There was analyzed whether acceleration on the range and step which is reflected in the design Result: The result of new Hanok applied technology was built through the demonstration build business case, process another major technology, foundation, woodwork, walls, roof, has been reflected in the ceiling construction, the inclusion of items in the proposed technique of construction , it was applied to the main steps in general, except for other construction work landscaping. Application techniques and construction proposal technology research team has presented, show the difference between the scope and method. With significance effort to improve the unreasonable traditional methods of these core processes that can be reflected in the field repeated the construction proposed technique as a result of the utility that can be applied for substantial construction.

An Innovative Public Project Process Management For the Government Owner (발주자 입장에서 바라본 혁신적인 관급공사 관리 프로세스 제시를 위한 기초 연구)

  • Kim, Sung-Won;Kim, Dea-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.557-562
    • /
    • 2008
  • In Korean construction industry, a public sector's ordering volume has been constantly increased after 2000. But, because a cost, schedule and quality control generally depends on a result-centric management form and a transparent management is not done during the construction in the Korean public business, it is recognized that this causes problems including an increase of cost and schedule, incomplete construction, a difficulty to find the problem in advance to establish measures, and an unclear locus of responsibility of constructor, supervisor and designer. Accordingly, this study is intended to derive the problems and the limit of management by identifying and analyzing the management state of the present government construction client for the client organization of public sector's government construction. Also, the study is intended to contribute to the client's efficient and actual project management by presenting the model of supplementing or improving the derived problem and limits to the client's organization.

  • PDF

Implementable Strategy on Asset Management of Domestic Public Rental Housing (국내 공공임대주택의 자산관리 도입 방안)

  • Shin, Yoon-Seok;Cho, Hun-Hee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.103-110
    • /
    • 2009
  • Recently, maintenance of public rental housing becomes a critical issue because its expenditure possesses the majority proportion of life cycle cost. The countries, such as USA and Singapore, have introduced the approaches for advanced property management, which are cost-effective in the maintenance management. However, as maintenance management system becomes advanced, risks associated with its application are also increased. Therefore, it is needed to assess the appropriate applicability of public rental housing maintenance management considering the constrains in domestic construction industry. The main objective of this study are to investigate international cases and systems and to propose strategic introduction, which satisfies the regulations and policies for domestic public rental housing. In order to evaluate the suitability of the investigated systems, practitioners' opinions were reviewed through the questionnaire surveys using analytic hierarchy process (AHP). The surveys indicate that advanced asset management was the suitable process for managing efficiently domestic public rental housing. Moreover, the results showed each weights of considerable criteria for assessing the effective application of maintenance management, and would contribute to further detailed and systematic management.

The Needs for Training Manpower and the Change in Construction Environment by Equipment Based BIM Design (설비분야 BIM 설계에 따른 건축환경 변화와 인재양성의 필요성)

  • Kim, Jong-Hwan
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.14 no.4
    • /
    • pp.157-165
    • /
    • 2011
  • The study figures out the alternatives of training BIM design experts which is the biggest obstacle in training manpower of professional BIM designer, the largest problem when the plant introduce BIM design about the change in Construction Environment by Equipment Based BIM Design in reality of design followed by equipment based BIM design, education institution plan. BIM is the system which is built to make these information be used easier and technique which enables design construction and maintenance in 3-dimensional virtual space by designing buildings in 3-dimensional space, and by data-basing the generated information of every life-cycle information. As the essential contents of the study, educational institutions with the public authority should invest the opening of educational programs, recruit of experts and development of textbooks from a long-term perspective. And also, the role of public institution is important above all for the development of construction industry.

Noise Isolation Method at Construction Site (건설공사장 소음방지 대책)

  • Jung, Gab-Cheol
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2000.06a
    • /
    • pp.940-948
    • /
    • 2000
  • Noise and vibration generated at construction sites become serious issues because of bigger construction projects and growing use of heavy equipment. Especially in downtown construction, noise and vibration easily exceed the legal standards that can suffer the most of surrounding residents. The number of complaints by the residents who are exposed to the noise increases as their consciousness grows. However, the Korean regulations for the construction noise and vibration only present the overall limits for target areas and times zones, and this make it difficult to take effective measures. Also in rural area, disputes between construction sites and residents arise, but the dispute resolution or taking measures are difficult because clear standards concerning cause-and-effect, estimation of effective levels, calculation of damages, and future precautions and examples lack. This paper describes legal standards regarding the noise and vibration and presents judging standards for the physical damages. This paper also introduces example public complaints that happened at Daewoo construction sites to describe the problems in the existing law and further to enable smooth construction progresses by emphasizing the seriousness of public complaints.

  • PDF