• Title/Summary/Keyword: Protective Coordination

Search Result 119, Processing Time 0.022 seconds

The Online Protective Coordination Schemes of the Distribution Systems with Distributed Generation (분산전원이 연계된 배전계통의 온라인 보호협조 방안)

  • Choi, Joon-Ho;Ro, Kyoung-Soo;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.3
    • /
    • pp.132-141
    • /
    • 2007
  • Recently, there has been growing interest in distributed resources with high-energy efficiency due to the increasing energy consumption and environmental pollution problems. But an insertion of new distributed generation to existing power distribution systems can cause several problems such as voltage variations, harmonics, protective coordination, increasing fault current etc. In this paper, a new method of the fault location identification at the distribution system with distributed resources, which can be determined by the magnitude and direction of the fault current, is proposed. In addition, a new online protective coordination scheme of recloser-sectionalizer is proposed based on the proposed fault location identification method for distribution system with distributed resources.

Optimal Setting of Overcurrent Relay in Distribution Systems Using Adaptive Evolutionary Algorithm (적응진화연산을 이용한 배전계통의 과전류계전기 최적 정정치 결정)

  • Jeong, Hee-Myung;Lee, Hwa-Seok;Park, June-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.9
    • /
    • pp.1521-1526
    • /
    • 2007
  • This paper presents the application of Adaptive Evolutionary Algorithm (AEA) to search an optimal setting of overcurrent relay coordination to protect ring distribution systems. The AEA takes the merits of both a genetic algorithm (GA) and an evolution strategy (ES) in an adaptive manner to use the global search capability of GA and the local search capability of ES. The overcurrent relay settings and coordination requirements are formulated into a set of constraint equations and an objective function is developed to manage the overcurrent relay settings by the Time Coordination Method. The domain of overcurrent relays coordination for the ring-fed distribution systems is a non-linear system with a lot of local optimum points and a highly constrained optimization problem. Thus conventional methods fail in searching for the global optimum. AEA is employed to search for the optimum relay settings with maximum satisfaction of coordination constraints. The simulation results show that the proposed method can optimize the overcurrent relay settings, reduce relay mis-coordinated operations, and find better optimal overcurrent relay settings than the present available methods.

A Study on the Overcurrent Relay Coordination in Power Systems (전력계통에서의 과전류계전기 보호협조에 관한 연구)

  • Choi, Hong-Kyoo;Kim, Kyung-Chul;Oh, Jung-Suk;Kim, Byung-Chul
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.11a
    • /
    • pp.351-358
    • /
    • 2004
  • When fault occur in power systems, the protective relay plays a roles of protecting power system according to its setting values. There, it is very important that the protective relay have high selectivity performance in power system by correct setting the relays. This paper analyzed protect device protect cooperation or Transient stability and apply to Overcurrent relay in the real power system operation environment by using EDSA Program.

  • PDF

Application of Multi-Agent System to Over Current Protective Relaying System (과전류 보호계전 시스템에의 Multi-Agent System 응용)

  • Chang, Choong-Koo;Min, Byung-Un;Lee, Seung-Jae
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.209-211
    • /
    • 2000
  • This paper presents a Multi-Agent system for setting and coordination of overcurrent protective devices in the distribution system. The simulation model shows its feasibility in which KQML is used for communication among agents. The proposed system could make it possible to keep the protection system in the optimal state all the time.

  • PDF

A Study on the Effective Coordination Scheme of Recloser for the Conventional Distribution System Interconnected Dispersed Generation (배전계통에 분산전원 연계시 기존 배전 계통측의 효과적인 리클로저 보호협조 연구)

  • Jung, Seung-Bock;Kim, Jae-Chul;Moon, Jong-Fil;Yun, Sang-Yun;Choi, Joon-Ho;Bae, Joo-Chun
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.533-535
    • /
    • 2002
  • In Korea, power requirement has been increasing. But the large generation unit is hardly installed because of economic and environment problem. Therefore, the concern of dispersed generation system(DGS) is growing. The power distribution system is generally operated with radial type. The protection system is composed of one directive source. But power distribution system inserted DGS changes it to two directive source system. Therefore, the insertion of DGS has the problem of protection coordination. In this paper, we argue fault current affected by interconnected DGS. We analyze fault current flow affected by DGS placement. Then, we find protective coordination problem. Consequently, we study advance point for protection scheme of power system interconnected DGS.

  • PDF

Analysis of Recloser-Fuse Coordination in Distribution System with SFCL (배전계통에 초전도 전류계한기 적용 시 Recloser-Fuse 협조 분석)

  • Kim, Myoung-Hoo;Kim, Jin-Seok;You, Il-Kyoung;Moon, Jong-Fil;Lim, Sung-Hun;Kim, Jae-Chul;Ahn, Jae-Min
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.05a
    • /
    • pp.432-435
    • /
    • 2009
  • This paper shows us the basic protective devices to protect against fault current such as recloser and fuse. Also recloser has been coordinated with fuse in distribution system to protect against fault current efficiently. However, in distribution system with SFCL, recloser-fuse coordination could be different to now and fault current couldn't be clear, if occurred. Therefore, this paper analysed recloser-fuse coordination in distribution system with SFCL using PSCAD/EMTDC

  • PDF

A New Strategy for Service Restoration and Switching Sequence Determination in Distribution Automation Systems

  • Lee, Seung-Jae
    • Journal of Electrical Engineering and information Science
    • /
    • v.3 no.1
    • /
    • pp.51-57
    • /
    • 1998
  • As DAS becomes a common practice, various operational tools are needed. This paper proposes the new restoration strategy considering the coordination of the protective devices and the generalized method for determining the switching sequence. The effectiveness of the proposed method has been tested on the various real systems.

  • PDF

Influences of the Length of Connecting Leads on the Energy Coordination in Coordinated SPD Systems (협조된 SPD시스템에서 접속선의 길이가 에너지협조에 미치는 영향)

  • Lee, Bok-Hee;Shin, Hee-Kyung
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.6
    • /
    • pp.91-98
    • /
    • 2014
  • For the purpose of designing and applying the optimum surge protection scheme, multi-stage coordinated surge protective device(SPD) system is suitable to successfully fulfill its tasks; first, to divert a large amount of the transient energy, second, to clamp the overvoltage to the level below the withstand impulse voltage of the equipment to be protected. The length of SPD connecting leads shall be as short as possible. Long connecting leads will degrade the protection effect of SPDs. In this paper, the influences of the length of connecting leads on the energy sharing in a coordinated SPD system were investigated experimentally, and the simulation of determining the energy sharing and protection voltage level of each SPD depending on the length of connecting leads was carried out by using P-spice program. It was confirmed that the protection voltage level and energy sharing in coordinated SPD systems are strongly influenced by the length of connecting leads.

A Study on the Overcurrent Relay Modeling and Protective Coordination for Overload in Domestic AC Electrical Railway System (국내 교류 전기철도 급전계통 보호용 과전류 계전기 모델링 및 과부하 보호 협조에 관한 연구)

  • Kim, Hyun-Dong;Cho, Gyu-Jung;Huh, Seung-Hoon;Kim, Chul-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.7
    • /
    • pp.1121-1127
    • /
    • 2016
  • In this paper, modeling of overcurrent relay(OCR) to protect domestic AC electric railway Auto Transformer(AT) feeding system and operation characteristic analysis on overload condition are described. The target system of this paper is actual site where overload trip of circuit breaker occurs frequently. Because this AT feeding system is made of parallel single track which had a load(electric train) respectively, and is connected with only T phase of Scott Transformer. In addition, this system has been feeding 66kV voltage by KEPCO, not 154kV. We focus on protective coordination of Scott Transformer primary side and secondary side OCR for Korea single track AC electrical railway system in operation currently. We modeled single track AT feeding system and OCR. Also we performed faults and overload analysis for verification of OCR's setting values and system modeling. To analyze above mentioned research, we used PSCAD/EMTDC software tool.

Evaluation Method for Protection Coordination of PV Systems Interconnected with Primary Feeders (태양광전원이 연계된 고압배전선로의 보호협조 평가 방안에 관한 연구)

  • Kim, Byungki;Kim, Sohee;Ryu, Kyungsang;Rho, Daeseok
    • Journal of the Korea Convergence Society
    • /
    • v.2 no.4
    • /
    • pp.29-37
    • /
    • 2011
  • Dispersed generation (DG) such as wind power (WP) and Photovoltaic systems (PV) that has been promoted at the national level recently is mainly being introduced into distribution systems adjacent to consumers because it is generation on a small scale when compared to current generation. Due to its characteristics, DG can be operated by interconnection with distribution systems to present security of more stable power and efficient use of power facilities and resources. Problems on protection coordination of distribution systems by reverse flow of DG can roughly be divided into three possibilities: excess in rated breaking capacity (12.5KA) of protective devices by a fault in DG current supply, failure to operate protective devices by an apparent effect that can occur by reduction in impedance parallel circuit fault current due to interconnection of DG, and malfunction of protective devices by interconnection transformer connection type. The purpose of this study is to analyze problems in protection coordination that can occur when DG is operated by interconnection with distribution systems by conducting modeling and simulations by using theoretical symmetrical components and MATLAB/SIMULINK to present methods to improve such problems.