• 제목/요약/키워드: Protective Coordination

검색결과 119건 처리시간 0.026초

고장계산 및 보호협조 판정 소프트웨어 개발 (A Development of Software about Short-circuit Calculation and Protective-coordination)

  • 박성찬;최장흠;서정민
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.159-162
    • /
    • 2002
  • A software, called touch-one, is developed about the determination of short-circuit values and protective co-ordination in power system. The used solution algorithm reviewed intensively, and the protective co-ordination determination technique presented by using the circuit-breaker's current-limitation characteristic. The protective coordination concerns the behaviour of two devices placed in series in an electrical network, with a short-circuit downstream circuit-breaker. It has two basic principles: First, discrimination which is an increasing requirement of low voltage electrical distribution systems. Second, which is less well known: cascading, which consists of installing a device, whose breaking capacity is less than the three-phase short-circuit current at its terminals and helped by main circuit-breaker. With this software, we can construct a electric-power system which is reliable and economic according to user's purpose.

  • PDF

반주기 이후 동작 하이브리드 초전도 전류제한기와 보호기기 협조 분석 (Analysis on the Protective Coordination with Hybrid Superconducting Fault Current Limiter)

  • 김진석;임성훈;김재철;최종수
    • 전기학회논문지
    • /
    • 제60권10호
    • /
    • pp.1832-1837
    • /
    • 2011
  • The fault current has increased due to the large power demand in power distribution system and network distribution system. To protect the power system effectively from the increased fault current, the superconducting fault current limiter (SFCL) has been notified. However, the conventional SFCL has some problems such as cost, operation, recovery, loss. To solve some problems, the hybrid superconducting fault current limiter using the fast switch was proposed. However, hybrid SFCL also has a problem that is protection coordination in power distribution system with hybrid SFCL. In this paper, the fault current limiting characteristics of hybrid SFCL with first half cycle non-limiting operation according to the fault angle, the resistance of superconducting element, and the magnitude of Current Limit Resistor (CLR) which are the components of hybrid SFCL were analyzed through the experiments.

22.9kV 한류기 한전 실계통 시험운전 - 보호계전기 보호협조 방안 (The Application of Fault Current Limiter in 22.9kV KEPCO Grid - The Study of Relay Coordination)

  • 박경원;김민지;신철호;김영근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.215-216
    • /
    • 2015
  • The application of fault current limiter(FCL) reduces power system fault current for circuit breaker to operate properly due to reduced fault current. Also FCL reduces through fault current to the power system equipments. But FCL has changed power system parameters for short time, before application the magnitude of register, triggering current and protective relay coordination have to be studied. In this paper we will examine protective relay coordination with FCL. And propose better solution to assist improving of power system operation through the application of FCL.

  • PDF

루프 배전계통에서 Agent를 이용한 보호협조 및 자동정정 방법에 관한 연구 (A Study on the Protective Coordination and Automatic Setting Method using Agents in Distribution System with Loop)

  • 진영택;이승재;최면송;임성일;김태완
    • 전기학회논문지
    • /
    • 제61권8호
    • /
    • pp.1107-1114
    • /
    • 2012
  • In this paper, we propose protective coordination and automatic setting method using agents for distribution system with loop. The proposed protection scheme adopts an agent technology assuming communication among protection agents and auto-switch agents. Having exchanged fault-related information with each other, protection agents and auto-switch agents perform the primary and backup protection and fault section isolation, respectively. this proposed scheme using agents for distribution system with loop is implemented by matlab. Because of the various configuration of distribution system, It's difficult to find cooperative agents for each agent. This paper develops a program to automatically set the cooperative route for the agents.

Development of an Adaptive Overcurrent Relaying Algorithm for Distribution Networks Embedding a Large Scaled Wind Farm

  • Jang, Sung-Il;Kim, Ji-Won;Kim, Kwang-Ho
    • KIEE International Transactions on Power Engineering
    • /
    • 제3A권4호
    • /
    • pp.198-205
    • /
    • 2003
  • This paper proposes the adaptive relaying of protective devices applied in the neighboring distribution feeders for reliable and efficient operations of a wind farm interconnected with distribution networks by dedicated lines. A wind farm connected to an electric power network is one of the greatest alternative energy sources. However, the wind turbine generators are influenced by abnormal grid conditions such as disturbances occurring in the neighboring distribution feeders as well as the dedicated power. Particularly, in cases of a fault happening in the neighboring distribution feeders, a wind farm might be accelerated until protective devices clear the fault. Therefore, the delayed operation time of protective devices for satisfying the coordination might overly expose the interconnected wind turbine generators to the fault and cause damage to them. This paper describes the proper delayed operation time of protective relay satisfying the coordination of the distribution networks as well as reducing damage on the interconnected wind farm. The simulation results for the Hoenggye substation model composed of five feeders and one dedicated line using PSCAD/EMTDC showed that the proper delayed time of protective devices reflecting the fault condition and the power output of the wind farm could improve the operational reliability, efficiency, and stability of the wind farm.

Analysis on the Protective Coordination with the Superconducting Fault Current Limiter for the Application into the KEPCO Grid

  • Kim, Jin-Seok;Kim, Jae-Chul;Lim, Sung-Hun
    • 조명전기설비학회논문지
    • /
    • 제25권3호
    • /
    • pp.33-39
    • /
    • 2011
  • In this paper, the protection coordination of the protection devices such as the over-current relay (OCR) and recloser (R/C) with superconducting fault current limiter (SFCL) was investigated in a KEPCO grid. The operation time and protection coordination of the protection devices were changed by the SFCL. Through the analysis for protection coordination between the SFCL and the protection devices in the KEPCO grid, the operation time was observed to depend on the impedance of the SFCL.

New Coordination Approach to Minimize the Number of Re-adjusted Relays When Adding DGs in Interconnected Power Systems

  • Ibrahim, Doaa Khalil;El Zahab, Essam El Din Abo;Aziz Mostafa, Saadoun Abd El
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권2호
    • /
    • pp.502-512
    • /
    • 2017
  • The presence of DGs in power system networks tends to negatively affect the protective relays coordination. The proposed method introduces an approach to minimize the numbers of relays that acquire new settings on contrary to their original settings (case without DG), to achieve relays coordination in case of adding DG, since relays coordination with minimum number of relays of re-adjusted settings represents economical target, especially in networks containing mixture of electromechanical and adaptive digital relays. The scheme decides the possible minimum number of re-adjusted relays and their locations in an optimum manner to achieve proper relays coordination in case of adding DGs. The proposed approach is divided into two successive phases; the first phase is stopped when the first relays coordination solution is achieved. The second phase increases the possibility to keep higher number of relays at their original settings than that obtained in first phase through achieving multi solutions of relays coordination. The proposed approach is implemented and effectively tested on the well-known IEEE-39 bus test system.

연계형 태양광발전설비의 새로운 오동작 방지 및 재병입 알고리즘 제안 (Algorithm for Preventing Malfunction and Reclosing in Grid-Connected PV Systems)

  • 황민수;전태현
    • 조명전기설비학회논문지
    • /
    • 제26권7호
    • /
    • pp.70-76
    • /
    • 2012
  • In general, the unidirectional power flow is normal in distribution feeders before activation of distributed power source such as PV. However, the interactive power flow is likely to occur in case of the power system under distributed generation. This interactive power flow can cause an unexpected effect on convectional protection coordination systems designed based only on the unidirectional power flow system. When the power line system encounters a problem, the interactive power flow can be a contributed current source and this makes the fault current bigger or smaller compared to the unidirectional case. The effect of interactive power flow is varied depending on the location of the point to ground fault, relative location of the PV, and connection method. Therefore it is important to analyse characteristics of fault current and interactive flow for various transformer connection and location of the PV. This paper proposes a method of improved protection coordination which can be adopted in the protective device for customers in distribution feeders interconnected with the PV. The proposed method is simulated and analysed using PSCAD/EMTDC under various conditions.

RCD와 SPD의 접속 위치에 따른 보호협조 (Protection Coordination Associated with Connection Location of Residual Current Devices and Surge Protective Devices)

  • 이복희;박희열;신건진;배관영;류춘형;이강희
    • 조명전기설비학회논문지
    • /
    • 제27권3호
    • /
    • pp.100-106
    • /
    • 2013
  • In this paper, in order to analyze lightning impulse response characteristics in combined installations of SPDs and RCDs, surge protection coordination between SPDs and RCDs are experimentally investigated by using the combination wave generator. Six different types of single-phase residual current operated circuit-breakers with integral overcurrent protection for household and similar uses(RCBOs) being present on the domestic market are tested according to KS C IEC 61009-1 standard. As a result, when a class I SPD is located on the source side of an RCBO, all kinds of specimens are able to provide the proper coordination between the SPD and RCBOs without nuisance tripping, unintended operation or damage due to test impulse currents. However, in the case that the class II SPD is located on the load side of RCBOs, a lot of L-N mode injected currents is split into the RCBO, and a few RCBOs are damaged. Coordination between SPDs and RCDs is not valid and a role of SPDs is of no use. When combining SPDs with RCDs, it is necessary to select SPDs and RCDs in consideration of the protection voltage level of metal oxide varistor embedded in RCDs.

네트워크 배전계통용 백업 보호협조에 관한 연구 (Research on Backup Protective Coordination for Distribution Network)

  • 김우현;채우규;황성욱;김주용
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제8권1호
    • /
    • pp.15-19
    • /
    • 2022
  • The radial distribution systems (RDS) commonly used around the world has the following disadvantages. First, when the DL is operated on a radial system, the line utilization rate is usually kept low. Second, if a fault occurs in the radial DL, a power outage of 3 to 5 minutes is occurring depending on the operator's proficiency and fault situation until the fault section is separated and the normal section is replaced. To solve this problem, Various methods have been proposed at domestic and foreign to solve this problem, and in Korea, research is underway on the advanced system of operating multiple linked DL always. A system that is electrically linked always, and that is built to enable high-speed communication during the protection coordination is named networked distribution system (NDS). Because the load shares the DL, the line utilization rate can be improved, and even if the line faults, the normal section does not need to be cut off, so the normal section does not experience a power outage. However, since it is impossible to predict in which direction the fault current will flow when a failure occurs in the NDS, a communication-based protection coordination is used, but there is no backup protection coordination method in case of communication failure. Therefore, in this paper, we propose a protective cooperation method to apply as a backup method when communication fails in NDS. The new method is to change TCC by location of CB using voltage drop in case of fault.