According to the New Town Development Plan, Gang-buk area, a symbol of slum in Seoul will be changed new residential area. There are a lot of challenges for success this project. First of all, new ways of city plan "pre-plan and development" and "environmentally friendly development" are necessary to carry out this plan. Another important idea is how to overcome conflicts such as unbalanced development, a traffic jam and environment problem. Also, Government and a citizen agree that this project have to accept eco-protectable and sustainable development theory. For increasing green area ratio and keeping eco-diversity, planting at roofs and water circulation system in residential complex are compulsory. Green network based on environmentally friendly development provides a natural energe stream on eco-system and protects a city from air pollution, hot air island phenomenon and a flood.
Kim, Jeong-Won;Lee, Dong-Jin;Lee, Min-Joo;Lee, Ji-Hyung
Proceedings of the Korean Institute of Building Construction Conference
/
2019.11a
/
pp.184-185
/
2019
The purpose of this study is to suggest the improved methods for cost sharing in apartment remodeling projects. Case studies on apartment remodeling projects with different plan type were analyzed and compared. Cost sharing estimated by 'proportional rate method' shows similar results estimated by 'return on investment method' in case of similar area ratio of existing plan to remodeling plan. Otherwise cost sharing estimated by 'proportional rate method' shows great differences comparing the results estimated by 'return on investment method'. Although return on 'proportional rate method' is widely used, it is not proper to estimate cost sharing when each householder's contribution for the project varies, such as considerable differences area ratio of existing plan to remodeling plan. Improved cost sharing method is needed taking into account project contribution and characteristics.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.4
/
pp.2799-2806
/
2015
This study aims to find out the better management plan for city master plannning as an ODA to accomplish the economic effect. For this study, the "Hai Phong New Town Development Project" and the "Modification of Hue City's Master Plan" were studied. The result of the case study shows that there was difference between the two projects which was the status of following projects. While those two projects were highly acclaimed, only Hue project had several projects. This is because of the understanding degree on ODA project of participants, the distinct characteristics of the recipient country; Vietnamese local and central government, and the difference of each project's main purpose. And the result of FGI shows that to accomplish economic effects of master planning project as ODA, the enthusiastic approach to find out following project from the beginning step of the master planning, the experience of project manager on ODA, the close association with the recipient country, and the positive support from the Koica especially, the local office were crucial.
Journal of The Korean Society of Agricultural Engineers
/
v.63
no.2
/
pp.19-31
/
2021
The Ministry of Maritime Affairs and Fisheries has been promoting the 'Fishing Village Specialization Capacity Enhancement Project' to pursue sustainable development of villages such as income generation by using local tangible and intangible resources led by local residents at the village level since 2013. For the fishing village-Specialization capacity enhancement project, six training sessions (mainly in the village unit) are selected by the public offering method, and the project (income generating business, village development project, etc.) is developed for the selected village residents. It has a process of establishing a village project plan (a preliminary plan for village development or a sixth preliminary industrialization plan) based on the training of experts 5 times, practice or excursion 1 time). In this study, four villages in Gangwon-do fishing villages (two coastal villages and two inland water villages) were surveyed on the perception and satisfaction of fishing village development projects before and after training. The survey analysis was conducted by dividing the analysis of resident capacity and satisfaction into personal, interpersonal, and social dimensions. The survey was conducted by distributing a survey before and after training, and a 1:1 survey was conducted according to the residents' cognitive status. Based on the survey, factor analysis, reliability analysis, and analysis using the corresponding sample t-test showed an increase of 0.02 for Yangyang Mulchi fishing village, 0.11 for Samcheok Jangho fishing village, and 0.36 for Hongcheon River fishing industry, but Yanggu Jinmok fishing industry was -0.29, unlike other regions. As a result of this analysis, it has been empirically proven that provision of training projects through resident participation is a very important factor for the success of the fishing village project. Therefore, rather than fostering local leaders, training and community activities to strengthen personal capacities of residents participating in the project, it is necessary to operate the software business with a focus.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.68-74
/
2007
Critical Chain Project Management(CCPM) is a new project management system paradigm which maintains the advantages of PERT/CPM and improves the shortcomings of it. In CCPM the task durations are determined as 50% time estimates, ie average time discarding the their contingency. CCPM determines the critical chain the constraint of a projects considering the logical precedence relationship and resource conflict resolution. Project buffer is located at the end of critical chain to absorb the variations of critical chain. The size of project buffer is usually calculated as the half of the sum of critical chain length. Also feeding buffer is inserted after each non-critical chain which feeding into the critical chain to prevent the time delay of critical chain from uncertainties of non-critical chains. Resource buffer can be utilized to improve the availability of resources of critical chain. Buffer management is a project execution and control mechanism. Buffers are classified into 3 zones. They are OK zone, Watch and Plan zone and Expediting zone. If the project status is within Watch and Plan zone, contingency plan is established. And if it changes into Expediting zone, the preplanned contingency plan are executed to recover the time delay. In CCPM the workers are asked to work with relay runner work mechanism that they work fast if possible and report their completion to project manager for the succeeding task to start as soon as possible. The task durations are not considered as the promised time schedule. The multi-tasking is prohibited.
Journal of The Korean Society of Agricultural Engineers
/
v.54
no.6
/
pp.9-17
/
2012
In 1960's, Korea had concentrated on economic development, in the meantime the existing problem which is an avoiding rural settlement phenomenon such as a farming population decrease, an unstabel income, poor surroundings, etc. could intensify. And because of an exodus from agricultural area caused by industrialization and a fall of agricultural farm price as a result of domestic agricultural market opening in accordance with FTA, in 2004 Korean government excuted the integrated rural-village development plan as a measure to provide more support for agricultural villages. The integrated rural-village development plan means that inter-connected with villages which have potnetial and developed it as a unit of small-zone, also we can assume it a Down-up development type because residents participate and lead this plan directly. But, this plan made progress rapidly as a countmeasure of government so, it needs to evaluate for completed project area and make an improvement for a sustainable undertaking. Therefore, this study categorized project contents systematically into two parts of Hardware and Software, after that composed of 4 large-parts, 13 mid-parts and 43 small-parts from Inje-Yongdai zone which was designated for an integrated rural-village development plan in 2004. And a result of analysis for project contents priorities by hierarchy analysis method showed the Regional capability reinforcement is selected for the most important project content by 3 stakeholders who are specialists (514pts.), Korea Rural Community Corporation staffs (694pts.), local government officers (688pts.)
This study examines the Gyeongju Seokguram Grotto restoration project (1961-1962) by architect Kim Chung Up (1922-1988) and introduces the documents he wrote at the time of planning. The study highlights Kim's Plan attempt to adopt Buckminster Fuller's idea of the Geodesic Dome, while inheriting the architect Pai Ki Hyung's previous design plan which was nullified. As Seokguram Grotto's water leak and deterioration issues have been brought up, the four-times survey was carried out by experts team between 1958 and 1960, under Ministry of Education's direction. Pai designed an initial restoration plan based on the survey's result, which was a double-dome structure with a concrete film on the outer periphery as a way to protect Seokguram Grotto in January 1961. However, as drawbacks, such as the heavy load of the concrete dome, and non-installation of entrance hall, have been indicated in the review process, the Cultural Properties Committee rejected the plan. Subsequently, Kim was appointed as the supervisor of the second restoration project. Kim drew up a process management schedule to be implemented from August 1961 to December 1963 and designed the conception plans for the second restoration design. This study analyzes Kim's Plan by examining sketches, site plans, floor plans, and sections. Kim planned to maintain the idea of the double-dome structure proposed by Pai while applying Buckminster Fuller's idea of the Geodesic Dome. Kim planned to lighten the dome structure by applying a steel-frame Geodesic Dome so that the dome structure could be supported by its own. The study is expected to reclaim the omitted parts from Seokguram Grotto's historical description and Kim's careers.
Journal of the Economic Geographical Society of Korea
/
v.26
no.1
/
pp.40-54
/
2023
The purpose of this study is to present implications using local government data, focusing on the occurrence of empty houses, one of the serious social problems emerging due to population extinction and aging. The subjects of the study were Mokpo-si, which has the highest percentage of empty houses in the country, and the spatial distribution status was identified by schematizing the status of empty houses by grade on a map through data from the local government's survey on empty houses. As a result of the survey on vacant houses, it was confirmed that 90% of empty houses in Mokpo City were included in the project district of the urban regeneration strategy plan underway in Mokpo City. Currently, the empty house maintenance project is difficult to proceed smoothly due to difficulties in purchasing empty houses and lack of budget for local governments, so in order for the project to proceed quickly, it is necessary to come up with a plan to promote the project in connection with the urban regeneration strategy plan in Mokpo.
This paper presents a Rotem's methodology for the establishment of train operation plan in Railway system. Train operation plan is the key prior plan to proceed the design of the civil and E&M relevant subsystem. But, due to the limitation of the environmental and project condition, common consensus to the key factors which make up the operation plan have not been accomplished. So, as a result of this comparative review for the general approaching method of train operation plan and application status of the major key factors being performed by Rotem, we will get the opportunities to improve the accuracy of the train operation plan.
Journal of the Korean Institute of Landscape Architecture
/
v.32
no.4
/
pp.39-48
/
2004
In the 1960s, polluted urban streams were covered and paved in concrete. Rivers became sewers buried under road. As a result, wildlife habitat was lost and the open stream space was gone. In the 1990s, there was a movement for restoring urban streams to enhance the quality of life of inhabitants. Chungkye Stream, whose covering began from early 1950s and ended in 1977, is now in the process of restoration together with the Central Business District (CBD) Redevelopment Plan. However, as the construction proceeds, several problems were raised, and serious controversies resulted. Therefore, this study aims to investigate the validity of the approach of the Chungkye Stream Restoration Project through a literature survey and a site survey, and to present the improved alternative. Ultimately, the study aims to contribute to present references or guidelines for similar urban stream restoration projects. The Chungkye Stream Restoration Project has some of the following problems. First, the construction should be done based on the long-term urban redevelopment plan. Second, the construction period should be extended to restore urban streams. Third, the cultural asset conservation plan should be implemented. In order to fulfill the anticipated purpose, the above mentioned problems need to be solved.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.