• Title/Summary/Keyword: Project plan

Search Result 2,102, Processing Time 0.027 seconds

A Study on the Monitoring and Evaluation of Priority Projects for Urban Regeneration (도시재생사업의 모니터링 및 평가방안 연구: 선도지역을 사례로)

  • Kim, Ryoon-Hee;Lee, Jong-Gun;Lee, Sam-Su
    • Land and Housing Review
    • /
    • v.6 no.1
    • /
    • pp.1-9
    • /
    • 2015
  • This study is significant by suggesting the plan of urban regeneration strategy, selection of vitalization area and build basic DB for establishing a plan of urban regeneration vitalization and draw measures to evaluate and monitor as urban regeneration project is promoted in earnest. For the process of study, basic DB and evaluation monitoring index were examined based on collaboration proposal of 13 leading areas and (the agenda of) the plan of urban regeneration vitalization in 4 areas(Seoul, Changwon, Busan, Yeongju). This study can be concluded as follows; First, general information system which can support regeneration strategy vitalization plans for smooth promotion of the project and manage regeneration vitalization project and all kinds of city maintenance projects systematically are necessary. Second, monitoring of regeneration project should be firstly institutionalized. thrid, it's necessary to secure that city or county foundational management plan and the relations during the establishment of strategic vitalization plan. Finally, it's necessary to introduce and evaluate modularized plan suitable for Bottom-up regeneration project.

Technical Management Planning Process of Engineering Project (개발 프로젝트의 기술관리 계획 프로세스)

  • Yoo, Il Sang;Park, Young Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.2
    • /
    • pp.63-68
    • /
    • 2005
  • This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.

  • PDF

A Study on the Systems Engineering Management Plan for the Railway Safety System (철도안전시스템에 적용한 시스템 엔지니어링 관리 계획 작성사례 연구)

  • Choi Yo-Chul;Park Young-Won;Cho Yun-Ok
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.64-69
    • /
    • 2005
  • The Systems Engineering Management Plan (SEMP) is the primary, top level technical management document for the integration of all engineering activities at the project plan phase. This document defined the activities to plan, control, and perform overall engineering integration. To develop the SEMP for Railway Safety System, several standards are reviewed and analyzed. And then a common requirement for SEMP preparation is derived from the results of analysis. Also, the SEMP example available practically applies to Railway Safety System. In particular, The SEMP focused on controling technical program management has been organized so far, but in this study the detailed contents of SEMP put stress on project management is derived. And it is related to each other between project management and technical engineering management. At the end, to continuously manage the items and contents of the SEMP, a database management and an automatic document generation system is presented using Computer-Aided Systems Engineering (CASE) tool.

  • PDF

Rational high-speed railway plan for passing through metropolis (고속철도의 합리적인 광역도시 통과방안)

  • Ahn Yong-Mo;Kim Hong-Yeoun
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.144-150
    • /
    • 2005
  • After the historic opening of the first section of KTX(Korea Train eXpress), it has been made changes three times in a plan to pass through cities of Daejeon, Daegu in the construction of the high speed train's second section(underground${\to}$ on ground${\to}$ under ground${\to}$ on ground). Thereafter, it has been repeatedly argued that the plan to pass through underground caused many problems such as prevention of an accident in tunnel, the difficulty of maintainence, the disadvantage of passengers' moving line. Thus construction on ground plan is coming up again with relation to the interest among local people. There have been lots of national budget loss, construction period delay in this project and people hardly trust policies about national project and nor do engineers. It will be presented that the railway line which is accorded with the characteristics of region, an agreement with local communities about national project, the reasonable procedure to determine how to pass through cities, resolve the conflict among neighborhood, and the role of engineers.

  • PDF

A Study on the Improvement of Planning and Monitoring for the Rural Center Village Development Project (농촌중심지 마을만들기를 위한 계획수립과 모니터링 개선 방안)

  • Kang, Sin-Gil;Choi, Young-Wan;Kim, Keun-Ho;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.3
    • /
    • pp.117-125
    • /
    • 2018
  • After it was reorganized as the rural center revitalization project recently, there is an opinion that the nature of the project was changed to solve long-time aspired projects of some districts unlike various projects according to the previous project purposes. Therefore, this study analyzes the current status of revitalization project plans and operation monitoring to make rural center villages, establishes plans that can be applied to the rural center village revitalization project and suggests the improvement plans for monitoring. With the necessity of connectivity with centrality analysis for long-term and sustainable growth of the rural center revitalization project, the analysis on the 8 districts' centrality analysis and the function of the master plan were compared and analyzed, but there is not enough interrelation. Regarding the consulting methods for weak districts to activate facility operation after the project is implemented, the field consulting performed by the collaboration of Gyeongsangnam-do government, Gyeongnam Rural Revitalization Support Center and Gyeongnam branch of Korea Rural Community Corporation shows 87.6% of satisfaction level, which indicates it is the most effective. Based on the above results, it is necessary to reinforce the methods on resident demand survey, dimension and the reflection process of the project when preliminary plans are established for effective implementation of the rural center village revitalization project. It is also necessary to revise relevant standards not to change preliminary plans excessively during the master plan establishment process, and to oblige preliminary investigation of experts. The joint monitoring and consulting systems of experts and local governments should be applied from the establishment stage of the master plan, so that it can be sustainable rural center village revitalization project.

The Analysis of The Project Characteristics on a Comprehensive Village Development - A Case of The Rural Public Spaces and Facilities - (거점면단위 마을종합개발사업 특성 사례분석 - 농촌 공공공간 및 시설을 중심으로 -)

  • Do, Jee-Yoon;Suh, Joo-Hwan
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.3
    • /
    • pp.33-47
    • /
    • 2016
  • The purpose of this study is to understand the master plan of "The project on a comprehensive village development with a unit of a based township" through the master plan analysis and to help understand the implications of this project in order to maintain rural villages that can make local residents satisfied with them and promote the project of comprehensive rural village development as a successful way based on a comparative analysis through the in-site survey. The processes of this study are as follows. First, the analysis of development planning created a drawing based on linking business strategy by each region. The current situation and characteristics of planned public spaces were analyzed through the analysis of location and distribution of public spaces and facilities. Second, the situation analysis was performed by the task of shooting based on the basic plan information, and the master plan and status were confirmed through interviews. Also, the analysis of location and distribution of public spaces and facilities was conducted by a created drawings based on a survey. Finally, the detailed information of public spaces and facilities was compared with the investigation by in-site survey and analyzed through the Master Plan Strategy and a detailed classification of the types of facilities among each regional issues. In addition, by overlapping the planned drawings with the results, the results of formations were confirmed and the planned positional changes and the distribution of facilities were analyzed. As the results of "The project of comprehensive village development with a unit of based township", it was determined that there were many issues on cultural and welfare facilities in this project to meet the business objectives. Also, the facilities the residents needed, identified by interviews, were rural tourism facilities. According to the results, the residents cherished rural tourism facilities as much as basic living facilities. However, as the results of comparative analysis of public spaces and facilities, it was confirmed that mostly the plan was unfulfilled. Therefore, it is concluded that living, cultural and welfare facilities in the township can be maintained and expanded comprehensively as a purpose of "The project of comprehensive village development with a unit of based township" after not only planning process but also the project is fulfilled actually in rural areas.

A Study of the Policy Improvement for the Housing Area as the Urban Regeneration of New Deal Project (도시재생 뉴딜사업 주거지 재생을 위한 정책 개선 방안 연구)

  • You, Aram;Yoo, Hae-Yeon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.12
    • /
    • pp.55-64
    • /
    • 2018
  • The purpose of this study is to examine the status and limitations of the activation plan as a result of the change in urban regeneration paradigm. In particular, the change in housing life was considered following the guidelines of the New Deal project. Specifically, the three types - General Neighborhood, Housing Support, and DongneSaligi - were analyzed from the perspective of organization, space and program. In addition, the master plan and unit project, the organization and progress, and the budget plan were reviewed. As a result, the New Deal project for urban regeneration is importance on economic regeneration, which, unlike the integrated and continuous guide proposed by the government, could limit the individual progress of transitional organizations, 2-dimensional planing and various programs. Thus, first, in order to supplement the organization's verticality and inefficiency in progress, the annual business assessment should be discouraged and the permit and progress of the project should be determined at the local government level. Second, integrated and multidimensional planning is necessary to produce synergy effects in the physical environment. Finally, the link between program unit projects and the economic effects can be considered.

A Study on Effectiveness and Activation Plan of Dream Start (드림스타트사업의 효과성과 활성화 방안)

  • Yoo, Hae Sook;Lee, Hyun Sook
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.9 no.2
    • /
    • pp.175-186
    • /
    • 2014
  • Dream Start Project purposes to provide equal opportunity for the child in the poverty. This project is conducted the last six years, there are voices of worry for the limit of the project performance. Therefore, this study aims to analyse the effectiveness of project and suggest activation plan of Dream Start from the viewpoint of users. This study use focus group interview to explore needs assessment for development of Dream Start Project. In conclusion, the project provides positive outcomes for children and their parents in terms of psychology, education and health etc. Children have increased their basic learning ability through the learning support. They have improved confidence and positiveness. The vaccine was as effective in health promotion. Dream Start had the effect of raising community consciousness. The relationship between children and their parents were smoothly through parent education. Free learning support has brought the economic effects. This project had the effect of improving welfare consciousness of the parents. This study presents the development plan of the business to reflect the users' assessment.

  • PDF

Variation Landscape Enhancement Strategy through Coloring Plan in the Busan North Port Redevelopment (부산북항재개발사업에서 색채계획을 통한 경관조성방안)

  • Kwon, So-Hyun;Lee, Joong-Woo
    • Journal of Navigation and Port Research
    • /
    • v.36 no.8
    • /
    • pp.651-657
    • /
    • 2012
  • In the Busan North port redevelopment project, which is the first large scale port redevelopment project in this country, it adopted the national landscape plan for competitiveness of port city. Furthermore, it includes many efforts on landscape formation in the process of improvement of ocean city image and enhancement of its value, which fits for the situation and characteristics of the original nature, history, and culture resources, together with all facilities, structures, symbols, and eco green belt. Firstly this study attempted to analyze the characteristics of Busan landscape, Busan city design plan(2010), especially coloring plan, together with the case study of landscape color plan for foreign countries. From the basis of this analysis, it was proposed a landscape enhancement strategy in the Busan North port redevelopment project through the coloring plan and it is expected that the result would be used for the basic data for other redevelopment project.

On the Project Management utilizing the Systems Engineering Management Plan in the Railroad Safety Technology R&D Program (철도종합안전기술개발사업에서 SEMP의 활용을 통한 프로젝트 관리방안)

  • Kim, Jae-Chul;Lee, Jae-Chon;Cho, Yun-Ok;Kim, Sang-Am;Han, Soon-Woo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1798-1805
    • /
    • 2010
  • The Railroad Safety Technology R&D Program has been supported by the Ministry of Land, Transport and Maritime Affairs. The Program consists of dozen or more projects and thus is quite complex, which requires effective project management. This paper is discussing how to effectively manage the railroad safety technology R&D program based on systems engineering management plan (SEMP). The key issues dealt in this paper include the SE management, requirements management, verification and validation, integrated data base management, and traceability management. To achieve the goal, we first defined an appropriate SE process to be adopted in the program and the result was documented in the systems engineering management plan. According to the process defined, we set up the environmental frame in database. Using the database and SEMP, each project of the program was verified with respect to the corresponding requirements utilizing the traceability. All these efforts were carried out using a computer-aided SE tool, which enables efficient management of complex database.

  • PDF