The purpose of this paper is to study on the architecture and extension project for the Church of St. Lorenzo. This study is composed of a through analysis of the extension elements on the church building and extension type for extension project of the Church of St. Lorenzo. The results of study are as follows: 1. The extension project for the Church of St. Lorenzo was basically consisted of the concept of a horizontal extension plan through both the interior and exterior space of the church building. This project was the plan of concept of additional or affixing extension through existing spaces with necessary spaces to make up for the previous simple space and form as well as functional aspect. 2. The unit spaces of the nave, the aisle, the small chapels bilaterally adorning the aisles, the transept and the chapels around transepts, and the sacristies by the extension project for the Church of St. Lorenzo is composed of regulation, balance and harmony as geometric space composition according to simple proportion system on whole and parts as well as parts and parts, through the definite articulation by each space zoning. 3. The most important innovative aspect different to previous churches in the extension project for the Church of St. Lorenzo is the compositive system of each other symmetrical spaces through long centrical axis of central part, applying the module system for horizontal arrangement. In particular, the use of regular module on repetition and proportion of rhythm from architectural composition system was precisely composed with the alter that consists of visual focus to express more accurate perspective.
International conference on construction engineering and project management
/
2020.12a
/
pp.425-432
/
2020
In order to improve the sustainability and smart construction, it is discussed arguably that developing and applying consistent "standard model" to plan business, design, construct and operate a building is considered to be one of the effective and efficient approach. The scope of this article is to examine, from the international developer's perspective, the "standard model" approach of a hotel brand to building projects in the UK, and also to explore potential role of project team to mitigate any local difference at the project level. These projects are developed by the same developer adopting the same business plan, design and operation to each project. In order to clarify the actual and likely difference in construction results, reference is also made to those building projects located in other geographical markets including Japan, Germany and USA, and focus is given on the analysis of its programme and cost. Principle findings are that there exists geographical difference especially in environmental and planning system, and that major local difference is found at least in the programme at the design stage. In contrast, the difference in the building cost itself may not be necessarily considered major if currency exchange rate being taken into account appropriately. It is also observed that there were cases where any difference in the programme was mitigated by taking different approach to procuring and defining roles of management and professional team at the project level. In conclusion, from the international developer's perspective, the geographical difference of the "construction system" surrounding building projects can typically lead to major prolongation of programme, however, these different construction results could be mitigated at least to a certain extent by introducing appropriate changes to the role of project team.
Journal of Korean Society of Industrial and Systems Engineering
/
v.34
no.4
/
pp.89-97
/
2011
Traditional quality control for manufacturing or service sector is not suitable for the quality control of a project as the project is one-time task constrained by time, cost, and quality. To meet the internal and external customers' requirements, quality costs approach to the project will be effective. Hence, we propose PONC (price of nonconformance) estimation procedure and a mathematical model, which are focused on activity-based prevention in the execution step and warranty step of EPLC (extended project life cycle). This procedure and model will help project manager develop preventive action plan for project quality costs minimization from nonconformance risk activities and PONC estimates information.
South Korea started to actively participate in the ODA project across Asia, Africa, the Middle East, CIS countries, and Latin America as it transitioned from a country receiving developmental aid to a donor country. As more and more recipient countries are looking into the e-government model of South Korea, a new approach to the Korean model is being investigated. Various promotions were made, ranging from the implementation of the e-government ODA project, review of its feasibility to evaluation of the results. In order to improve and maximize performance management OD projects, it is necessary to look into the analysis of its follow-up results. In this study, practical performance management and policy implications were explored, focusing on the e-government ODA project. In particular, a case study analysis was attempted with focus on the Nigerian e-government project promoted as part of the project. It focused on Korea's e-government linkage process, implementation procedures and strategies applied when establishing the e-government master plan and suggested the necessity of an approach suitable for new environmental changes. In terms of sustainability of the ODA project, it is necessary to build a Korean e-government model that reflects the new intelligence information technology.
International conference on construction engineering and project management
/
2009.05a
/
pp.1515-1520
/
2009
Objective of Urban regeneration project is a recovery of urban utilities through a physical, environmental, cultural, industrial and economic regeneration. The current paradigm of urban regeneration is not a simple redevelopment as physical redevelopment or improvement. Urban regeneration project is an overall development including a central commercial capacity and business capacity for administration and management, cultural facilities, sightseeing, a residential area. So Urban regeneration project include a various project. Project management of Urban Regeneration project is widely different with general project management. For that purpose, this research would offer to contribute the success factors of urban regeneration project for successful project. For offering these, this research analyzed the properties of urban regeneration project and success factors of construction project by reviewing a literature. The principal characteristics are variety objectives of each district of urban regeneration project, a diversity of stakeholder's objectives and complex structure of stakeholders, an unstructured decision-making system, a lack of plan for business cooperation. We abstracted factors for urban regeneration from brainstorming and verification by experienced experts. We suggest 2 factors related to achieving a goal effectively and 10 factors related to progress of urban regeneration project efficiently.
The Journal of Korean Association of Computer Education
/
v.13
no.2
/
pp.71-80
/
2010
This study has its purpose on analyzing the problems of data connection between general management institution and itemized management institution shown through the college information disclosure project and presenting the plan to substantialize data connection between general management institution and itemized management institution. To make close inquiry into the related problem and induce plans for substantialization, this study analyzed the previous related research data as well as the connection status of information disclosure item of Korea Foundation for the Promotion of Private School, the itemized management institution, to induce problems; induced substantialization plan for data connection of itemized connection institution. As for the substantialization plan based on such, plan to integrate schools and department codes, plan to automatize data connection and plan to secure reliability of information were established. It is anticipated that the plan to substantialize data connection between management institutions reckoned through the result of this study would be used as the basic data for information disclosure project providing various reliable information from Ministry of Education, Science and Technology, General management institution, itemized management institution and college.
Kim, Ung;Yoon, Jae-Han;Lee, Jae-Chon;Cho, Yun-Ok;Kim, Sang-Ahm;Yoon, Hyuk-Jin
Journal of the Korean Society for Railway
/
v.10
no.4
/
pp.393-397
/
2007
During the complex systems development, a great deal of data are generated from both the systems engineering process and project management process, and also some data are required to be prepared for the system engineering management plan (SEMP). For the successful completion of the project, it is necessary to effectively manage all the data in order to maintain data consistency and traceability. To fulfill the necessity, this paper introduces the concept of an integrated data architecture and discusses its realization with $Cradle^{(R)}$(a computer aided systems engineering tool). Also, it was described how to automate the production of the SEMP in that working environment. The result of the approach, managing complex data efficiently in the systems engineering view, has been successfully applied in the Railway Safety Development Program.
The Korea Astronomy and Space Science Institute (KASI) is developing three 1.6m optical telescopes with $18k{\times}18k$ mosaic CCD cameras. These telescopes will be installed and operated at Chile, South Africa, and Australia for Korea Micro-lensing Telescope Network (KMTNet) project. The main scientific goal of the project is to discover earth-like extra-solar planets using the gravitational micro-lensing technique. To achieve the goal, each telescope at three sites will continuously monitor the specific region of Galactic bulge with 2.5 minute cadence for five years. Assuming 12 hour observation in maximum for a night, the amount of 200 GB file storage is required for one night observation at one observatory. If we consider the whole project period and the data processing procedure, a few PB class data storage, high-speed network, and high performance computers are essential. In this presentation, we introduce the KMTNet data management plan that handles gigantic data; raw image collecting, image processing, photometry pipeline, database archiving, and backup.
Journal of the Korean Institute of Rural Architecture
/
v.22
no.4
/
pp.63-70
/
2020
Due to population decline and aging, many rural towns have become increasingly declining, and the government has been carrying out the rural town regeneration project to activate central area with the concept of compact city. The purpose of this study is to analyze the strategies and plans promoted in the rural town regeneration projects for the six towns in Chungcheongbuk-do and to identify their characteristics. The main subjects of the study are hardware plans such as the public facility plans and streetscape plans, which were carried out by local governments to revitalize the centre. In particular, the contents of each detailed plan, the location of each facility, detailed budget, and relationship between public facilities and commercial street in the six cases were analyzed by distribution map, relationship map and data comparison. Through this, the characteristics of the new application methods of each project to strengthen the central area were analyzed and classified into five types. The results of the study are to provide useful basic research to determine the direction of the project and select the contents of the plan in the rural town regeneration projects.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.8
/
pp.698-705
/
2016
The purpose of this study is to analyze the impact which the plan characteristics of Residential Land Development Projects have on land price changes in the project district and to derive policy implications for the efficient promotion of these projects. For this purpose, we analyzed the promotion land price change progress of Residential Land Development Projects step-by-step. After theoretical consideration and a review of the references, 16 plan characteristics of Residential Land Development Projects affecting land price changes were selected ((1) The rate of land price change, (2) Business area, (3) Residential land ratio, (4) Commercial land ratio, (5) Semi-residential land ratio, (6) Neighborhood facilities land ratio, (7) Apartment house ratio, (8) Street ratio, (9) Park & green ratio, (10) Ratio of land for schools, (11) Site development cost for $1m^2$, (12) General residential area ratio, (13) Semi-residential area ratio, (14) Commercial area ratio, (15) Semi-Industrial area ratio, and Natural green area ratio). We used SPSS Version 20.0 to analyze the impact of the 16 selected plan characteristics on the land price changes. As a result, it was found that the land price began to rise two years (before/after?) the appointment of the district and became stabilized after the completion of the project. The plan characteristics that affect the land price changes were found to be the (2) Business area, (4) Commercial land ratio, (6) Neighborhood facilities land ratio, (8) Street ratio, (11) Site development cost for $1m^2$, and (12) General residential area ratio.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.