• Title/Summary/Keyword: Project initiation

Search Result 65, Processing Time 0.023 seconds

Key Success Factors for Collaborative Technology Development Projects: The Case of Small & Medium Firms in the Korean Electronics Parts Industry (공동기술개발 프로젝트의 성패요인: 우리나라 전자부품 중소기업 분석)

  • 이광희;김영배
    • Journal of Technology Innovation
    • /
    • v.6 no.2
    • /
    • pp.122-158
    • /
    • 1998
  • This study empirically examined different patterns of collaborative R&D project with their key success factors(KSFs), using data from 82 projects in the Korean electronic parts industry. The patterns of R&D collaboration were categorized into 4 types by two criteria development motive(technology Push/market pull) and Project initiator (focal firm/partner). The bivariate relationships revealed that project characteristics (technological complexity, market uncertainty), management characteristics (participation in project formulation), problem solving characteristics(problem solving performance of the focal firm, users active role in problem solving, active role of university or research institute in problem solving) and success rates appear to be different among four types of collaboration. Each type of collaborative R&D projects also had different KSFs. The KSFs of type 1 (technology Push and focal firm initiation), for instance, include the strategic importance of the project, focal firms share of cost, active role of university or research institute in problem solving, while those of type 4(market pull and customer initiation) cover reliability of partner relationship, a time at partners involvement, information sharing. The findings suggest that the different contingencies brought different patterns and KSFs of collaborative R&D project, since different information, resources, and partners roles were needed to successfully implement the projects according to development motive and project initiator Finally, managerial, policy, and theoretical implications for the collaborative R&D activities in the Korean electronics parts industry were discussed, based on empirical results of this study.

  • PDF

Key Success Factors of Collaborative R&D Projects in the Small and Medium-Sized Companies in the Korean Electronic Parts Industry (우리나라 전자부품 중소기업에 있어서 공동기술개발의 성패요인)

  • 이광회;김영배
    • Proceedings of the Technology Innovation Conference
    • /
    • 1997.12a
    • /
    • pp.104-130
    • /
    • 1997
  • This study empirically examined different patterns of collaborative R&D project with their key success factors(KSFs), using data from 80 projects in the Korean electronic parts industry The patterns in this study were categorized into 4 types by two criteria : product types(off-the-shelf/unique) and project initiator (focal/partner). The bivariate relationships revealed that project characteristics (technological complexity, demand certainty), partner characteristics(the number of partners, precious experience), process characteristics (participation in the project formulation, specificity of the collaboration process and outcomes) appear to be different among four types of collaboration. Furthermore, this study found that each type of collaborative R&D projects has different KSFs for their commercial success. The KSFs of type 1 (off-the-shelf product and focal organization initiation), for instance, include the strategic importance of the project, the problem solving performance of the focal organization while those of type 4(unique product and partner initiation) are technological complexity, demand certainty, reliability of partner relationship, specificity of the goals, specificity of the process and outcomes, information sharing. Finally, based on this empirical results, managerial, policy, and theoretical implications of the study were discussed.

  • PDF

Development of Project Management Process for Product Development (제품개발 프로젝트관리 프로세스 개발)

  • Min, Taek-Kee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.93-101
    • /
    • 2010
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to product development projects and introduces the application cases. This product development project management process model is composed of five top processes of initiation and preparation, planning, implementation management, control, and termination and transfer. The five processes are re-divided into 18 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. This model is applied to the new car development project of a Korean automobile company and introduces the cases, which shows a project charter, a work breakdown structure, a project schedule, a progress s-curve, a risk register, and a performance report.

Development of Project Management Process for System Integration (SI 프로젝트관리 프로세스 개발)

  • Min, Taek-Kee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.3
    • /
    • pp.163-172
    • /
    • 2012
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to system integration projects. This system integration project management process model is composed of six top processes of initiation, preparation for contract, planning, implementation management, coordination and control, and termination and transfer. The five processes are re-divided into 25 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. For this model development, it has chosen the items which constituted a process through a questionnaire of experts.

A Study on the Effect of R&D Project Management System on R&D Project Performance: Focusing on the Mediating Effects of Integrated Management and Life Cycle Management (R&D 프로젝트관리시스템이 R&D 프로젝트성과에 미치는 영향에 대한 연구: 통합관리 실행 및 전주기관리 실행의 매개효과를 중심으로)

  • Jongho Won;Sungyong Choi;Heekyung Kim;Sohyun Park
    • Journal of Information Technology Services
    • /
    • v.22 no.3
    • /
    • pp.65-83
    • /
    • 2023
  • Due to the development of modern technology and the enlargement of industrial scale, the scale of many projects is expanding and the complexity is also increasing. Individual management of existing projects cannot effectively manage projects in this trend, and it is necessary to systematically manage the entire process from initiation to completion. Accordingly, the need for integrated management and life cycle management that can efficiently manage the entire project is emerging, and for this, a systematic project management system is also required. PMS enables efficient project management by linking business processes such as resource, schedule, scope, and output management of a project with separately separated infrastructure accordingly. In this paper, a research model was proposed to manage the project from the perspective of implementing integrated management and life cycle management, especially during R&D project execution, and to prove the mediating role between PMS and R&D project performance for this purpose. The proposed research model will be able to help companies and organizations that feel the need to implement integrated management and life cycle management and are preparing to build a PMS-type system or that have already been established to efficiently perform project management.

Facilitating the Usage of Value Management Processes by Charactering Capital Facility Projects

  • Cha Hee Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.144-152
    • /
    • 2004
  • Defining value as a measure of how well the project value objectives are met, Value Management Process (VMP) is considered to be any management effort or process that can proactively pursue one or more project objectives (i.e., security/safety, cost effectiveness, schedule optimization, and risk containment). The collection of 44 VMPs has been established based on a rigorous effort conducted by Construction Industry Institute (CII). Because varying circumstances on each project determine the level of suitability, it is crucial to identify which VMP should be implemented on a particular project. The current VMP selection process is primarily based on human intuition. The main objective of this paper is to provide a systematic method to facilitate the usage of VMPs on a particular project. This paper identified and quantified the selection principles (i.e., targeted value objectives, timing of initiation, project characteristics, and relative impact). The data collected from industry practitioners and VMP experts characterized each VMP in terms of the magnitude of benefit. An automated selection tool by Visual Basic Application (VBA) on MS Excel TM, was developed and proved its validity. As a pioneering study, this paper provides a comprehensive and structured knowledge on the subject of VMPs. From the industry's perspective, the automated selection tool, the premier of this study, contributes the facilitation of the VMP implementations in the construction industry thereby maximizing the potential benefits to a particular project.

Toward The Fecal Microbiome Project (분변 미생물군집 프로젝트)

  • Unno, Tatsuya
    • Korean Journal of Microbiology
    • /
    • v.49 no.4
    • /
    • pp.415-418
    • /
    • 2013
  • Since the development of the next generation sequencing (NGS) technology, 16S rRNA gene sequencing has become a major tool for microbial community analysis. Recently, human microbiome project (HMP) has been completed to identify microbes associated with human health and diseases. HMP achieved characterization of several diseases caused by bacteria, especially the ones in human gut. While human intestinal bacteria have been well characterized, little have been studied about other animal intestinal bacteria. In this study, we surveyed diversity of livestock animal fecal microbiota and discuss importance of studying fecal microbiota. Here, we report the initiation of the fecal microbiome project in South Korea.

A Proposal for Initiation of Co-operating Research about Industrial Structure Between Japan an Korea (한ㆍ일산업시스템 공동연구회설치의 제안에 대하여)

  • 본전상사
    • Proceedings of the Korean Professional Engineer Association Conference
    • /
    • 1987.12a
    • /
    • pp.72-76
    • /
    • 1987
  • I would like to propose the initiation of co-operating research about $\ulcornerIndustrial$ structure between Japan and $Korea\lrcorner.$ The purpose of this investigation is to study about appropriate system of industrial structure Japan and Korea including interactive relation. In future, tile interactive relationship of industrial structure should be desided by the investigation of a characterization about alocality, a racial character, a existence of resources, a weather, a history and natural features of a region. According to these investigation, frictionless structure of industrial society of each country will be born. The most appropriate researcher's group is Consulting Engineer's Association of each country, because they are independent from a national benefite and a profit of enterprise. According to the above reason. I propose to start the co-operating research project immediately.

  • PDF

The Construction Management Plan of Dong Myoung Service Area (동명휴게소 건설사업관리 수행계획)

  • In Chi-Sung;Kim Jeong-Won;Jung Soon-Gil;Park Gwon-su;Lee Sung-Gak;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.40-47
    • /
    • 2003
  • The main purpose of Construction Management(CM) is the improvement of efficiency and effectiveness of the project with construction methodologies systematically and technically. This pilot project Dong Myeong Service Area and Gas Station project among 5 projects designated and supervised by Ministry of Construction and transportation(MOCT), is to reduce cost, to maintain and control schedule, to keep proper quality, Claim and Risk through Partnering, Design Review, Constructability, Value Engineering and Project Management Information System(PMIS) and so on. Major factors of CM Plan are introduction of the phased and classified Construction Management Services from initiation of project to completion and adaptation of CM technologies and guide the implementation methodologies of the CM Pilot Project in CM construction market.

  • PDF

Fatigue Design of Bevel Gear for Automobile by Shot Peening (쇼트피닝에 의한 자동차용 베벨기어의 피로설계)

  • Lee, Dong-Sun;Cheong, Seong-Kyun
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.16 no.4
    • /
    • pp.63-68
    • /
    • 2008
  • The fatigue characteristics of bevel gear used for differential gear of automobile was investigated in this paper. From the A-N(Almen intensity-Number of fracture)curve of bevel gear it was shown that there was a specific time that have a maximum fatigue life. Optimal peening condition was 65m/s of project velocity and 8min of project time. Fatigue life was also investigated from the S-N curve between optimal peened specimen and unpeened specimen. Another very significant point is that the crack initiation of bevel gear by shot peening was generated in the subsurface from fractography. This paper shows that shot peening process tremendously improve fatigue characteristics of bevel gear.