Background: Tobacco use and quit attempts are two key indicators of the Global Adult Tobacco Survey (GATS) that assess quit attempts among current as well as former tobacco users. The relevant data have inherent policy implications for tobacco cessation programme evaluation. This study aimed to review the concepts of quit attempt assessment and quantifying invalid responses considering GATS-India data. Materials and Methods: GATS assessment of tobacco use and quit attempts were examined in the current literature. Two categories of invalid responses were identified by stratified analysis of the duration of last quit attempt among current users and duration of abstinence among former users. Category A included absolute invalid responses when time-frame of assessment of current tobacco use and less than former tobacco use were violated. Category B included responses that violated the unit of measurement of time. Results: Current daily use, current less than daily use and former use in GATS were imprecisely defined with overlapping of time-frame of assessment. Overall responses of 3,102 current smokers, 4,036 current smokeless users, 1,904 former smokers and 1,343 former smokeless users were analyzed to quantify invalid responses. Analysis indicated overall 21.2% (category A: 7.32%; category B: 17.7%) and 22.7% (category A: 8.05%; category B: 18.1%) invalid responses among current smokers and smokeless users respectively regarding their duration of last quit attempt. Similarly overall 6.62% (category A: 4.7%; category B: 2.3%) and 10.6% (category A: 8.6%; category B: 3.5%) invalid responses were identified among former smokers and smokeless users respectively regarding their duration of abstinence. Conclusions: High invalid responses for a single assessment are due to the imprecise definition of current use, former use and quit attempt; and failure to utilize opportunity of direct data entry interface use during the survey to validate responses instantly. Redefining tobacco use and quit attempts considering an appropriate timeframe would reduce invalid responses.
R&D is inherently an uncertain endeavor, yet now more than ever those performing R&D with public funding are called upon to clarify the utility of their research. Calls for public accountability are mounting with the increase in constraints on government budgets due to the recent worldwide economic recession, in response to which both policymakers and researchers pay much more attention to rigorously assessing publicly funded R&D. A key issue complicating R&D evaluation in these circumstances is how to adequately account for the nature and degree of risk involved in a given R&D program or project. This study deliberates on certain issues involving the measurement of ex-ante risk in public R&D evaluation: (i) information asymmetry between R&D sponsors and performers, (ii) ambiguity in the measurement of returns in both prospective and retrospective evaluation, and (iii) the dilemma between measurement error and omitted variable bias for empirical estimation of R&D performance. The study then presents an analysis of hypothetical evaluation results that apply risk-relevant weights to the annual evaluation outcomes of South Korea's national R&D programs funded during 2006~2012. In this counterfactual re-evaluation of public R&D program performance, high-risk R&D programs turn out to receive higher evaluation than non-high-risk programs. The current study suggests that R&D evaluation ignoring ex-ante risk is not only conceptually invalid since R&D activities are intrinsically uncertain endeavors, but unfair as R&D performers are asked to be accountable for the results that were in fact out of their reach.
The 180 km/h Korean Tilting Train(TTX) which is now developing as a part of the Korean National R&D project, was elaborately designed. As the tilting trains run curve track with the $30\%$ higher speed than normal trains, the higher centrifugal and dynamic force are expected. Furthermore the complex tilting system increase the probability of failure. Therefore it is very important for tilting train to ensure safety against derailment under the various kind of failed condition in the middle of running as well as normal operating condition. The TTX train have the relatively high roll stiffness to improve the lateral ride comfort and to limit the roll displacement on the curve. But the higher roll stiffness increase the risk of derailment on the twisted track. This paper describes the study to review the safety against derailment caused by the wheel unloading on the severely twisted track. The worst combination of maximum cant change with maximum twist defect was established by numerical simulation. And also it was assumed that the air bag deflated and still the train run its speed limit. Those kind of assumption might be the worst case from the view point of wheel unloading derailment on the twisted track. The dynamic simulation was done by means of VAMPIRE S/W and non-linear transient analysis. We found that derailment quotients Q/P was only slightly influenced by track twist but the wheel unloading was greatly influenced. And we ascertained that the higher roll stiffness the higher wheel unloading. In case of air bag deflated situation, the wheel unloading reached up to $100\%$ which means the wheel lift or jumped. Therefore it was concluded that the design need to be improved to ensure the safety against derailment on the maximum twisted track in case of air bag deflated and tilting train's speed limit.
The conventional analysis with which justifies government intervention of the private sector's innovation activities is the market failure approach. According to such analysis, fund allocation through autonomous market mechanisms is not optimal in technology financing because of the disparity between the desirable level of investment for society as a whole and that for private firms. To optimize the fund allocation, public policies such as subsidy, preferencial loan and venture capital investment programs are designed for technology development projects performed by private firms. They, however, have not been effective in increasing private investment for such projects. In most cases, it was found that little considerations given to the relationship between uncertainty embodied in technology development projects and each types of financing. With respect to optimizing fund allocation, technology development projects should be financed by different means according to their probability of success and the expected value of technology. Employing various theoretical models on financing decision-making we verify here that technology development projects to be supported by commercial banks or venture capital institutions is limited contingent upon levels of uncertainty adn expected value. Under the assumption that financial institutions are risk averse, loan or investment can be available only if the probability of success of the project is higher than the probability premium and the current market rate of interest. Therefore, the projects that have lower probability of success and/or small expected return are excluded from commercial loan or investment programs. However, the remaining projects, whose probability of success is low but with high expected return, may be applied under government subsidy programs. To achieve optimality of fund allocation and to activate technology financing, we conclude that there should be a systematic division of role among financial institutions including government commercial banks, and venture capital institutions.
In developing avionics systems, safety analysis and evaluation specified in SAE ARP4761 (Methods and Guidelines for Civil Aviation System and Equipment Safety Assessment Process) are carried out to prevent air accidents. Safety analysis requires knowledge of the abnormal state of the system, not its normal state, and its interrelationships with other standards. Therefore, a tool that automatically outputs data which proves compliance with safety certification standards is required. In this study,In this study, Schematized the safety analysis procedure of the specification and studied the method of applying the safety analysis CAD tools to individual procedure. As an example study, ARP4761 analysis was performed on the wheel brake system (WBS) of the ARP4761 appendix.
Journal of the Korea Institute of Building Construction
/
v.9
no.6
/
pp.151-159
/
2009
Recently, overseas construction projects have been increasing in the Middle East and Southeast Asia regions. These projects require various licenses and technologies for the manufacturing and handling processes. Additionally, the efficiency of the entire process management life cycle determines the success or failure of the business. Nonetheless, there exist various risks involved in the whole life cycle process due to a lack of experience and knowledge of management techniques. The objective of this paper is to analyze the business process of a LNG plant throughout the pre-construction and procurement phases, and to identify the knowledge and information needed for the development of the KMS. The study also plans to build a comprehensive knowledge management system throughout the whole life cycle as its final objective.
IMO introduced the concept of e-Navigation and proposed MSPs(Maritime Service Portfolios) concept to reduce marine accidents, to improve efficiency of ship operation, port operation, and ship operation technology. Korean e-Navigation defines S1 ~ S5 services, as the service concept focused on domestic e-Navigation service corresponding to IMO MSPs, and is constructing a system as an ongoing project. S2 service (onboard system remote monitoring service) among the concepts of Korean e-Navigation services, is a service concept that judges the emergency level according to risk if an abnormal condition occurs during navigation, and provides corresponding guidance to accident ships based on emergency level. The purpose of this paper is to provide a basic architecture proposal of Korean e-Navigation S2 service navigation safety module, based on the S2 service operation concept. To do this, we conducted a questionnaire survey to ask experts with experience with sailors, to respond to the subjective risk experienced by sailors considering effects of anomalies, including equipment failure relative to sailing and navigational safety. Risk level for each abnormal condition was classified. The basic algorithm design of the navigation safety module is composed of safety index (SI) calculation module based on results of questionnaire and expert opinions, safety level (SL) determination module according to safety index, and corresponding guidance generation module according to safety level. To conduct basic validation of basic architecture of the navigation safety module, simulation of the ship anomaly monitoring was performed, and results have been revealed.
Many firms have had a passion for IT investment for years. Despite such a continuing investment in IT, the application of newer technologies to business work doesn't guarantee a great success. Some IT projects were doomed to failure or ineffectiveness. What could we do to lead IT project to the territory of effectiveness? One plausible and inevitable avenue is enterprise architecture (EA), which requires one to first come up with a simplified view of the complex entity to be designed and then proceed to design and develop it as directed by the architecture. Though there have been more materials on such EA work and real cases, there still exist a doubt about why EA is needed and how a firm can introduce it. This article first presents a structured understanding about EA and then describes the necessity, and the introducing ways of EA.
Proceedings of the Korea Concrete Institute Conference
/
2008.04a
/
pp.37-40
/
2008
Many engineers find the way of improving the old building's structural behavior in the remodeling project which is performed using artificial openings for merging two houses. This test was performed to verify the characteristics of coupling beams according to the shape of the openings. One of test specimen has rectangle shape and the other was made by the circle shaped opening and one has coupling member only as slabs. Additionally, three specimens which have openings have 23% ratio in opening area to total wall area. Consequently, solid type which have no opening area shows shear failure. In the case of CW-RBS which have rectangular shaped opening, cracks are developed in coupling beam significantly. And CW-CS which has circular opening failed in shear showing development of diagonal cracks at wall toes and wall mid-height. It is thought that degradation of the wall strength is under the control of the opening shape and coupling beam-wall connection area.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2015.10a
/
pp.322-323
/
2015
Traditional rotation type large beacon was characterized by frequent failure, long repair time and high cost etc. These problems are caused by traditional light sources(metal halide lamps or tungsten halogen lamps). In order to solve these problems, IALA standards-based(efficiency and reliability) large LED beacon technologies are needed. we developed by applying a LED. The object of the this project, to design a reflective optics and the high power LED lighting engine module. And to develop a rotational speed control system for controlling flash pattern of beacon. As a result, to develop of LED beacon for landfall mark that distance to reach the light 20NM to 27NM.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.