• Title/Summary/Keyword: Project completion time

Search Result 138, Processing Time 0.024 seconds

Design System Development of the Modular Jig & Fixture (모듈러 지그와 픽스쳐의 설계 시스템 개발)

  • Jung H.S.;Lee W.R.;Park J.M.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.714-717
    • /
    • 2005
  • The concept of jigs and fixtures makes it possible to build fixtures that can be dismantled at project completion. Since this concept is modular, it is not limited to any particular unit shapes or sizes. Various standards assure that each component assemble rapidly, to get precision and accuracy. Best suited for prototype and low volume production, as well as, start-up or zero-runs, it can also substitute for damaged dedicated fixtures to minimize down-time. It need to do DB for each part by Pro/Engineer and to assemble before manufacturing. In the future will assemble each of clamping and position parts by automation.

  • PDF

Bridging a Gap between DNA sequences and expression patterns of genes

  • Morishita, Shinichi
    • Proceedings of the Korean Society for Bioinformatics Conference
    • /
    • 2000.11a
    • /
    • pp.69-70
    • /
    • 2000
  • The completion of sequencing human genome would motivate us to map millions of human cDNAs onto the unique ruler "genome sequence", in order to identify the exact address of each cDNA together with its exons, its promoter region, and its alternative splicing patterns. The expression patterns of some cDNAs could therefore be associated with these precise gene addresses, which further accelerate studies on mining correlations between motifs of promoters and expressions of genes in tissues. Towards the realization of this goal, we have developed a time-and-space efficient software named SQUALL that is able to map one cDNA sequence of length a few thousand onto a long genome sequence of length thirty million in a couple of minutes on average. Using SQUALL, we have mapped twenty thousand of our Bodymap (http://bodymap.ims.u-tokyo.ac.jp) cDNAs onto the genome sequences of Chr.21st and 22nd. In this talk, I will report the status of this ongoing project.

  • PDF

Haut - A 21-storey Tall Timber Residential Building

  • Verhaegh, Rob;Vola, Mathew;de Jong, Jorn
    • International Journal of High-Rise Buildings
    • /
    • v.9 no.3
    • /
    • pp.213-220
    • /
    • 2020
  • This paper reflects on the structural design of Haut; a 21-storey high-end residential development in Amsterdam, the Netherlands. Construction started in 2019 and is in progress at the time of writing. Upon completion in 2021, Haut will be the first residential building in the Netherlands to achieve a 'BREEAM-outstanding' classification. The building will reach a height of 73 m, making it the highest timber structure in the Netherlands. It contains some 14.500 ㎡ of predominantly residential functions. It features a hybrid concrete-timber stability system and concrete-timber floor panels. This paper describes the concepts behind the structural design for Haut and will touch upon the main challenges that have arisen from the specific combination of characteristics of the project. The paper describes the design of the stability system and -floor system, the analysis of differential movements between concrete and timber structures and wind vibrations. The paper aims to show how the design team has met these specific challenges by implementing a holistic design approach and integrating market knowledge at an early stage of the design.

A Study on the Implementation of the Safety Management Plan in the Construction Technology Promotion Act (건설기술진흥법 안전관리계획서의 실행방안에 관한 연구)

  • Shin, Sung-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.104-105
    • /
    • 2018
  • The purpose of the safety management plan under the Construction Technology Promotion Act is to improve the quality and safety of construction engineers during construction work. To prevent a collapse accident of a facility after completion by preventing a collapse accident of gravel, an earthwork, a river structure or the like. In order to prevent collapses, the purpose of the project is to study measures to improve the ability of construction technology promotion law to ensure the quality of construction materials at the time of construction work.

  • PDF

Risk Influencing Factors in Performance of River Disaster Prevention Project (하천재해예방사업의 성과에 미치는 리스크 영향요인)

  • Cho, Jin-Ho;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.4
    • /
    • pp.417-428
    • /
    • 2020
  • The characteristics of the construction project involved various stakeholders' involvement from the planning stage until completion of the object, which caused the uncertainty to increase. Successful construction projects require risk analysis and appropriate responses. Therefore, this study aimed to confirm the influence of risk management factors on the success of river disaster prevention construction in construction projects and the effect of moderating communication between stakeholders involved in the construction process. The Delphi method was used to derive the risk management factors of the construction process. The survey used a snow ball sampling method. For analysis, SPSS Statistic 20 and SmartPLS 2.0 were used. As a result of the study, the impact of risk management factors on project performance was found to be large in the order of time risk, quality risk, cost risk, safety risk, and construction environment risk. In addition, the impact of the communication moderating effect was large in the order of cost risk, quality risk, construction environment risk, time risk, and safety risk. In this study, it was confirmed that communication between stakeholders related to river disaster prevention work has a moderating effect that changes the ranking of impacts on project performance. This shows the importance of communication in the construction process of river disaster prevention works. This study has important significance in that it identifies the importance of risk management factors and communication in river disaster prevention works.

A Study Of the Construction Management Applied to BAT Korea Factory Construction Project in Korea (BAT Korea Factory 건설 프로젝트의 CM 적용사례 연구 - Cost Management 사례를 중심으로 -)

  • Kim Duk-Kon;Kwon O-Kyung;Kim Jong-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.48-57
    • /
    • 2003
  • BAT Korea's Factory is the one of the major projects that clearly confirms and demonstrates that Construction Management (CM), provided by a Korean CM Company to the foreign clients, enables them to successfully complete projects; with savings in time and reduction in cost, which it is $15\%$ lower than the cost of the overseas construction. Also, throughout the thorough schedule management, it was possible to commence with manufacturing one month after the completion date. The Key Success Factors was generated by the excellent construction management skills, and more importantly by the confidence gained by the client in giving a CM company full authority for the construction management of the project. This study has focus on elements of construction management applied to this project throughout the concept of 'One Stop Shop', including cost managements, contract management and value engineering etc. We hope that this study will provide useful data to enable public clients to take advantages of construction management, in a similar way to. the private clients, who have already implemented CM actively.

  • PDF

Study on the Persistence of Therapy Program Effectiveness in Foster care : Focusing on K-CBCL (복지시설 아동의 심리치료 프로그램 효과의 지속성 연구:아동 행동평가 척도를 중심으로)

  • Ha, Eun Hye;Shin, Min Jin
    • Therapeutic Science for Rehabilitation
    • /
    • v.8 no.2
    • /
    • pp.55-66
    • /
    • 2019
  • Objective : The purpose of this study is to confirm whether the effectiveness of the program is sustainable 9 months after project completion for the children and adolescents participating in a childcare and rehabilitation support project. Methods : This study was carried out in three phases: pre-(2016.5~6), post-(2016.10~12) and follow-up evaluation phases (2017.9) of 120 children and adolescents who participated in a treatment and rehabilitation of children project in 2016. The analysis was conducted using a repeated mesures ANOVA to identify changes in problem behaviors. Results : The problem behavior of preschoolers in middle and high schools decreased after the post-evaluation compared to the pre-evaluation, and the effect of treatment was maintained afterward. Elementary school students displayed fewer problem behaviors after the post-evaluation than in the pre-evaluation, and follow-up more. Conclusions : This study confirms that the effects of therapy are maintained for a long period of time. Furthermore, it has been confirmed that therapeutic intervention is effective for children and adolescents in foster care.

Impact of MJS treatment and artificial freezing on ground temperature variation: A case study

  • Jiling, Zhao;Ping, Yang;Lin, Li;Junqing, Feng;Zipeng, Zhou
    • Geomechanics and Engineering
    • /
    • v.32 no.3
    • /
    • pp.293-305
    • /
    • 2023
  • To ensure the safety of underground infrastructures, ground can sometimes be first treated by cement slurry and then stabilized using artificial ground freezing (AGF) technique before excavation. The hydration heat produced by cement slurry increases the soil temperature before freezing and results in an extension of the active freezing time (AFT), especially when the Metro Jet System (MJS) treatment is adopted due to a high cement-soil ratio. In this paper, by taking advantage of an on-going project, a case study was performed to evaluate the influence of MJS and AGF on the ground temperature variation through on-site measurement and numerical simulation. Both on-site measurement and simulation results reveal that MJS resulted in a significant increase in the soil temperature after treatment. The ground temperature gradually decreases and then stabilized after completion of MJS. The initiation of AGF resulted in a quick decrease in ground temperature. The ground temperature then slowly decreased and stabilized at later freezing. A slight difference in ground temperature exists between the on-site measurements and simulation results due to limitations of numerical simulation. For the AGF system, numerical simulation is still strongly recommended because it is proven to be cost-effective for predicting the ground temperature variation with reasonable accuracy.

Case Study of Opinion Coordination between Residents and Coordinators on the Planning Process of Community Housing in Sungmisan Village (성미산마을 공동체주거 계획과정의 거주자와 코디네이터의 의견조정 사례연구)

  • Park, Kyoung-Ok;Ryu, Hyun-Soo
    • Journal of the Korean housing association
    • /
    • v.23 no.3
    • /
    • pp.1-11
    • /
    • 2012
  • The purpose of this study was to make clear considerations in the planning of community housing and the roles of coordinators. Seongmisan village, a representative urban community village in Seoul, was selected for this study on problem solving between residents and opinion coordination between residents and coordinators. For this qualitative research, 2 residents and 2 coordinators answered 'open questionnaires' on prior basic planning, land purchase, financing, architectural planning, construction and inspection, and actual living conditions thereafter. They were each interviewed for 2 hours at a time that was 14-16 months after the residents started living in the new houses, and the records were transcribed. The following was the result. 1) The residents, who ruled the steps of prior basic planning and land purchase, did not have sufficient information or knowledge of the construction of community housing, so that they faced difficulties especially in the legal and financial aspects. 2) The coordinators participated in the project at the steps of architectural planning and construction. The residents accepted the coordinators' opinions on the choice of floor and position, and the coordinators listened to the residents' opinions on individual plans and finishing materials. In the construction step, however, there was conflict between them, and dissatisfaction occurred on the completion time and construction cost. For the successful construction of community housing, a professional coordination company needs to join the project to establish a system of opinion coordinating from the step of prior basic planning to the step of afterconstruction management.

Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works (공동주택 마감공사 공사주체별 작업지연 요인 분석)

  • Lee, Seung-Hoon;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Junn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.73-81
    • /
    • 2011
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.