• 제목/요약/키워드: Project area

검색결과 2,454건 처리시간 0.027초

경지정리사업의 확장편익-비용분석 - 충남서산시 지곡지구를 중심으로 - (An Extended Benefit-Cost Analysis of Land Consolidation and On-farm Development Project -With Respect to Jigok Land Consolidation and On-farm Development Project in Seosan, Chungnam Province, Korea-)

  • 임재환;이민수
    • 농업과학연구
    • /
    • 제29권1호
    • /
    • pp.66-83
    • /
    • 2002
  • The economic feasibility analysis including benefit-cost ratio and internal rate of return of a land consolidation and on-farm development project was mainly depended upon the direct benefits and costs arising during project life. Therefore the projects were neglected in allocating the government's financial funds and loans on account of the low economic rate of return of the project. Accordingly the extended benefit-cost analysis method should be introduced and adapted to cover not only the benefit s such as non-market values of environmental and food security fun ct ions of the project but also market values of the project outputs. The main purposes of this study are (1) to prepare a guide line for economic feasibility analysis based on the IBRD and ADB guidelines, (2) to estimate the benefits from productivity increase, labor saving, savings of O&M cost of farm mechanization and project facilities, savings of farmer's burden for their public health, increasing environmental and public functional value of paddy fields, improving food security condition and formation of peaceful and uncontroversial rural society by implementing the land consolidation and on-farm development, (3) to introduce the newly adapted analytical method as the extended benefit cost analysis which could make possible to be included the values of non-market goods such as the food security and the environmental public function of paddy fields. To carry out this study, the existing publications on the guidelines for economic agricultural projects were reviewed and consultation was made with a For the post evaluation study of the land consolidation and on-farm development project, field survey in Jigok and other comparative area were made to get available information. According to the project completion report, Jigok land consolidation and on-farm development project has 55ha of benefit area out of 69ha of gross area. The project was started in November 11th, 2000 and completed october 30th, 2001. The total project costs were amounted to 2,548 million won and the annual project benefits were estimated at 335million won evaluated by domestic market prices. The ERR(Economic Rate of Return) and SRR(Social Rate of Return) of the project based on the shadow pricing system were estimated at 4.4% and 16% respectively. On the other hand, the ERR and SRR based on the domestic market value system were amounted to 6.37% and 14.62%. In conclusion, Korean land consolidation and on-farm development projects have not carried out from the view point of economic rate of return under shadow pricing system but from the view point of domestic pricing system. For the future feasibility studies on land consolidation projects have to be carried out including the non-market values as environmental and food security function of the projects.

  • PDF

농촌지역개발정책을 위한 새마을사업의 현대적 함의 (Present Implications of Saemaul Project for Rural Development Policy)

  • 양원식;정남수
    • 농촌계획
    • /
    • 제22권2호
    • /
    • pp.9-18
    • /
    • 2016
  • In this research, we reappraise saemaul project which is a leading role of rural development in a present perspectives and deduct social and political implications for rural development. For deducting problems and implications, related documents and previous researches are reviewed. Administration statistics are also gathered and analyzed for monitoring detailed projects propulsion progress and results. Samaul project is reappraised based on previous researches such as rural development, regional agricultural production system improvement, agricultural distribution system improvement, leader breeding, income improvement, and governance. Saemaul project has basically positive characteristics because of decreasing growth gap of urban and rural area by empowering cooperation of rural residents, instilling leadership, making village fund, constricting networks of government and urban area for administrative and financial assistant. In conclusion, there are implications that continues interests of most powerful sovereignty and comprehensive assistant of government are needed for overcome agricultural and rural crisis. Saemaulundong is a united and systematic approach in village level. In south korea where most of farms are small size, village or regional level assistants started in saemaulundong are still needed. In regional development, we can infer that will and ability development of participated residents are most basic and important factors for successful project propulsion in saemaul project.

과원규모화사업 효과 및 사업수요에 대한 연구 (A Study on the Effect and Business Demand of the Orchard Scale-Up Project)

  • 임청룡;박영준
    • 농촌계획
    • /
    • 제29권1호
    • /
    • pp.11-17
    • /
    • 2023
  • In this study, the effect of orchard expansion, structural improvement, and potential demand of the orchard scale-up project implemented since 2004 to strengthen the competitiveness of orchard farmers was examined. The results of the analysis are summarized as follows. First, looking at the effect of scale-up by checking the standard income data of the Rural Development Administration, it was possible to confirm the effect of scale-up in that the income per unit area increases as the scale increases. Second, through the scale-up project, the effect of structural improvement in transferring the orchards of the aged farm households to the younger farm households was confirmed to be 13 years old on average in the case of a sale business and 16 years old in the case of a lease business. Third, it was found that income increased at a statistically significant level after participating in the orchard scale-up project for major fruit crops such as apples, pears, and peaches. Fourth, it was found that age and cultivated area had a statistical effect on the probability of participating in the orchard scale-up project for farmers who did not participate in the project. The potential business demand using the estimated results was found to be between 25,203 and 37,089.

한전 765 kV 송전선로 건설을 위한 강원도 태백.사북지역 착빙설 하중조건 검토 (A study on the ice and snow loading condition in Taebaek and Sabuk area in Gangwon province for the construction of KEPCO 765kV transmission lines)

  • 박광희;김용완;원봉주
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1996년도 하계학술대회 논문집 C
    • /
    • pp.1923-1924
    • /
    • 1996
  • Some part of the route in KEPCO 765kV transmission line being constructed passes through a high mountain area which is 800m above the sea level (Taebaek, Sabuk area in Gangwon province). This area is the top part of Taebaek mountains corresponding to the backbone of korean peninsula and has lots of snow during the winter season because the winter seasonal wind gone up along the mountainside of Taebaek Mts. meets open air of the East sea. KEPCO has experienced 63 faults of T/L between 1968 and 1993 in this area, which is a very serious problem. Especially 154kV Hwang-Ji T/L fault in 1990, 2 was a unprecedented case which needs to be analyzed carefully to take proper measures. After reviewing ice and snow loading conditions and analyzing the fault of Hwang-Ji T/L, we're going to determine the revisement of ice and snow loading condition in this area to increase reliability of 765kV transmission line.

  • PDF

플랜트 건설 공사를 위한 사업관리 전문가 시스템의 개발 (Development of Expert system for Plant Construction Project Management)

  • 김우주;최대우;김정수
    • 정보기술응용연구
    • /
    • 제2권1호
    • /
    • pp.1-24
    • /
    • 2000
  • 건설업에 있어서의 프로젝트 관리 즉, 사업 관리는 다른 분야에 비해 여러 가지 요인들로 인해 상대적으로 매우 높은 불확실성과 위험을 수반하게 되며, 이러한 불확실성과 위험으로 인해 건설업에서의 사업관리의 중요성이 매우 크게 인식되고 있다. 사업관리 단계에 있어 사업 정의 및 사업 계획 단계와 사업 설게 및 사업 수행 단계를 자동 또는 반자동적으로 동시에 일관성을 유지시킬 수 있는 체제의 확립이 절실하다고 판단되며, 이를 지원할 수 있는 지원시스템의 필요성이 부각되고 있다. 그러나 이들 초기 단계의 업무는 사업 설계 및 사업 수행 단계와 비교해 상대적으로 비정형적으며, 해당 기업의 축적된 노하우나 전문적 지식에 대한 의존성이 강함으로 인해 쉽게 시스템적 지원을 제공하는데 어려움을 가지고 있다. 특히 이러한 문제는 본 연구에서 대상으로 하고 있는 플랜트 건설 분야에서는 매우 두드러지게 나타나고 있다. 따라서 본 연구에서는 이러한 사업 관리 시스템과 연계될 수 있도록 할 수 있는 체계적 접근 방법을 제시하고 이를 구현함으로써 이상의 문제에 대한 하나의 해결 방법을 제시하고 있다. 이러한 해결 방안을 위한 주요 방법론으로서는 지식 기반 추론과 사례기반 추론 및 신경회로망 기법을 체택하고 있으며 덧붙여, 본 연구에서 개발된 사업 관리 전문가 시스템은 국내 굴지의 건설 회사의 열병 합발전소와 하수처리장 건설을 위한 실제 사업 관리 업무에 적용되어 그 성과를 경험적으로 검증하고 있다. 나아가 이러한 실제 적용 사례는 본 방법론 및 시스템이 다른 플랜트 건설 분야에서도 성공적으로 적용될 수 있으며, 따라서 플랜트 건설 분야에서의 사업 관리 업무의 질적 향상과 생산성의 제고에 기여할 수 있음을 시사하고 있다.

  • PDF

Analysis of Factors Affecting Economic Feasibility of Long-term Public Rental Housing Reconstruction Project

  • Joe, Won Goog;Cho, Jae Ho;Son, Bo Sik;Chae, Myung Jin;Lim, Nam Gi;Chun, Jae Youl
    • Architectural research
    • /
    • 제24권3호
    • /
    • pp.85-91
    • /
    • 2022
  • The public rental housing policy aims to provide the housing to the vulnerable class who do not have enough credit to own houses. The Korean government introduced new policies for housing supply to improve the availability of new houses. However, it is difficult to expand the supply because of the accumulated deficit of public rental housing. In this study, the economic feasibility of long-term public rental housing reconstruction projects was examined to ensure the economic and sustainable growth of public rental housing. The research found that the compensation for the accumulated deficit is needed. Also the research analyzed and identified the factors affecting the economic feasibility of reconstruction projects. The significant factors identified in this research are: the supply price of pre-sale/rental housing in the reconstruction project, total cost of the reconstruction project, and total floor area of the reconstruction project. According to the analysis results, it is necessary to increase the rent of existing long-term public rental housing, expand the government subsidy, increase the supply price of pre-sale/rental housing, and reduce the total project cost. However, there are limitations. For example, the fluctuations of construction market, residents' burden of housing costs, and the limit of the budget of the public housing authority. The increasing total Floor Area Ratio(FAR) limitation of the reconstruction project would be the realistic solution to the problem because it gives incentives to the reconstruction project.

공공보건조직을 통한 농촌지역 초등학교 불소양치사업 개발에 관한 연구 (1) (A Study on the development for the primary school fluoride mouthrinsing project through the public health system in a rural area)

  • 최진수;홍석진;황민홍;이상대;정성숙
    • 농촌의학ㆍ지역보건
    • /
    • 제21권2호
    • /
    • pp.221-230
    • /
    • 1996
  • This study was purposed to develop the fluoride mouthrinsing project through the public health system in a rural area. This project was performed under the management of the public health dentist for the 3rd grade students selected from the 5 primary schools at Goksunggun in Chonnam area. Fluoride mouthrinsing was executed with 0.2% neutral sodium fluoride solution once a week. After 1 year's fluoride mouthrinsing project, DMFT index, DMF rate frequencies of toothbrushing, simplified oral hygiene index, and the responses to fluoride mouthrinsing project of the school children participated were examined. The results obtained from this study were as follows: 1. The fluoride mouthrinsing project for school children was performed average 10 times a year by the public health dentist. They were relatively little active to perform this project. 2. There was no significant difference in the increasement of DMFT index and DMF rate during 1 year between control and fluoride mouthrinsing group. 3. Control group was increased higher than fluoride mouthrinsing group in simplified oral hygiene index. 4. Toothbrushing frequencies increased in both groups. 5. 80.4% of school children participated in fluoride mouthrinsing project was responded to like it, and 78.2% among them was responded the project to be beneficial for their dental health. 6. 39.2% of school children was responded to have water-like taste for fluoride solution. But 34.0% of them was done to have strange taste. On consideration of above findings, this fluoride mouthrinsing project was not well performed by the public health dentists and also the oral health status of school children participated was not significantly improved by this project. Therefore, to perform continually this project well, it was recommended that this project should be performed by other person such as dental hygienist rather than public health dentist.

  • PDF

SELECTING OPTIMUM MANAGEMENT PRACTICES IN PRE-CONSTRUCTION PHASE CONSIDERING PROJECT CHARACTERISTICS

  • Hee-Sung Cha;Ki-Hyun Kim;Young-Jin Ko
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.609-613
    • /
    • 2011
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the difficulties of managing construction project in the construction industry. This research classifies and applies the potential improvement made by the construction practitioners. In order to apply influential factors for success on the construction project, the research identifies the relationship between the factors and performance management practices. In addition, in order to predict the results reflecting the project characteristics which are un-improvable by the construction managers in the initial stage of construction, the effect of project characteristics to the identified management practices have been drawn by performance area. Finally, in order to improve the predicted performance, this research provides a framework in setting valid best practices according to the performance areas through a statistical analysis between the best practices and project characteristics through the industry survey.

  • PDF

Forest Structure and Composition in the Vicinity of Srinagar Hydroelectric Power Project in Alaknanda Valley, Garhwal Himalaya, India

  • Ballabha, Radha;Kuniyal, Archana;Tiwari, Prabhawati;Tiwari, Jay Krishan
    • Journal of Forest and Environmental Science
    • /
    • 제36권2호
    • /
    • pp.78-90
    • /
    • 2020
  • We studied forest structure and composition in the vicinity of Srinagar Hydroelectric Power Project in Alaknanda Valley, Garhwal Himalaya, India to provide baseline data for the management of forests. Eight sites were selected in the vicinity of power project based on elevation and species composition. Density varied from 650 to 340 ind ha-1 for trees and from 4,360 to 6,480 ind ha-1 for shrubs. TBC ranged from 35.02 to 54.02 ㎡ ha-1 for trees and from 0.875 to 2.628 ㎡ ha-1 for shrubs. On the basis of density and IVI, Pinus roxburghii was found dominant tree species in most of the sites, whereas among the shrubs, Carissa opaca was dominant. Dominance of Pinus roxburghii in most of the sites is an indication towards possible threat to associated species in the area. The dominance-diversity curve of trees showed a geometric distribution, whereas the shrubs displayed log-normal curves. The forest has rich and diverse species composition however; habitat degradation caused by the construction of Power Project might lead to reduction of plant species from the area. The information obtained from this study will be helpful in predicting possible changes in the forest ecosystem properties in near future after completion of the power project.

The Netherlands Spatial Development for Port Area in City-Region Focusing on the Case of Kop van Zuid in Rotterdam

  • Lee, Hee Jae;Whang, Heejoon
    • Architectural research
    • /
    • 제22권4호
    • /
    • pp.135-143
    • /
    • 2020
  • The Netherlands is a human-made country and an extremely well-designed European country as well. The general Dutch spatial planning for the city and environment takes place at a regional level. The local community determines the primary development conditions, and the prospect is included in a legally binding land-use plan. Especially, Rotterdam is a representative port city as the center of world trade and the gateway to western Europe. According to the history of war, the city reconstruction and the movement of the port area have led to a general change in Rotterdam and the regional redevelopment project on the southern port area of Mass river for the expansion of city functions and the balanced development. The research purpose is to understand the spatial development of the Netherlands city-region based on the analysis regarding the Kop van Zuid project, which is a representative implemented case in Rotterdam. The theoretical framework is the five dimensions and twelve indicators of territorial governance from the TANGO research project by the EU. The target case is assessed by planning and social aspect, respectively, and the results are discussed based on the theoretical framework. This research has the possibility to be utilized as advanced research by the European perspective for spatial development in other city-regions with the port area, such as Incheon and Busan in Korea.