• 제목/요약/키워드: Project analysis

검색결과 6,536건 처리시간 0.034초

Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • 제10권1호
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

도시재생 평가지표와 재생모델 설정에 관한 연구 - 공공부문 시행을 중심으로 - (A Study on establishment of urban regeneration project models and evaluation indexes - Focused on Public project -)

  • 최정민;최찬환
    • 한국농촌건축학회논문집
    • /
    • 제13권3호
    • /
    • pp.53-60
    • /
    • 2011
  • The purpose of this study was to propose the urban regeneration project model that reinforce public functions and contribute effectively to urban development. The results of this study were as follows. First, this study developed objective 22 different types of evaluation indexes. The indexes allows to figure out the necessities, business value and conditions of certain urban regeneration project. Second, the urban is divided to 6 types by characteristics of functionality and location. So, each regeneration project model can be applied to meet the condition of the urban.. Third, this study proposed 5 types of urban regeneration project model to fulfil roles of public and encourage the urban development. The urban regeneration project model is supposed to perform the evaluation of urban condition using the index, typological analysis under the law and scheme and analysis of function and urban location.

정보시스템 프로젝트의 위험요인에 관한 실증 연구 (An Empirical Study on Risk Factors in Information System Project Management)

  • 조숙진;이석준;함유근
    • Asia pacific journal of information systems
    • /
    • 제16권3호
    • /
    • pp.143-158
    • /
    • 2006
  • Identifying risk factors in software risk management is imperative for project managers. The purpose of this paper is to provide software project risk factors validated by statistical analysis, and thus to help project managers alleviating the possibility of software project failure. Factor analysis with data collected from 264 Korean project managers and consultants identified 12 categories and 46 risk factors. T-test results showed that project managers and participants had statistically different perception on 3 risk factors among those 46 risk factors. We concluded by discussing implications of our findings and future research directions.

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

건설사업 수행성과평가에 대한 분석 고도화 연구 (A Study on Advanced Analysis of Construction Project Performance Evaluation)

  • 김경훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF

유류피해지역 어장환경 개선사업의 경제적 효과 분석 (An Analysis on Economic Effectiveness of Environment Improvement Project in Oil Spill Damaged Fishing Grounds)

  • 김홍식;전형주;김도훈
    • 수산해양교육연구
    • /
    • 제28권6호
    • /
    • pp.1781-1791
    • /
    • 2016
  • This study aimed to analyze the economic effectiveness on environment improvement project that has been implemented in five fishing grounds of Taean-gun which had been damaged by the Hebei Spirit oil spill accident. In the analysis, first, this study performed the survey on residents perceptions about the environment improvement project. Second, the cost-benefit analysis was carried out to evaluate the economic effectiveness of the project. The survey results of residents perceptions indicated that the damage of oil spill was considerable in the target areas. It also showed that residents wanted to continue the environment improvement project and the levels of project satisfaction were quitely high. The economic results showed that 3 areas(Woong-do, Wang-san, and Dang-mi) would have positive values of NPV and B/C ratio, but the other(Nu-dong) would have negative values. The findings of this analysis could be used as the base data for increasing operational efficiency of future environment improvement projects.

경지정리사업의 확장편익-비용분석 - 충남서산시 지곡지구를 중심으로 - (An Extended Benefit-Cost Analysis of Land Consolidation and On-farm Development Project -With Respect to Jigok Land Consolidation and On-farm Development Project in Seosan, Chungnam Province, Korea-)

  • 임재환;이민수
    • 농업과학연구
    • /
    • 제29권1호
    • /
    • pp.66-83
    • /
    • 2002
  • The economic feasibility analysis including benefit-cost ratio and internal rate of return of a land consolidation and on-farm development project was mainly depended upon the direct benefits and costs arising during project life. Therefore the projects were neglected in allocating the government's financial funds and loans on account of the low economic rate of return of the project. Accordingly the extended benefit-cost analysis method should be introduced and adapted to cover not only the benefit s such as non-market values of environmental and food security fun ct ions of the project but also market values of the project outputs. The main purposes of this study are (1) to prepare a guide line for economic feasibility analysis based on the IBRD and ADB guidelines, (2) to estimate the benefits from productivity increase, labor saving, savings of O&M cost of farm mechanization and project facilities, savings of farmer's burden for their public health, increasing environmental and public functional value of paddy fields, improving food security condition and formation of peaceful and uncontroversial rural society by implementing the land consolidation and on-farm development, (3) to introduce the newly adapted analytical method as the extended benefit cost analysis which could make possible to be included the values of non-market goods such as the food security and the environmental public function of paddy fields. To carry out this study, the existing publications on the guidelines for economic agricultural projects were reviewed and consultation was made with a For the post evaluation study of the land consolidation and on-farm development project, field survey in Jigok and other comparative area were made to get available information. According to the project completion report, Jigok land consolidation and on-farm development project has 55ha of benefit area out of 69ha of gross area. The project was started in November 11th, 2000 and completed october 30th, 2001. The total project costs were amounted to 2,548 million won and the annual project benefits were estimated at 335million won evaluated by domestic market prices. The ERR(Economic Rate of Return) and SRR(Social Rate of Return) of the project based on the shadow pricing system were estimated at 4.4% and 16% respectively. On the other hand, the ERR and SRR based on the domestic market value system were amounted to 6.37% and 14.62%. In conclusion, Korean land consolidation and on-farm development projects have not carried out from the view point of economic rate of return under shadow pricing system but from the view point of domestic pricing system. For the future feasibility studies on land consolidation projects have to be carried out including the non-market values as environmental and food security function of the projects.

  • PDF

CMMI 기반의 측정 및 분석 프로세스 개선 (Measurement and Analysis Process Improvement Based on CMMI)

  • 한혁수;도성룡
    • 한국IT서비스학회지
    • /
    • 제10권4호
    • /
    • pp.229-242
    • /
    • 2011
  • It is necessary to have measurement and analysis activity for managing software project. At least, every project measures time and cost in order to figure it out whether it will finish within its deadline. CMMI has Measurement and Analysis process in Maturity Level 2. In Measurement and Analysis process, Indicators for decision making in project management are defined and analysis procedure of the measurements to get the indicators are specified. Also, the way of collecting the data and storing them is also planned. Establishing efficient and effective measurement and analysis process in the organization by improving existing process is very important for project success. In this paper, we provide a method for analyzing the measurement and analysis process and improving it based on IDEAL model. It will support the organizations which are trying to adopt CMMI to establish measurement and analysis process.

식스시그마 프로젝트 만족도 측정과 실증적 분석 (Measurement of Satisfaction and Empirical Analysis in Six Sigma Project)

  • 이도경;이명호
    • 산업경영시스템학회지
    • /
    • 제33권4호
    • /
    • pp.193-200
    • /
    • 2010
  • In this study, we took the census of the project satisfaction level of the employees who have participated in Six Sigma projects. We divided and measured the project satisfaction by the steps of performing the project (team building, execution, ownership and support step). We performed the analysis of variance to show the main factors of project satisfaction level, and the tests of homogeneity to know the relationship the business parts and among the job positions each. The results of analysis showed that the satisfactions of the team building and execution step were significant.

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • 제14권3호
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.