• 제목/요약/키워드: Project System

검색결과 6,664건 처리시간 0.042초

Practical Requirements and Verification Management for Requirements-based Development Process in Space Launch Vehicle Development Project (요구조건 기준의 개발 수행을 위한 우주발사체 개발사업의 실제적인 요구조건-검증 관리 체계)

  • Dong Hyun Cho;Jun Hyouk Jang;Il Sang Yoo
    • Journal of the Korean Society of Systems Engineering
    • /
    • 제19권1호
    • /
    • pp.56-63
    • /
    • 2023
  • For the success of system development, it is necessary to systematically manage the requirements that are the basis of system development and its verification results. In order to follow the principles of SE(Systems Engineering)-based V&V(Verification&Validation) process, requirements can be managed by securing the requirements and their establishments, design compliances, and verification compliances according to the system development lifecycle. Especially, in a large-complex system research and development project, such as a space launch vehicle development project, many participants establish, verify, and validate numerous requirements together during the project. Therefore, logical and systematic requirements management, including guarantee of data integrity, change history, and traceability, is very important for multiple participants to utilize numerous requirements together without errors. This paper introduces the practical requirements and verification management for the requirements-based development process in the space launch vehicle development project.

A Study on the Impact of the PMS Quality on Performance in Information Systems Project (IS프로젝트에서 PMS 품질이 성과에 미치는 영향에 대한 연구)

  • Jeong, Cheonsu;Ahn, Hyunchul
    • Knowledge Management Research
    • /
    • 제13권3호
    • /
    • pp.79-103
    • /
    • 2012
  • Recently because the IS development project is large scale and complicated, the necessity of tools that can manage effectively smooth communications and the harmonized project between the interested parties is exposed. According to this fact, many companies are investing enough to the PMS (Project Management System) for the sake of the systematic management of the IS development project, and also this PMS is emerging as one of the indispensable tools for the successful IS development project by casting off from a auxiliary means for the past project management. However, as had been expected, whether the introduction of the PMS is possible to facilitate communications within a project team, and a main motivation that can derive individual performance and organizational performance that participated in the IS development project is induced or not are not verified still empirically and apparently. With respect to this, a survey was conducted to examine how PMS quality affected user satisfaction, communication, individual performance and project performance. The effects of the data gathered were verified by structural equation model analysis.

  • PDF

A Study on Core Competencies of ITS Project Managers Using QFD and AHP (QFD와 AHP를 이용한 ITS 프로젝트관리자 핵심역량 연구)

  • Lee, Bong Woo;Kim, Ja-Hee;Kim, Woo-Je
    • Journal of Information Technology Services
    • /
    • 제10권1호
    • /
    • pp.89-103
    • /
    • 2011
  • ITS (Intelligent Transportation System) has been more popular but ITS project managements remain complex because of diverse stakeholders and multidisciplinary processes of ITS. The multidisciplinary process enforces specialized competencies on ITS project managers comparing to other system integration project managers. In this paper, we derived core competencies of ITS projects from previous researches, built the hierarchy of the competencies, and employed AHP (Analytic Hierarchy Process) surveying ITS project managers and auditors with the hierarchy. Finally, we analyzed the difference of evaluation model on ITS project manager between project managers and auditors using Mann-Whitney U test. Additionally we suggest a method of building MECE (Mutually Exclusive and Collectively Exhaustive) structure for AHP using the HoQ (House of Quality). We expect our model to give some inspirations for raising capable ITS project managers and selecting a proper project manager for an ITS project.

The Effects of Scope Management on Process Performance and Output Performance in the Information System Development Project : An Analysis from Project Supplier's Perspective (공급자 관점에서 정보시스템 개발 프로젝트의 범위관리활동이 프로세스성과와 결과물성과에 미치는 영향에 대한 연구)

  • Park, Bong-Gu;Lim, Gyoo-Gun;Yoo, Weon-Sang
    • Journal of Information Technology Services
    • /
    • 제8권3호
    • /
    • pp.83-100
    • /
    • 2009
  • Even though the success of the information system (IS) protect becomes a critical issue to an enterprise and there has been a lot of research about finding critical success factors of IS projects, the scope management for the success of IS protect has received little attention in the literature. The purpose of this research is to investigate the effects of the project scope management activities defined by PMI (Project Management Institute) on the performance of the information system project. The focus of this paper is on the project supplier's point of view. This study shows the priority of the scope management activities during the IS Project. The results show the different results depending on the types of the project clients and the project scale. This research reveals that the scope verification is important for the project supplier from the project process view, and that the scope planning/definition is important for the protect client from the project result view. It also shows different results comparing to the conventional recognition about project success. The research results show that the positive relationships between the project scale and the importance of scope management activities, and between the familiarity of suppliers and clients and the importance of the scope management activities. Through this research, we expect that the importance of the scope management in a project will be considered as an important issue, and that this research will lead to various detailed research about this issue.

A Model for Project Selection of Information System (정보시스템 프로잭트의 선택원리)

  • 지원철
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • 제10권1호
    • /
    • pp.79-83
    • /
    • 1985
  • This purpose of this study is to suggest a tentative model for project selection of information system. In constructing a mathematical model, quantification of decision criteria is tried to lessen difficulties of measuring benefits of information system project. Suggested model enables us to select projects in the context of portfolio and information system policy.

  • PDF

Design of Process Support System based on CMMI (CMMI 기반 프로세스 지원 시스템 설계)

  • Choi, Dong-Hee
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • 제12권3호
    • /
    • pp.344-353
    • /
    • 2009
  • In this paper, I have proposed a design of process support system based on CMMI process which can support integrated management and repository for CMMI model processes. The system assists small organization to improve business process and offers institutionalized automatic environment to users for use of CMMI processes. The proposed system also can enhance quality and productivity of project by including features such as convenience of project management, planned project administration and steady process improvement.

The Management Schema of Urban Transit Infrastructure for Standardization (도시철도시설 표준화를 위한 관리체계 연구)

  • Lee, Woo-Dong
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1824-1826
    • /
    • 2007
  • Since standardization project is composed of complicate system, such as vehicle, signal, electric power and railway, how to build management system of the project has influence on the success of the project for the first stage of the project. The computer system design tool supports to carry out requirement analysis, DB construction, and history and follow-up management efficiently. Therefore, the aim of this study is to investigate the method to optimize schema using computer system design tool.

  • PDF

Project Selection & Evaluation System Design and Implementation-Literature Review and Case Study- (연구과제 선정.평가 체계설계에 관한 연구)

  • 용세중;최덕출;한종우;정용훈;이원영
    • Journal of Technology Innovation
    • /
    • 제2권1호
    • /
    • pp.116-141
    • /
    • 1994
  • This paper presents a model for R&D project selection and evaluation system design developed through literature review. The model emphasizes the fitness between the five elements of the system : evaluation phase and purpose, personnel and organization, evaluation critiria and decision model, evaluation form and procedure, and projects. The model was applied in real situation as a test case. The important findings are that a good project selection and evaluation model contributes only partially to the effectiveness of the project selection and that system development and implementation activity is a dynamic and multi-facetted learning process.

  • PDF

A Study on Construction of Management System for Efficient Management and Application of Regional Development Project (지역개발사업의 효율적 관리 및 활용을 위한 관리체계 구축에 관한 연구)

  • Kim, Nam-Jung
    • Land and Housing Review
    • /
    • 제7권1호
    • /
    • pp.1-8
    • /
    • 2016
  • This research has its objective in searching for a management plan that is stronger than existing plan for the regional development project in time for the execution of "Regulations on Regional Development and Support". Accordingly, the following plans for improvement are suggested to make improvements in lack of regional development projects management awareness; absence of integrated management system; and lack of reliability in project management information. Firstly, the management of regional development project needs to be operated as a system for project evaluation management based on related legislations. Secondly, various information of regional development project should construct a database, which becomes an information system that can be utilized by the central government and regional governing organizations. Third, to promote efficiency in regional development project management and expertise, it is necessary to prepare a project management system utilizing professional outsourcing organizations and such. Lastly, it is necessary to improve the work environment to enhance the expertise and the responsibilities of those government officials in charge of the project.

Stochastic Project Scheduling Simulation System (SPSS III)

  • Lee Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • 제6권1호
    • /
    • pp.73-79
    • /
    • 2005
  • This paper, introduces a Stochastic Project Scheduling Simulation system (SPSS III) developed by the author to predict a project completion probability in a certain time. The system integrates deterministic CPM, probabilistic PERT, and stochastic Discrete Event Simulation (DES) scheduling methods into one system. It implements automated statistical analysis methods for computing the minimum number of simulation runs, the significance of the difference between independent simulations, and the confidence interval for the mean project duration as well as sensitivity analysis method in What-if analyzer component. The SPSS 111 gives the several benefits to researchers in that it (1) complements PERT and Monte Carlo simulation by using stochastic activity durations via a web based JAVA simulation over the Internet, (2) provides a way to model a project network having different probability distribution functions, (3) implements statistical analyses method which enable to produce a reliable prediction of the probability of completing a project in a specified time, and (4) allows researchers to compare the outcome of CPM, PERT and DES under different variability or skewness in the activity duration data.