• Title/Summary/Keyword: Project System

Search Result 6,677, Processing Time 0.036 seconds

Effect of Investment Evaluation Criteria of Public ICT Projects on Business Success (공공 정보통신기술(ICT)사업의 투자 평가기준이 사업성공에 미치는 영향)

  • Kim, Yong-Kul;Lee, Sang-Yun;Chae, Myeong-Sin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.21 no.4
    • /
    • pp.157-169
    • /
    • 2021
  • Establishing an investment evaluation system for public ICT projects is ultimately to increase the success rate of public ICT projects in which government finances are invested and to revitalize the projects, thereby establishing a foundation for national economic growth and enhancing the competitiveness of the global ICT industry. This study tried to empirically verify the effect of public ICT project investment evaluation factors established according to the existing evaluation system on actual project success, and to suggest directions for future investment evaluation factors. Five evaluation factors such as public interest, economic feasibility, technology, policy and budget efficiency were derived through prior research, and the effect of these evaluation criteria on actual project success was verified through questionnaires from experts who directly participated in the actual project. In addition, it was confirmed whether the government's support system had a moderating effect between the investment evaluation factors and the project success of the ICT project. The reliability and validity of measurement tools, structural model analysis, and path analysis were empirically analyzed, and the significance of existing ICT investment evaluation factors was verified.

Analyzing of Project Satisfaction and Intention of Participants about Public Management System Evaluation Indicators of Urban Redevelopment Projects (도시정비사업의 공공관리제도 평가요인에 대한 참여자의 사업만족과 참여의사 영향구조 분석)

  • Lee, Jeong-Jae;Kim, Gu-Hoi;Lee, Joo-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.6
    • /
    • pp.418-428
    • /
    • 2016
  • The participants in an urban and housing redevelopment project were categorized as construction companies, government employees, and housing cooperatives. This study analyzed how a public management system affects the continuous participation intention using comprehensive project satisfaction. The specific factors for the evaluation items of a public management system were composed using advanced research. A hypothesis and research model was set up and verified using the PLS-SEM model to analyse how the continuous participation intention is affected by the public management system via comprehensive projects satisfaction. Setting the project plan and selecting the project tool, as well as post management and sustainability affect the comprehensive projects satisfaction meaningfully in the case of construction companies. The participation of the user, and post management and sustainability affect the comprehensive project satisfaction meaningfully in the case of government employees. The operating organization and using and participation of the user affect the comprehensive project satisfaction meaningfully in the case of a housing cooperative. The comprehensive project satisfaction affects the continuity of the participation meaningfully in the case of all of project participants.

Water Quality Conservation in Rural Areas of Japan - Case Study of Rural Sewerage Project -

  • Taniyama, Shigetaka;Sugita, Hideo
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.42
    • /
    • pp.50-60
    • /
    • 2000
  • In this presentation I would like to introduce the Rural Sewerage Project, subsidized by the Ministry of Agriculture, Forestry and Fisheries (MAFF), for the purpose of water quality conservation and improvement of life in rural areas of Japan. Specifically, it will cover background information on the inauguration of the Project, its strong points, wastewater technology and some of its problems, system of the Project, etc.

  • PDF

Development Of EPC Project Management Procedure Manual System For Plant Project Management (플랜트 프로젝트관리를 위한 EPC전자업무절차시스템 개발)

  • Park, Bum-Jin;Lee, Min-Jae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.487-491
    • /
    • 2006
  • As Korea has been industrialized high recently, the constructional plant part which is the major driving force to Korean economic growth is being developed. In spite of the great importance, there are many ill-prepared parts in EPC project management procedure, and working in practice of EPC project management procedure manual is not systematic. That is why the governmental progressive policy on the relevant technology and the establishment of EPC project management procedure are needed. This study was aimed to derive reform measures by analyzing problems of EPC project management procedure manuals which are in use at 13 large-sized construction companies currently. The reform measures which are based on the theory of PMI(Project Management Institute)'s PMBOK(Porjcet Management Body Of Knowledge) are about deriving administration factors to control the project, and EPC project administration factors are derived from the definition of CMAA(Construction Mangement Association of America). The reformed electronic EPC project management procedure manual system is set up by standardizing derived administration factors.

  • PDF

Quantitative Management for IT Program in Pubic Sector

  • Ra, Jong-Hei;Choi, Kwang-Don
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.11a
    • /
    • pp.257-267
    • /
    • 2004
  • This study presents methodology framework that can help to manage IT program in the public sector. Existing project management methods usually focus on system providers and could have various and abstract interpretations. So, it is difficult to apply existing project management methods in the public sector. It also makes each individual project management easier by reflecting characteristics of IT project so that it can provide management models of performance measurement. It is found that given framework in management methodology get positive analysis and addition to be applied in the individual project management and various IT programs nationwide. It is expected that scientific and systematic project management can bring successful promotion and management of IT project through the application of this project management methodology.

  • PDF

A Risk Analysis Model Using VERT for R & D Project Management (R & D 프로젝트의 위험분석모형의 연구)

  • 황홍석
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.1
    • /
    • pp.85-99
    • /
    • 1995
  • Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.

  • PDF

Systems Engineering Application of Imaginary WIG(Wing-In-Ground Effect) Ship Acquisition Project (가상 함정획득사업의 Systems Engineering 적용 (INCOSE SE Handbook ver. 3.1 중심으로))

  • Lee, Su Oek;Shin, Seung Chun;Choi, Nag Jun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.5 no.1
    • /
    • pp.57-65
    • /
    • 2009
  • The purpose of Defense Acquisition Project is that the superior weapons validated needs and performance are supplied to military user with limited financial resources and time. The Warship Acquisition Project is not only like this, But also has special characteristics of long project period and first-constructed ship's operation employment. So, The Warship Acquisition Project need systematic and efficient procedure & management. And this paper researches System engineering application of imaginary WIG(Wing-In-Ground Effect) ship acquisition project based Systems Engineering Handbook ver.3.1 published by INCOSE, the lead of field. The Imaginary WIG(Wing-In-Ground Effect) ship acquisition project applied the four processes(technical project, Enterprise & Agreement, Enabling Systems), the basis of INCOSE Engineering Handbook ver.3.1, and the each process output compared with DAPA(Defense Acquisition Program Administration)'s warship acquisition procedure.

  • PDF

A Study on Results and Improvement Method of Advanced Rural Village Development Project (전원마을조성사업의 성과와 개선방안 연구)

  • Jeong, Jong-Sool;Kim, Kang-Sub;Kang, Byung-Hwan;Lee, Sang-Jung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.12 no.2
    • /
    • pp.125-133
    • /
    • 2010
  • The advanced rural village development project started in 2005, and this project of purpose is improvement of housing environment and promotion of region activation. Researcher investigated about the advanced rural village development project of nine complex through field survey. The aim of this study is to be offered data of idyllic housing policy by examination actual conditions of study subject. Based on this study, mainly three results can be drawn as follows ; first, this project makes a great contributed to flow in population from urban to activate rural areas. Second, the project success depends on improvement an institution and planed, timely approach. Third, central government must plan network system with rural development project in political, and must support local government into political frame. The local government must consider a regional housing plan overall and must make an effort itself for the project success.

QUANTITATIVE ANALYSIS FOR THE RISK MANAGEMENT OF A SUPER-HIGHRISE RESIDENCE

  • Shuzo Furusaka;Takashi Kaneta;Makoto Ohsaki;Kazunori Harada;Yasuhiro Orita;Sohsuke Arai;And Norikazu Katoh
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.748-753
    • /
    • 2005
  • In a super-highrise residence project, a project manager needs to form the long-term risk management plan which covers the problems from the beginning of project to the time of demolition. The cause and responsibility for a risk are clarified and quantitatively evaluated through the life cycle of a project. Development of the system which supports a risk strategy effectively is needed as a project becomes complex. In this paper, through the life cycle of a specific super-highrise residence project, a risk phenomenon is specified from a viewpoint of each participant, and the mathematical model is formulated choosing the combination of the optimal strategy against a risk quantitatively within a fixed risk strategy budget.

  • PDF

A study of system functions allocation of wireless communications based train control system (도시철도용 무선통신기반 열차제어시스템 기능배치 연구)

  • Yoon, Yong-Ki;Oh, Seh-Chan;Kim, Min-Su;Kim, Yong-Kyu;Choi, June-Young;Park, Jae-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2300-2305
    • /
    • 2011
  • A Train control system is intended to assure train operation safety and to improve train operation efficiency. To perform these missions, the Train Control System consists of train safety space control part, train route control part and train operation management part. Train control technology changed from track circuit based to wireless based. And Wireless based train control technologies were developed by some railway signaling companies in Korea. To commercialize these control technologies, the development project is carried now. This project did analyze system requirements, and made the system development specification. Now this project finished system functions allocation, which will be performed by some subsystem. This paper describes roles of each function and the allocation of these functions to each subsystem.

  • PDF